Settlement of Litigation Agreement 2020

Preserved file SHA-25674e67d2bd4644901e7153c749b77074979a896d934f7de24a26b2586e2b342ec

Indexed text

Page 41

ept Plan, because same is likely required by New Jersey’s Residential Site Improvement Standards (“RSIS”). However, if RSIS permits the closure of Kuzik Drive, then Kuzik Drive shall be designated for emergency access only, If RSIS requires Kuzik Drive to remain open, WEHI shall seek a waiver from RSIS requiremenis before the Planning Board in connection with WEHI’s application for the Proposed Development. If the request for a waiver is denied, then Kuzik Drive shall serve as a secondary access point along with Warner Road, If Kuzik Drive remains open, WEHI shall employ traffic calming measures (.e., speed bumps, humps and/or tables) intended

Page 42

to route as much traffic as possible onto Warner Road, to the extent permitted by RSIS (to be discussed and designed as the construction of the Proposed Development progresses); 8. Bayowski Drive shall remain a cul-de-sac, but may provide emergency access to the Subject Property; 9. Emergency access to the Subject Property shall be via Howell Drive and Bayowski Drive, to the extent required by the Township and/or Planning Board. If permitted by RSIS or if WENT obtains a waiver (see No, 6, above), then Kuzik Drive shall also serve as emergency access to the Subject Property. All emergency access points shall include physical barriers to deter and prevent non-emergency access; 10. WEHI to install speed bumps/traffic calming devices and/or signage on Association lands where necessary (to be discussed and designed as the construction of the Proposed Development progresses); 11. WEHI to install landscaping, buffering and speed calming measures/devices along Warner Road and Kuzik Drive within Association lands in connection with transforming Warner Road into a “boulevard” (to be discussed and designed as the construction of the Proposed Development progresses); 12, The construction of the Proposed Development will not result in any loss of parking on Association lands; 13. Before the commencement of construction of the Proposed Development, and within thirty (30) days following nonappealable site plan and related municipal land use approvals for the Proposed Development, WEHI will pave the portion of Oval Road fiom Oval Road’s intersection with Bagle Rock Avenue fo Oval Road's intersection with Warner Road; 14. Contemporaneously with the commencement of the paving of the first portion of the final course of roadway paving within the Proposed Development, WEHI shall restore and repave the following Association roads (the “Shared Roads”); Oval Road from Eagle Rock Avenue to Warner Road; Warner Road; Kuzik Drive; Reger Lane; a portion of Lapis Circle (southeast quadrant connecting Reger Lane to the northeast segment of Lapis Circle and continuing to its intersection with Kuzik Drive) and Bayowski Drive; 15, Warner Road shall be the only road utilized by WEHI in connection with the construction of the Proposed Development. WEHI shall in good faith limit construction traffic and employ dust control/street cleaning measures, as necessary. WEHI shall not

Page 42

WEHI in connection with the construction of the Proposed Development. WEHI shall in good faith limit construction traffic and employ dust control/street cleaning measures, as necessary. WEHI shall not permit construction deliveries on Saturday, Sunday or holidays. No construction parking/idling shall take place within or near Association property; 16, WEHI shall provide the Association with at least 2-weeks’ notice of any road closures or utility interruption;

Page 43

17. During construction of the Proposed Development, WEHI shall ensure access to and passage along Warner Road and Oval Road, and Wamer Road and Ova! Road shall be kept in good repair, i.e. fixing of potholes, etc; : 18. At the commencement of construction of the Proposed Development, WEHI and the Association shall divide the cost for the maintenance of Warner Road and the portion of Oval Road from Eagle Rock Avenue to its intersection with Warner Road, and any other common costs inourred by the Association in accordance with the ratio of 496 (WEHI): 300 (Association). As used in this Agreement, maintenance with respect to the Shared Roads shall mean and include, by way of example and not limitation, services, maintenance, repair, improvement and replacement with respect to the following: snow, ice, leaf and debris removal; catch basin and stormwater cleanout and repair; curb repair; paving; crack filling; traffic calming devices; sealcoating; line striping; and lawn, irrigation and landscaping services of the boulevards and island areas. The Association shall not be responsible for any roads or other improvements within or installed in connection with the Proposed Development, unless otherwise expressly agreed by the parties; 19. At the commencement of Construction, WEHI and the Association shall divide the cost of snow removal for Bayowski Drive and Kuzik Drive; 20. WEHI will support any effort by the Association to have Oval Road dedicated to the Township of West Orange; 21. WEHI will obtain approval for and install a traffic signal at the intersection of Oval Road and Eagle Rock Avenue; 22. WEHI will agree to install a bus shelter on the eastbound side of Eagle Rock Avenue at the " entrance to Oval Road, to the extent WEHI is permitted to do so by the Township of West Orange and/or the County of Essex under conditions reasonable to WEHI; 23. WEHI does not intend to utilize the Association’s sewerage pump station in connection with the Proposed Development, However, if engineering concerns and/or the Township require the use of the Association’s pump station, WEHI shall, at its own cost, upgrade the pump station so that sewer services to the Association will not be adversely affected by the Proposed Development. In that event, WEHI shall enter into an agreement pursuant to which WEHI will split the cost/maintenance for the pump station on a 300:496

Page 43

n will not be adversely affected by the Proposed Development. In that event, WEHI shall enter into an agreement pursuant to which WEHI will split the cost/maintenance for the pump station on a 300:496 ratio. If WEHI needs fo utilize the pump station, no upgrades to the pump station may be performed until WEHI and Association enter into a separate agreement regarding the use of and upgrades to the pump station, which the parties will negotiate in good faith; 24, WEHI will install a guardhouse with a gate, subject to approval by the Planning Board of the Township of West Orange, to be utilized by ihe Association and the Proposed Development. :

Page 44

25. 26. WEHI recognizes that the Association's preference is to have the guardhouse located on Oval Road southeast of Oval Road’s intersection with Bongart Drive, However, WEHI and the Association recognize the existence of a Declaration of Easement and Right of Way Agreement dated January 19, 1988 (the “Easement”) recorded with the Essex County Clerk in Deed Book 5012, Page 571 between WEHI (predecessor in-interest to the lands owned by the Association), Essex Fells Country Club, and Allied Signal, Inc., which Easement is binding upon the Association. Notification of the Zasement was contained in the Public Offering Statement for the Association’s condominium. Although it is not clear from the Basement as to which party or parties hold a fee simple ownership interest in Oval Road, or any portion thereof, the Easement generally provides that each party fo the Easement grants to the other parties to the Easement “a permanent easement for reasonable ingress and egress on and across” all of Oval Road from Oval Road’s intersection with Eagle Rock Avenue to the border of the Township of Essex Fells. The parties recognize that it is possible that all of Oval Road is not owned by the Association. The parties further recognize that Essex Fells and West Orange also have emergency access rights over a portion of Oval Road, Notwithstanding the Easement, WEBI will attempt to obtain all necessary land use approvals for the installation of the guardhouse on Oval Road southeast of Oval Road’s intersection with Bongart Drive, the Association’s preferred location. However, if after reasonable due diligence, WEHI determines in good faith that the Easement or any other legal impediment will prevent the installation of the guardhouse on Oval Road, WEHI will notify the Association of any such impediment and meet with the Association in good faith to decide upon an alternate, mutually-agreeable location for the guardhouse, including but not limited to Warner Road (which could necessitate the installation of a gate on Bongart Drive at its intersection with Oval Road or the conversion of Bongart Drive into a cul-de- sac so as to prevent access from Oval Road via Bongart Drive). The installation of the guardhouse, no matter where the ultimate location, shall be subject to a site plan application to the Planning Board filed by WEHI with the consent of the Association, At WEHI’s

Page 44

he installation of the guardhouse, no matter where the ultimate location, shall be subject to a site plan application to the Planning Board filed by WEHI with the consent of the Association, At WEHI’s sole discretion, WEHI may choose to have the guardhouse included on its site plan application for the Proposed Development or in a separate, contemporancously-filed application only concerning the guardhouse, ‘WEHI shall have the Association and the Association’s management company named as additional insureds on WEHI’s Comprehensive General Liability insurance policy and on the CGL policies of any subcontractors; WEBI will indemnify the Association and the Association’s management company for any damage to Association property resulting from construction related activities; 27. The construction of the Proposed Development will have no negative impact on the Association’s utilities, including electricity and water pressure;