E X T E N S I ON S OF T HE P R O JE C T O R O N A N Y OT HE R THESE RATES APPLY TO ALL METHODS OF SEEDING. ESTABLISHING PERMANENT VEGETATION MEANS 80% VEGETATIVE COVER (OF THE SEEDED SPECIES) AND MOWED ONCE. PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION LENGTH ACCORDING TO TABLE * OR ADAPTATION BY HUDSON ENGINEERING, LLC FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE NOTE THIS DESIGNATION OF MOWED ONCE DOES NOT GUARANTEE THE PERMANENCY OF THE TURF SHOULD OTHER MAINTENANCE FACTORS BE NEGLECTED OR OTHERWISE MISMANAGED. RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO
HUDSON ENGINEERING, LLC; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS HUDSON ENGINEERING, *NOTE: 72 HOURS PRIOR TO ANY SOIL DISTURBANCE, NOTICE IN WRITING, SHALL BE GIVEN TO THE FREEHOLD SOIL CONSERVATION DISTRICT AND A PRE-CONSTRUCTION MEETING HELD. EXCESS LLC FROM ALL CLAIMS, DAMAGES, LOSSES AND EXISTING EXPENSES ARISING OUT OF OR RESULTING THEREFROM FLOW GROUNDS PUBLIC R.O.W. CONSTRUCTION SEQUENCE 1. INSTALL CONSTRUCTION ENTRANCE AND OTHER EROSION CONTROL MEASURES INCLUDING SILT FENCING - 1 WEEK
RUCTION ENTRANCE AND OTHER EROSION CONTROL MEASURES INCLUDING SILT FENCING - 1 WEEK BY CHK 2. CLEAR & DEMO SITE, ROUGH GRADING - 1 WEEK ---- ---- ----
---- ---- ---- ---- ----
---- ---- ---- ---- ----
JC 2 EACH DUMP 3. REMOVE EXISTING GRAVEL - 1 WEEK STRAPS RP ----
---- ---- ---- ---- ----
---- ---- ---- ----
---- ---- 4. CONSTRUCT TURFSTONE - 2 WEEKS 5. REMOVE ALL EROSION CONTROL STRUCTURES -1 DAY 5/26/2026 DATE
---- ---- ---- ---- ----