NON-WOVEN GEOTEXTILE AROUND STONE. TOP AND SIDES THE CULTEC MANIFOLD FEATURE. IT MAY ALSO BE USED AS A COMPONENT OF THE CULTEC MANDATORY, BOTTOM PER ENGINEER'S DESIGN PREFERENCE HIDDEN END MODEL 180IHD 16. THE RECHARGER® 180EHD END UNIT MUST BE FORMED AS A WHOLE CHAMBER HAVING SEPARATOR ROW/ADS ISOLATOR ROW PLUS TO ACT AS A BARRIER TO PREVENT SOIL/CONTAMINANT ALL DOCUMENTS PREPARED BY HUDSON ENGINEERING, ONE FULLY FORMED INTEGRAL ENDWALL AND ONE FULLY OPEN END WALL AND HAVING INTRUSION INTO THE STONE WHILE ALLOWING FOR MAINTENANCE. CULTEC RECHARGER 180HD IN SEPARATOR ROW/ADS FINISHED GRADE ISOLATOR® ROW PLUS CONFIGURATION (IF APPLICABLE) 8.0" [203mm] MIN. FOR RIGID PAVEMENT LLC ARE INSTRUMENTS

Page 14

LLC ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE NO SEPARATE END PLATES OR END WALLS. PROJECT. THEY ARE NOT INTENDED OR REPRESENTED GEOTEXTILE PARAMETERS 8.0" [203mm] MIN. FOR FLEXIBLE PAVEMENT TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON 17. THE HVLV® FC-24 FEED CONNECTOR MUST BE FORMED AS A WHOLE CHAMBER HAVING 1. THE GEOTEXTILE SHALL BE PROVIDED BY CULTEC OF BROOKFIELD, CT. E X T E N S I ON S OF T HE P R O

Page 14

E X T E N S I ON S OF T HE P R O JE C T O R O N A N Y OT HE R TWO OPEN END WALLS AND HAVING NO SEPARATE END PLATES OR SEPARATE END (203-775-4416 OR 1-800-428-5832) PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION WALLS. THE UNIT SHALL FIT INTO THE SIDE PORTALS OF THE RECHARGER® 180HD AND 2. THE GEOTEXTILE SHALL BE BLACK AND WHITE IN APPEARANCE. OR ADAPTATION BY HUDSON ENGINEERING, LLC FOR THE 12' [3.65m] MAX.. SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE ACT AS CROSS FEED CONNECTIONS.

Page 14

SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE ACT AS CROSS FEED CONNECTIONS. 3. THE GEOTEXTILE SHALL HAVE A MARV WEIGHT OF 8.0 OZ/YD2 PER ASTM D5261 TESTING COVER DEPTH RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO METHOD. 6.0" [152mm] MIN. HUDSON ENGINEERING, LLC; AND OWNER SHALL 18. CHAMBERS MUST HAVE HORIZONTAL STIFFENING FLEX REDUCTION STEPS BETWEEN 4. THE GEOTEXTILE SHALL HAVE A GRAB TENSILE STRENGTH OF 325 X 325 LBS (1,445 X 1,445 N)

Page 14

INDEMNIFY AND HOLD HARMLESS HUDSON ENGINEERING, THE RIBS. PER ASTM D4632 TESTING METHOD. LLC FROM ALL CLAIMS, DAMAGES, LOSSES AND 10.0" [250mm] MIN. FOR UNPAVED MODEL 180IHD 5. THE GEOTEXTILE SHALL HAVE A ELONGATION @ BREAK RESISTANCE OF 15 X 15% PER ASTM (REDUCE TO 6.0" [150mm] FOR EXPENSES ARISING OUT OF OR RESULTING THEREFROM 19. THE CHAMBER SHALL HAVE A RAISED INTEGRAL CAP AT THE TOP OF THE ARCH IN THE

Page 14

ESULTING THEREFROM 19. THE CHAMBER SHALL HAVE A RAISED INTEGRAL CAP AT THE TOP OF THE ARCH IN THE D4632 TESTING METHOD. NON-TRAFFIC APPLICATION) CENTER OF EACH UNIT TO BE USED AS AN OPTIONAL INSPECTION PORT OR 20.5" [521mm] 6. THE GEOTEXTILE SHALL HAVE A CBR PUNCTURE RESISTANCE OF 1,124 LBS (5,000 N) PER ASTM CLEAN-OUT. D6241 TESTING METHOD. BY CHK