Supporting Documentation · Jun 3, 2026
Siad topographical survey from Schmidt5282026
ae89c9c7a7b505c8597b51579cbebc19ebebdfaa6fb3c2a0f62d68e43c7dd485Indexed text · page 1
Show all pages---- ----
---- ---- 100' 105
105 01 106 01 200' RADIUS KEY MAP ELM WAY C1.01 SCALE: 1"=150'
ELM WAY C1.01 SCALE: 1"=150' NEW JERSEY B-1 GLEN AVE
R-M 262-270 MAIN ST SITE REDEVELOPMENT
03 EXISTING SITE SURVEY C1.01 SCALE: 1"=20' B-2
B-2 JORGE MASTROPIETRO ARCHITECTS
COVER SHEET E DG EHIL GENERAL NOTES:
SITE CIVIL DESIGN L RD 1. THE FOLLOWING NOTES APPLY TO ALL SHEETS OF THESE DOCUMENTS.
2. CONTRACTOR SHALL COORDINATE CONSTRUCTION ACTIVITIES, SCHEDULE, WORKING HOURS, AND ACCESS TO SITE WITH PROPERTY OWNER. R-T R-T R
File revisions (1)
- Sep 29, 2026
ae89c9c7a7b551,124,221 bytes