Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jun 3, 2026

Siad topographical survey from Schmidt5282026

Preserved file SHA-256ae89c9c7a7b505c8597b51579cbebc19ebebdfaa6fb3c2a0f62d68e43c7dd485

Indexed text · page 9

Show all pages
Page 9

TOPSOIL NOT TO BE USED FOR FINAL GRADING SHALL BE REMOVED FROM THE SITE IMMEDIATELY AND PLACED IN A STABILIZED STOCKPILE OR FILL AREA. ALL TOPSOIL REQUIRED FOR FINAL GRADING AND STORED ON SITE SHALL BE LIMED, FERTILIZED, TEMPORARILY SEEDED AND MULCHED WITHIN 21 DAYS. 0' 5' 10' 20' 30' 40' 50' 60' 5. AND DISTURBED AREAS THAT WILL BE LEFT EXPOSED MORE THAN 21 DAYS AND NOT SUBJECT DRAWN BY : DESIGN BY : CHECKED BY : SCALE : TO CONSTRUCTION TRAFFIC, SHALL IMMEDIATELY RECEIVE TEMPORARY SEEDING. MULCH HP HP JC AS NOTED SHALL BE USED IF THE SEASON PREVENTS THE ESTABLISHMENT OF A TEMPORARY COVER. SHEET #: 1 SEDIMENT CONTROL PLAN SCALE: 1/16" = 1'-0" DATE :

Page 9

05/15/2025 C1.09 BINDING ORDER: JOB No. : C1.09 SCALE: 1/16"=1'-0" JMA02P003.01 09 of 15

File revisions (1)