Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jun 3, 2026

JMA02P00301 262 270 MAIN STREET

Preserved file SHA-256d7c4d01f73b7886c3ee3ab9014a1ed38e8d85378c42ecba1f33c333b9396bb64

Indexed text

Page 10

---- ---- ---- ---- 01

Page 10

01 SILTSACK AS MANUFACTURED EVENT AND SHALL SAFELY CONVEY HIGHER FLOWS BY ACF DIRECTLY INTO THE STORM SEWER SYSTEM. · OTHER METHODS THAT ACCOMPLISH THE PURPOSE OF ANCHOR PINS NO. 5 STEEL BARS CONTROL NOTES AND DETAILS

Page 10

CONTROL NOTES AND DETAILS STORM SEWER INLET PROTECTION MAY BE USED IF SOIL EROSION AND SEDIMENT TWO PER BALE NEW JERSEY APPROVED BY THE SOIL CONSERVATION DISTRICT. · INSPECTIONS SHALL

Page 10

· INSPECTIONS SHALL BE FREQUENT. MAINTENANCE, REPAIR, 262-270 MAIN ST SITE REDEVELOPMENT AND REPLACEMENT SHALL BE MADE PROMPTLY, AS NEEDED. THE BARRIER SHALL BE REMOVED WHEN THE AREA DRAINING TOWARD THE INLET HAS BEEN STABILIZED. · THE CONTRACTOR SHALL INSTALL STORM SEWER INLET STOCKPILE

Page 10

STOCKPILE JORGE MASTROPIETRO ARCHITECTS PROTECTION IN ACCORDANCE WITH THE SE&SC IN NJ, #30, JULY 1999. OF ERODIBLE MATERIAL SITE CIVIL DESIGN

Page 10

SITE CIVIL DESIGN INLET SEDIMENT CONTROL DEVICE DETAIL D2 DETAIL: INLET SEDIMENT CONTROL DEVICE ESSEX C1.10 SCALE: NTS HAY BALES NOTE:

Page 10

SIDE SLOPES SHALL BE A MAXIMUM OF 2:1. BACKFILL STOCKPILE PLASTIC MEMBRANE COVER STOCKPILE SHALL BE SEEDED IMMEDIATELY. MATERIAL STOCKPILE DETAIL WEST ORANGE

Page 10

HAY BALES, (TYP.) D6 DETAIL: MATERIAL STOCKPILE C1.10 SCALE: NTS PLASTIC MEMBRANE BOTTOM SECTION DRAWN BY : DESIGN BY : CHECKED BY : SCALE :

Page 10

HP HP JC AS NOTED SHEET #: D3 DETAIL: SOIL STOCKPILE DATE : 05/15/2025

Page 10

C1.10 BINDING ORDER: JOB No. : C1.10 SCALE: NTS JMA02P003.01 10 of 15

File revisions (1)