Supporting Documentation · Oct 15, 2026
13 Porter Site plan Updated Sept 26
acbd98ca3c8814fec5159a9d28edb589d02b417bdc57f6c1430b84c58c64897bIndexed text · page 5
Show all pagesUNPUBLISHED WORK OF THE JOIST W/ MINOR OPENING OR ROOM. COORDINATE WITH HVAC CONTRACTOR. ARCHITECT. THE REPRODUCTION CRACK (V.I.F.) OF THIS DRAWING FOR THE
7. INSTALL BLANKET INSULATION IN WALL CAVITY AROUND ALL. PURPOSE OF COPYING THIS WORK OR REVISING SAID DRAWING SHALL MECH. CONTRACTOR TO LEVEL BE CONSIDERED A VIOLATION OF EXIST. CONC. SLAB W/
BOTH THE PROFESSIONAL CODE OF ETHICS AND A THEFT OF COMPANY SELF-LEVELING UNDERLAYMENT ASSETS, BOTH OF WHICH SHALL BE FINISH W/ EPOXY SHIELD
PROSECUTED TO THE FULLEST EXTENT OF THE LAW AND CURRENT ENTIRE GARAGE FLOOR 2x10 FLOOR JOIST @ 16" O.C. STATUTES. MATCH FLOOR FRAMING HGT.
MATCH FLOOR FRAMING HGT. Consultant: Aaron Gonzales, PhD 5 OF EXISTING RESIDENCE 28'-11" NO CHANGES IN THE HATCHED AREA
FIRST FLOOR 0" FINISH BASEMENT WATERPROOFING VAPOR BARRIER, 4'
VAPOR BARRIER, 4' ELECTRIC 1/2" GYP. BD. CEILING 10 MIL. MIN. BASEBOARD FULL HEIGHT HEATER. EXACT NEW BASEMENT LOCATIONS TO
WALL BE VERIFIED W/ OWNER & ELECTRICIAN 7'-5" 7'-4" GARAGE 12" CMU FOUNDATION WALL
12" CMU FOUNDATION WALL SMOOTH PARGE FINISH. REV. # SITS ON A 2'x1' CONT. CONC.
4'-6" FOOTING (MIN. 3500PSI) W/ (2) #4 REBAR HORIZ. 8'-8" BELOW GRADE.
File revisions (1)
- Sep 29, 2026
acbd98ca3c886,413,934 bytes