01 SERIES OR APPROVED EQUAL. 0.5% MIN SLOPE. DOGHOUSE MANHOLE #2 RIM 100.50 INV. 95.84 (EXIST. V.I.F.) DRAINAGE AND GRADING PLAN 1 DRAINAGE AND GRADING PLAN 03 TYPICAL DRIVEWAY PLAN

Page 7

NEW JERSEY C1.07 SCALE: 1/16"=1'-0" C1.07 SCALE: N.T.S. 262-270 MAIN ST SITE REDEVELOPMENT JORGE MASTROPIETRO ARCHITECTS SITE CIVIL DESIGN ABBREVIATIONS EXISTING PROPOSED

Page 7

SITE CIVIL DESIGN ABBREVIATIONS EXISTING PROPOSED ESSEX TC TOP OF CURB BC BOTTOM OF CURB C HEIGHT OF CURB TW TOP OF RETAINING WALL BW BOTTOM OF RETAINING WALL WEST ORANGE W HEIGHT OF RETAINING WALL NOTES: PROPOSED DEVELOPMENT AREA DISTRIBUTION: 1. PER THE 2021 NEW JERSEY IBC CHAPTER 4 SECTION 406. 1. PERVIOUS PAVEMENT 1.1. MAXIMUM SLOPE IN ANY DIRECTION FOR ACCESSIBLE PARKING 1.1. 5,688 SQ FT SPACES SHALL NOT EXCEED 2.0% 2. IMPERVIOUS PAVEMENT 1.2. GENERAL PARKING STALL SLOPES SHOULD NOT EXCEED 5.00%. 2.1. 7,867 SQ FT 2. ALL TRENCH DRAINS SHALL BE POLYCAST 600 SERIES OR 3. BUILDING FOOTPRINT APPROVED EQUAL. 3.1. 13,934 SQ FT

Page 7

FOOTPRINT APPROVED EQUAL. 3.1. 13,934 SQ FT 0' 5' 10' 20' 30' 40' 50' 60' 2.1. DRAINS SHALL BE SLOPED A MINIMUM 0.5% TOWARD RAIN 4. LANDSCAPED AREA DRAWN BY : DESIGN BY : CHECKED BY : SCALE : GARDEN AREA. 4.1. 2,729 SQ FT HP HP JC AS NOTED 3. INSTALL RAIN GARDEN PER DETAILS ON SHEET C1.7. SHEET #: 4. DROPPED CURBS TO BE INSTALLED PER TYPICAL DROPPED CURBED

Page 7

SCALE: 1/16" = 1'-0" DATE : 05/15/2025 C1.07 SIDEWALK DETAILS. REFER TO SHEET C1.4. BINDING ORDER:

Page 7

JOB No. : JMA02P003.01 07 of 15

Page 8

CONSTRUCTION NOTES: 1. THE CONTRACTOR SHALL VERIFY ALL INFORMATION PRIOR TO EXCAVATION INCLUDING ELEVATIONS AND LOCATIONS OF EXISTING UTILITIES. 2. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY IF ANY FIELD CONDITIONS DIFFER MATERIALLY FROM THOSE REPRESENTED ON THESE DRAWINGS AND THE SPECIFICATIONS OR IF, IN THE CONTRACTOR'S OPINION, SAID CONDITIONS CONFLICT WITH THE DESIGNS SHOWN HEREON. H 3. THE ENGINEER SHALL INSPECT ALL PLANTING BED AREAS BEFORE MULCHING TO ENSURE THAT ADEQUATE DRAINAGE EXIST. IF ANY AREAS TO BE MULCHED SHOW EVIDENCE OF POOR DRAINAGE, U THE CONTRACTOR SHALL TAKE CORRECTIVE ACTION. 4. THE CONTRACTOR SHALL AVOID DISTURBING ALL EXISTING TREES. ANY DISTURBANCE TO TREES OR TREE ROOTS MUST BE COORDINATED WITH THE PROPERTY OWNER.