Supporting Documentation · Jun 3, 2026
JMA02P00301 262 270 MAIN STREET
d7c4d01f73b7886c3ee3ab9014a1ed38e8d85378c42ecba1f33c333b9396bb64Indexed text
1. THE FOLLOWING NOTES APPLY TO ALL SHEETS OF THESE DOCUMENTS. 2. CONTRACTOR SHALL COORDINATE CONSTRUCTION ACTIVITIES, SCHEDULE, WORKING HOURS, AND ACCESS TO SITE WITH PROPERTY OWNER. R-T R-T
R-T R ESSEX
3. THE CONTRACTOR SHALL COORDINATE ANY STORAGE ON SITE WITH THE PROPERTY OWNER. THE CONTRACTOR SHALL DISPOSE OF ANY PAVEMENT/SUBGRADE REMOVED FOR CONSTRUCTION, AT NO ADDITIONAL COST TO THE OWNER. =1 0' 00
00 00 =1 0'
4. CONTRACTOR SHALL COMPLY WITH LOCAL CONSTRUCTION STORMWATER DISCHARGE REGULATIONS AND REQUIREMENTS. R I 5. PRIOR TO EXCAVATION FOR NEW STRUCTURES, ELECTRICAL CONDUIT, FABRICATION OF NEW PIPING AND/OR OTHER PROPOSED UTILITIES, VERIFY ALL EXISTING PIPING AND UTILITIES IN THE WORK AREA. THE CONTRACTOR SHALL TEMPORARILY RELOCATE CONFLICTING
EXISTING UTILITIES AT TIE-IN CONNECTION LOCATIONS AND REINSTALL AS REQUIRED TO ELIMINATE THE CONFLICT AT NO ADDITIONAL COST TO THE OWNER. B-1 6. CONTRACTOR SHALL ADEQUATELY PROTECT ALL EXISTING PIPELINES AND STRUCTURES DURING INSTALLATION OF DRY WELL SYSTEM.
' 00 7. ALL LOCATIONS, DIMENSIONS, AND ANGLES OF NEW FACILITIES ARE TO BE VERIFIED IN THE FIELD. CONTRACTOR IS ADVISED THAT MINOR ADJUSTMENTS MAY BE REQUIRED TO AVOID POTENTIAL CONFLICTS. 10
10 R= R 8. ALL EARTHWORK ACTIVITIES SHALL COMPLY WITH THE COUNTY SOIL CONSERVATION DISTRICT'S RULES AND REGULATIONS GOVERNING EROSION CONTROL.
ISTRICT'S RULES AND REGULATIONS GOVERNING EROSION CONTROL. RED =1 0 R-T
00 9. THE SITE PLAN INDICATES THE APPROXIMATE LOCATION OF EXISTING PIPING. THE CONTRACTOR SHALL LOCATE ALL EXISTING PIPE BY TEST PIT AND/OR TEST TRENCH TO AVOID POSSIBLE CONFLICTS WITH NEW PIPING. THE CONTRACTOR SHALL NOTIFY ALL UTILITY '
File revisions (1)
- Sep 29, 2026
d7c4d01f73b748,133,724 bytes