Supporting Documentation · Nov 4, 2026
Fire Station 3 Sheet A 01
2df768d52f092cdc7ddc53f614d5c488b6314508daa4f2243f620558cae31776Indexed text
EXISTING CONCRETE PAD BASEMENT ‘DOOR PLACE wi NEW "on KITCHEN DORM/ WEIGHT ROOM |ST. HOSE ‘STORAGE DAY ROOM Es ® PROJECT NORTH REPLACE w/ NEW"A" ONSTRUCTION WORK THE WORK The Work includes two broad scopes of Work, the BASE BID WORK and the ALTERNATE WORK A. BASE BID WORK - Fire House No.3 ‘The Base Bid Work is Work at Fire House No. 3 ONLY. Three (3) Scopes of Work define the Base Bid Work and include the Exterior Scope of Work, the Interior Scope of Work and the Window Replacement Scope of work. 1, Exterior Scope of Work: Repair damaged brick facade & re-point joints Clean exterior walls and apply water resistant treatment Fix & repair exterior elevation cracks, Tuck pointing as noted & reseal all masonry building fagade surfaces Biesices Existing Front Entrance landing with Barrier free code complaint ADA landing & P. Q Provide Exterior site Lighting 2, Interior Scope of Work: Provide new interior flooring/ wall base Repait/ replace ceiling tiles Replace all interior doors and provide new code compliant hardware Replace existing showers with ADA shower units Replace all plumbing fixtures in toilet rooms with low-flow fixtures Provide split air conditioning system throughout all areas Except Apparatus Bay and Basement Upgrade existing fire alarm system Clean, fix & paint all walls (Interior). 3. Window Replacement Scope of Work: ‘Replace all windows with double pane, low-e glass and insulated frames Replace exterior man doors, frames and hardware “Clean, repair & repaint all lintels & sills, Remove all through window/wall mechanical units and all associated support/mounting Alternate No. 4A Scope of Work — Fire House No. 3 — Garage Exhaust Fans ‘The work includes the installation of a new garage exhaust fan system __ Install (1) new Make Up Air Unit over the lower roof Install new horizontal and vertical ductwork with dampers from "roof mounted MUA to floor in the garage area Install (1) new Exhaust Fan over the garage roof Install new Structural support work associated with the new equipment Install new Electrical work associated with the new equipment ___ Extend gas line to new MUA with new gas line roof supports Cut, patch and repair existing brick wall Install new roof screening panel for MUA Relocate existing furnishings as required to install new ductwork Alternate No. 6 Scope of Work — Fire House No. 3 —
t, patch and repair existing brick wall Install new roof screening panel for MUA Relocate existing furnishings as required to install new ductwork Alternate No. 6 Scope of Work — Fire House No. 3 — Install Clothes Dryer Cabinet The work includes the removal of the existing gas fired clothes dryer and gas line as shown on the plan and installation of the new electric clothes dryer Remove the existing gas fired clothes dryer Install (1) new electric clothes dryer as specified Install new electric dryer vent in existing gas dryer vent opening — patch opening Install new electrical wiring and circuit breaker as required for the new dryer O =] = HERBST MUSCIANO LLC GARY Ml ), RA, PP 1 [oxnonns iSSuED FoR BIOPERT sunwssons "CUENTTPRORECT ‘TOWNSHIP OF WEST ORANGE DEPARTMENT OF ENGINEERING FIRE STATION IMPROVEMENTS & RENOVATIONS FIRE STATION 3 93 RIOGEWAY AVENUE WEST ORANGE, NJ 07052 CONSTRUCTION FLOOR PLANS AND SCOPE OF WORK GM ‘AS NOTED HEA "2026 GM 8157-FS3 ae AO
File revisions (1)
- Oct 30, 2026
2df768d52f09747,875 bytes