1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 15 extend from Eagle Rock now into the site on either side? MR. COTE: It doesn’t extend into the site, it just provides sidewalk access along Eagle Rock Avenue. MR. PANNULLO: Okay. MR. COTE: As a request by the board. MR. PANNULLO: Okay. So is that -- so the -- the -- the elevation goes up along Eagle Rock up to thoe parking lot, so let’s call it a hill. Does the sidewalk increase the grade or the degree of the slope or the angle of the -- MR. COTE: No. No. MR. PANNULLO: No? MR. COTE: The sidewalk was integrated into the clear area that was graded for the roadway widening. So, adjacent to the curb line, there is an approximate 10-foot wide clear area that’s proposed along that length, and that allows for the imposition of a sidewalk within that geometry. So just think of it like a flat section next to the side of the road and the sidewalk will be installed in that portion. MR. PANNULLO: Okay. MR. COTE: No -- no change -- no change to1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 16 the grades on the site, if that’s what you’re asking. MR. PANNULLO: Well, I wasn’t -- I didn’t get there yet, but I wasn’t sure, is this also -- I’m not sure what are you cover. Are you limited to or are you only talking about stormwater management or are you talking about other -- other engineering issues related to the project? MR. COTE: Just site civil engineering related, which is drainage, site layout design, not the traffic elements of the project. MR. PANNULLO: Right. Right. Okay. My time is up. I’ll have more questions if -- as permitted. CHAIRMAN BAGOFF: Thank you -- thank you very much, Sir. I want to -- Mr. Cote, I’m going to take a -- an administrative interlude. (Chairman briefly addresses another application.) CHAIRMAN BAGOFF: Sorry. Mr. Cote, we’re back to you. Do any other members of the public have any questions for Mr. Cote on his testimony? Please raise your hand and be identified. ZOOM OPERATOR: Deb’s iPhone, please state your name and address for the record. Deb’s iPhone? There you are. DR. FRUCHTMAN-BUTENSKY: Who’d you call? ZOOM OPERATOR: You. You can state your name1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 17 and address for the record. DR. FRUCHTMAN-BUTENSKY: So, the name is
M OPERATOR: You. You can state your name1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 17 and address for the record. DR. FRUCHTMAN-BUTENSKY: So, the name is Dr. Deborah Butensky, 11 Rappleye Court. So, my question is for Mr. Cote to please repeat the grade of the new driveway as proposed. MR. COTE: So the current driveway has an eight and a half percent grade along the main line of it, tying back into a grade of three -- four percent -- excuse me, five percent at the intersection with Eagle Rock and then in a similar fashion, at three percent at the location of the top parking lot. And basically, that ties the two together based on the upper parking lot grade traversing down through that driveway and then coming into the intersection of Oval. DR. FRUCHTMAN-BUTENSKY: And what is the speed limit of that driveway, to be safe? MR. COTE: It’s an intern -- it’s an internal driveway. There’s not a posted speed limit, but generally, a 15 mile per hour would be a typical type speed limit for something like that. DR. FRUCHTMAN-BUTENSKY: So, question two. You are now making a T intersection, whi ch is Oval Road intersecting Eagle Rock Avenue, into a four-way intersection. MR. COTE: Correct. If that’s a question.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 18 DR. FRUCHTMAN-BUTENSKY: And the question is how does that impact the safety of the res -- of the drivers coming out of Oval Road going east and west from The Grande and (indiscernible). MR. COTE: So our -- our traffic engineer has already testified to those added safety elements of the actual intersection under the traffic testimony. DR. FRUCHTMAN-BUTENSKY: Can you repeat them? MR. COTE: I’m not -- MS. McGOVERN: He’s not -- MR. COTE: That’s not -- that was his testimony, not mine. DR. FRUCHTMAN-BUTENSKY: And what is the indication to actually move the driveway in the first place? MR. COTE: To alleviate the poorly-aligned driveway that’s out there today. So if you’re aware of the driveway that currently comes in on an acute angle, a sharp angle, to Eagle Rock, if you were to be looking to make a left turn out of that, you basically are turning more than 90 degrees with your neck to be able to look over your shoulder to see oncoming cars. This will allow the driveway to be perpendicular, which will allow for better sight as well
are turning more than 90 degrees with your neck to be able to look over your shoulder to see oncoming cars. This will allow the driveway to be perpendicular, which will allow for better sight as well as the controlled intersection of it being signalized. So we’re
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 19 eliminating the poorly-aligned driveway that’s out there today. DR. FRUCHTMAN-BUTENSKY: And how does the new driveway impact the sight line of people coming around from Laurel Avenue onto Eagle Rock Avenue going eastbound? MR. COTE: It doesn’t impact them in any way. DR. FRUCHTMAN-BUTENSKY: Well, explain how you feel that it doesn’t. MR. COTE: It’s a widened road allowing additional a left turn lane that goes into Oval and the sight triangle for that, because we’re clearing that area to give the 10-foot clear area will actually be improved visibility to the cars at that -- and again, it’s a signalized intersection, so it’s controlled movement. So it’s an improved scenario. DR. FRUCHTMAN-BUTENSKY: You’re saying it’s directly pa -- it’s contiguous with Oval. So how is there a left-hand lane going into Oval? MR. COTE: On Eagle Rock Avenue, there’s a left-hand lane provided for vehicles coming off of Laurel onto Eagle Rock Avenue heading towards Oval. That left turn lane allows those cars to move into a protected lane outside of the through lanes. So those cars aren’t having any impact on the roadway as far as1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 20 the through movements, which you asked about people seeing cars coming in from the left, coming up to the intersection, through Oval, would they be impacted and the answer -- my answer is no, they wouldn’t be impacted. It’ll be improved, in fact, for that matter. DR. FRUCHTMAN-BUTENSKY: and the - the traffic that is going to ensue, although you’re not the traffic engineer, is -- in your mind, you’re going into three lanes on Eagle Rock Avenue now? MR. COTE: Yeah. The traffic engineer explained the value of those particular widenings. You asked me about the sight triangle, basically, more or less the -- what is the visibility, and that’s the answer I gave. The traffic side of it was already testified by the traffic engineer, indicating the improvements. As an improvement. DR. FRUCHTMAN-BUTENSKY: It’s still not clear to me. So walk me through this. I’m making -- I’m coming on Laurel and I’m making a right turn and I want to go left into Oval Road into The Grande. Your cars are coming -- let’s say they’re going westbound on Eagle Rock Avenue. How is this not making things
n Laurel and I’m making a right turn and I want to go left into Oval Road into The Grande. Your cars are coming -- let’s say they’re going westbound on Eagle Rock Avenue. How is this not making things more problematic? And has it? MR. COTE: There is a traffic signal that stops each movement for the respective movements that1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 21 -- for the ones that are being -- actively going through the intersection. So you’re coming up to a stop light when vehicles are exiting the Crestmont site. And then ultimately, the -- the cars making a left into Oval have a protected left turn. And again, this is the traffic engineer’s testimony. You’re asking me as a civil and I can talk about just the fact that this is the geometry that’s there. But he’s already testified to all the maneuvers -- DR. FRUCHTMAN-BUTENSKY: Well, you’re -- you’re -- MR. COTE: -- and -- and to the improements. I’m - I’m just asking you to restrict your questions to my site civil engineering testimony -- DR. FRUCHTMAN-BUTENSKY: Well, you’re -- you’re making the -- MR. COTE: -- so that I can answer your questions. DR. FRUCHTMAN-BUTENSKY: You’re making the assessment that the current driveway, which has never been stated to be a problem for 30 years that The Grande has been developed, has all of a sudden become a problem. And it seems to me that your four-way intersection has the propensity to become as much of a1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 22 problem if not more -- MR. COTE: You’re -- you’re -- I apologize. DR. FRUCHTMAN-BUTENSKY: -- than what you purport -- MR. SCHKOLNICK: Chair -- Chairman? MR. COTE: I’m asking a question. Could you ask a question to me, please. MR. SCHKOLNICK: Chairman, this is exactly why I requested -- the questioner is giving testimony, and this is exactly why I asked that they be required to come onto the camera, because she’s giving testimony and her opinion, not asking questions. DR. FRUCHTMAN-BUTENSKY: Well, the question is -- MR. SCHKOLNICK: I just point that out for the record. DR. FRUCHTMAN-BUTENSKY: -- what proof -- excuse me, Mr. Schkolnick. You’re using my time. What proof do you have that your plans are not problematic and going to create more traffic accidents? MR. COTE: We’ve already provided those proofs through the traffic
hkolnick. You’re using my time. What proof do you have that your plans are not problematic and going to create more traffic accidents? MR. COTE: We’ve already provided those proofs through the traffic engineer’s testimony, identifying the improvements that are proposed by this project. It’s already been stated to, it’s already in the documents that have been provided to the Township
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 23 and that’s been reviewed by the Township. DR. FRUCHTMAN-BUTENSKY: But -- but -- MR. COTE: All that has been stated previously in other testimony. You’re asking -- DR. FRUCHTMAN-BUTENSKY: Well, the point is that you’re -- MR. COTE: -- question that’s -- a question’s that’s already -- you’re asking a question that’s already been answered, and you’re asking a question of the civil engineer -- DR. FRUCHTMAN-BUTENSKY: However, you’re -- well, because -- MR. COTE: I’m not trying to be -- I’m not trying to be oppositional here. I just -- understand that my role, my responsibility to this board is to answer questions to my testimony. And if you’re asking questions about someone else’s testimony -- DR. FRUCHTMAN-BUTENSKY: Well -- MR. COTE: Because that’s dipping -- that’s outside of my testimony. I just don’t want to be out of turn here, taking their time answering your question on something that is not relevant to my testimony. And I apologize -- DR. FRUCHTMAN-BUTENSKY: Well, it seems to me an eight percent grade --1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 24 MR. COTE: Sure. DR. FRUCHTMAN-BUTENSKY: -- is also a lot steeper -- MR. COTE: That’s my testimony. DR. FRUCHTMAN-BUTENSKY: That is your testimony -- is a lot steeper -- MR. COTE: Yes. DR. FRUCHTMAN-BUTENSKY: -- and potentially problematic in the winter -- CHAIRMAN BAGOFF: Ma’am. Ma’am. Ma’am. You can ask a question. We don’t want you testifying, please. DR. FRUCHTMAN-BUTENSKY: Okay. CHAIRMAN BAGOFF: Just ask a question. DR. FRUCHTMAN-BUTENSKY: So, can you explain how that eight percent grade in the winter is not dangerous? MR. COTE: An eight percent grade is acceptable in winter conditions. It’s -- this whole area -- actually, by standards throughout the state, I -- this could have gone up to 12 percent depending on the type of standard. So it’s -- it is an acceptable grade for the purpose at hand. It needs to be maintained like any grade. There are other areas on the site that are existing conditions steeper than that1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 25 that are already maintained and have been operating for years without issue. So I don’t want to -- you know, that -- that operations authority’s spoken to the
21 22 23 24 25 Cote - Public Questions 25 that are already maintained and have been operating for years without issue. So I don’t want to -- you know, that -- that operations authority’s spoken to the fact that this is an improvement for their purposes of the way their customers will leave the site, so I’m not going to go into their testimony other than restate that that’s already been covered by their testimony. DR. FRUCHTMAN-BUTENSKY: Okay. Thank you. CHAIRMAN BAGOFF: Thank you. Do any other members of the public have any questions for Mr. Cote on his testimony? And again, please ask a question about his testimony. Please raise your hand and be identified. ZOOM OPERATOR: Okay. Paul Tractenberg, please state your name and address for the record. Paul? MS. McGOVERN: He’s muted. ZOOM OPERATOR: Yup. I just -- MS. McGOVERN: You have to un -- there he goes. MR. TRACTENBERG: Here we go. Can you hear me now? ZOOM OPERATOR: Yes. MS. McGOVERN: Yes. CHAIRMAN BAGOFF: Go right ahead, Sir.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 26 MR. TRACTENBERG: Yeah. Paul -- Paul Tractenberg, 96 Sullivan Drive, West Orange. Mr. Cote, I -- I’m looking at a March 17, 2026 letter from Mr. Schkolnick to the -- the planning board secretary and the planning board. Are -- is that a letter you’re familiar with? MR. COTE: I don’t have it in front of me, so I can’t necessarily repeat what necessarily is on there. MR. TRACTENBERG: Well, I can specify in my questions. I’ll ask back to the letter. I’m assuming these are part of the civil engineering aspect of the application. I have in mine actually six items for which the applicant is seeking relief from the planning board from the requirements of the township ordinance that governs the R-2 zone. Let -- let me just tick them off and ask you for your opinion about each of them. The first is a maximum retaining wall height. It indicates four feet is permitted, 21 and a half feet is proposed, which I take to be more than five times what the ordinance provides. Are you familiar with the retaining walls and -- MR. COTE: Yes, I am. MR. TRACTENBERG: -- their request for that
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 27 relief? MR. COTE: Yes, I am. MR. TRACTENBERG: And -- and you justify a five-and-a-half-fold increase in the -- the zoned maximum exactly how, please? MR. COTE: I did in my testimony. Relative to the location where the wall is proposed is coincident with the stormwater management that’s required to basically attenuate the flows from the site. So that wall is coincident with the basin and as a function of that, it -- and maintaining the upper parking lot elevations at a reasonable grade results in that 21-plus-foot wall. So the justiciation was maintaining an adequate infrastructure system for the stormwater while maintaining adequate grades in the parking lot for the proposed design. MR. TRACTENBERG: But I am correct that the -- the ordinance specifies a four-foot maximum and the application proposes more than five times that? MR. COTE: Right. But that order of magnitude is just a function of the condition that we’re -- we have here to provide both infrastructure measures as well as the parking lot grades as necessary. That’s the justification.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 28 MR. TRACTENBERG: Okay. Second -- second ordinance requirement is minimum setback of proposed improvements to top of a steep slope that are 10 to 30 percent grade. According to the letter, 50 feet is required. Ten feet is proposed. Does that strike you as creating any kind of a safety issue about the -- the degree of impingement on a steep slope? MR. COTE: No. In particular, the reason why we did this scenario was to minimize the amount of disturbance on the site. We would have had to have taken down additional trees to have created those kind of setbacks, and from a big-picture point of view, one of the focuses was we are -- we have to plant and re- plant trees for all disturbed and we were told to minimize our impacts to the trees. So that’s the -- MR. TRACTENBERG: Well, that an -- MR. COTE: -- justification -- MR. TRACTENBERG: That -- MR. COTE: For the -- for the -- MR. TRACTENBERG: That anticipates -- MR. COTE: -- position. MR. TRACTENBERG: -- the third issues that’s raised in Mr. Schkolnick’s letter, that the applicant is requesting a site plan waiver as to removal of trees on slopes of 10 percent or greater. And the
n. MR. TRACTENBERG: -- the third issues that’s raised in Mr. Schkolnick’s letter, that the applicant is requesting a site plan waiver as to removal of trees on slopes of 10 percent or greater. And the indication1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 29 is 191 trees are proposed to be removed that are located in slopes that are 10 percent or greater. Is that -- MR. COTE: I’m sorry. Was that a -- was that a question? MR. TRACTENBERG: -- accurate? MR. COTE: Sorry. That -- that’s a -- MR. TRACTENBERG: Yes. MR. COTE: That’s -- that’s a correct perspective -- MR. TRACTENBERG: I’m -- I’m asking whether that’s -- MR. COTE: Tha’ts -- that is correct -- MR. TRACTENBERG: -- that’s consistent with the plan. MR. COTE: That is correct. Yes. MR. TRACTENBERG: And -- and you think that -- and that that degree of deviation from the ordinance requirement is justified by this plan? MR. COTE: Yes. It’s actually a result of the exact -- of the condition of positioning this, tying everything back in, providing the drainger structures necessary to help mitigate the stormwater, in particular, to make improvements on Eagle Rock Avenue to improve the drainage system out there, all of1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cote - Public Questions 30 these areas of the site are in proximity to Eagle Rock and in that 10 percent zone. MR. TRACTENBERG: Okay. Just one more, and then I want -- I have a final question. There’s a requirement of a -- in the ordinance of a minimum setback of proposed improvements to the top of steep slopes greater than 30 percent. The indication is 100 percent -- 100 feet is required, 10 feet is proposed. So you’re proposing that this will impinge within 10 feet of a slope of greater than 30 percent, and that, too, is justified by the plan, according to you. Is that correct? MR. COTE: Yes. That’s correct. Yes. Under the same exact reasoning I gave a moment ago. MR. TRACTENBERG: Okay. So -- so this is all as I get it, in aid of adding 36 parking spaces to a parking lot which is hundreds of parking spaces short of what the ordinance requires and to create a new intersection. Is that correct? MR. COTE: I’m not sure if I understood that as a question. You made a statement, but I’m not sure -- MR. TRACTENBERG: Well, my question is whether I have correctly indicated that in order to add 36