Supporting Documentation · Jun 3, 2026
Siad topographical survey from Schmidt5282026
ae89c9c7a7b505c8597b51579cbebc19ebebdfaa6fb3c2a0f62d68e43c7dd485Indexed text
CONTROL NOTES AND DETAILS STORM SEWER INLET PROTECTION MAY BE USED IF SOIL EROSION AND SEDIMENT TWO PER BALE NEW JERSEY APPROVED BY THE SOIL CONSERVATION DISTRICT. · INSPECTIONS SHALL
· INSPECTIONS SHALL BE FREQUENT. MAINTENANCE, REPAIR, 262-270 MAIN ST SITE REDEVELOPMENT AND REPLACEMENT SHALL BE MADE PROMPTLY, AS NEEDED. THE BARRIER SHALL BE REMOVED WHEN THE AREA DRAINING TOWARD THE INLET HAS BEEN STABILIZED. · THE CONTRACTOR SHALL INSTALL STORM SEWER INLET STOCKPILE
STOCKPILE JORGE MASTROPIETRO ARCHITECTS PROTECTION IN ACCORDANCE WITH THE SE&SC IN NJ, #30, JULY 1999. OF ERODIBLE MATERIAL SITE CIVIL DESIGN
SITE CIVIL DESIGN INLET SEDIMENT CONTROL DEVICE DETAIL D2 DETAIL: INLET SEDIMENT CONTROL DEVICE ESSEX C1.10 SCALE: NTS HAY BALES NOTE:
SIDE SLOPES SHALL BE A MAXIMUM OF 2:1. BACKFILL STOCKPILE PLASTIC MEMBRANE COVER STOCKPILE SHALL BE SEEDED IMMEDIATELY. MATERIAL STOCKPILE DETAIL WEST ORANGE
HAY BALES, (TYP.) D6 DETAIL: MATERIAL STOCKPILE C1.10 SCALE: NTS PLASTIC MEMBRANE BOTTOM SECTION DRAWN BY : DESIGN BY : CHECKED BY : SCALE :
HP HP JC AS NOTED SHEET #: D3 DETAIL: SOIL STOCKPILE DATE : 05/15/2025
C1.10 BINDING ORDER: JOB No. : C1.10 SCALE: NTS JMA02P003.01 10 of 15
0.5 H 1.0 REAR SETBACK 65'-3 1/8 105'-2 3 2.0 0.5 " /8" U HE 17'-1 3/8" 1.0 2.0 0.5 ACK 1. 0
ACK 1. 0 39'-11 1 D 3'-8" 40'-0" 2.0 0.5 /2" 10'-0" R SETB DN 1.0 L-1 2.0 S
File revisions (1)
- Sep 29, 2026
ae89c9c7a7b551,124,221 bytes