Supporting Documentation · Jun 3, 2026
JMA02P00301 262 270 MAIN STREET
d7c4d01f73b7886c3ee3ab9014a1ed38e8d85378c42ecba1f33c333b9396bb64Indexed text · page 10
Show all pages---- ---- ---- ---- ----
---- ---- 1. MUST SLOW THE STORM WATER TO PROVIDE THE COARSE >5% BASE COURSE, MIX I-2 1 1" REBAR SEDIMENT PARTICLES A CHANCE TO SETTLE, AND PROVIDE FOR BAG AN AREA TO RETAIN THE PARTICLES THAT HAVE SETTLED. 1. AS
FOR BAG AN AREA TO RETAIN THE PARTICLES THAT HAVE SETTLED. 1. AS PRESCRIBED BY LOCAL ORDINANCE OR OTHER GOVERNING AUTHORITY. REMOVAL DUMP FROM STRAP 2. IN ALL CASES, INLET PROTECTION SHOULD NOT INLET COMPLETELY CLOSE OFF THE INLET. D5 DETAIL: STABILIZED CONSTRUCTION ENTRANCE R 3. THE PROTECTION DEVICE WILL BE DESIGNED TO CAPTURE C1.10 SCALE: NTS No.
No. OR FILTER RUNOFF FROM THE 1 YEAR, 24 HOUR STORM ---- ---- ---- ----
---- ---- ---- ----
---- ---- ---- ---- 01
01 SILTSACK AS MANUFACTURED EVENT AND SHALL SAFELY CONVEY HIGHER FLOWS BY ACF DIRECTLY INTO THE STORM SEWER SYSTEM. · OTHER METHODS THAT ACCOMPLISH THE PURPOSE OF ANCHOR PINS NO. 5 STEEL BARS CONTROL NOTES AND DETAILS
CONTROL NOTES AND DETAILS STORM SEWER INLET PROTECTION MAY BE USED IF SOIL EROSION AND SEDIMENT TWO PER BALE NEW JERSEY APPROVED BY THE SOIL CONSERVATION DISTRICT. · INSPECTIONS SHALL
· INSPECTIONS SHALL BE FREQUENT. MAINTENANCE, REPAIR, 262-270 MAIN ST SITE REDEVELOPMENT AND REPLACEMENT SHALL BE MADE PROMPTLY, AS NEEDED. THE BARRIER SHALL BE REMOVED WHEN THE AREA DRAINING TOWARD THE INLET HAS BEEN STABILIZED. · THE CONTRACTOR SHALL INSTALL STORM SEWER INLET STOCKPILE
STOCKPILE JORGE MASTROPIETRO ARCHITECTS PROTECTION IN ACCORDANCE WITH THE SE&SC IN NJ, #30, JULY 1999. OF ERODIBLE MATERIAL SITE CIVIL DESIGN
File revisions (1)
- Sep 29, 2026
d7c4d01f73b748,133,724 bytes