® Change Order Document G701° - 2017 PROJECT: (Name and address) West Orange Public Library 10 Rooney Circle West Orange, NJ 07052 OWNER: (Name and address) Township of West Orange 66 Main Street West Orange, NJ 07052 CONTRACT INFORMATION: Contract For: General Construction Date: ARCHITECT: (Name and address) Areari + Tovino Architects, P,C. One Katherine Street Little Ferry, NJ 07643 CHANGE ORDER INFORMATION: Change Order Number: 001 Date: August 25, 2022 CONTRACTOR: (Name and address) H&S Construction aad Mechanical, Inc, 721 Bayway Avenue Elizabeth, NJ 07202 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or attributable to executed Construction Change Directives.) Steel Testing (COR #2). Add $6,946.54 The original Contract Sum was The net change by previously authorized Change Orders ‘The Contract Sum prior to this Change Order was The Contract Sum will be increased by this Change Order in the amount of ‘The new Contract Sum including this Change Order will be The Contract Time will be uncbanged by zero (0) days, ‘The new date of Substantial Comp! ion will be reference specific exhibits, Also include agreed upon adjustments 5.075,000.00 0.00 3,075.000.00 6,946.54 5,081,945.54 wunwn that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the jitractor, in which case a Change Order is executed to supersede the Construction Change Directive, H&S Construction and Mechanical, Inc, CONTRACTOR (Firm name) Township of West Orange OWNER (Firm name) SIGNATURE SIGNATURE SIGNATURE Anthony Tovino, President Daniel Hernandez, President PRINTED NAME AND TITLE PRINTED NAME AND TITLE. anthony “ovuno, President a PRINTED NAME AND TITLE S/25-/302>. DATE DATE DATE ANA Document G701” - 2017. Copyright © 1979, 1987, 2000 , 2001 and 2017 by The American Inclitule of Architects. Al fights reserved, The “American Institute of Architects,” “AIA.” the AIA Lago. and “AIA Contract Cocumenis” are registered trademarks and may nol be used alt aut permission, This document Uae ipcuced by Ala software at 16:06:42 BT on 08/26/2022 under Order No.2114292317 which expires on 02/22/2025, 1s rot for medio reer eto one-time ee er and may only be used in accordance withthe AIA Contract Documents? Terms of Service, To repart copyright vclalon eae

Page 1

No.2114292317 which expires on 02/22/2025, 1s rot for medio reer eto one-time ee er and may only be used in accordance withthe AIA Contract Documents? Terms of Service, To repart copyright vclalon eae copyright@aia.org, User Notes: (3B9ADA49)

Page 2

Construction & Mechanical, Inc. EB, Construction & Mechanical Inc. Sniractors - Sprinkler Plumbing “Heating Design CHANGE ORDER REQUEST Project: West Orange Public Library To Contractor: H&S Construction & Mechanical Inc, 721. Bayway Ave Elizabeth NJ 07202 ‘The Contract is changed as follows: Owner: Township of West Orange Construction Mngr: Architect: Arcari & lovino Contractor: H&S Construction Field: Con #: Contract For: Completion Contract Contract Date: Costs associated with cutting steel samples removing fire proofing and patching fireproofing tem] Description Company Totals 1 Cutting steel samples(see attached proposal) High Quality doors & Welding $ 3,000.00 2 3 4 ‘Sub-Contractor Subtotal $ 3,000.00 HRS -Overhesd & Profit OF Sub Cost § 150.00 Sub Contractors Total_$ 3,150.00 ‘een Description Company Totals 5 [Serpe off fire proofing and prep for steel cutting ‘igs $ bine lBhrs x $89.60 6 Patch fire proofing 16hrs X 89.60 Has $ 1,433.60 7 |Materials Hes 3 350.00 8 |Tools, truck and transportation Has $ 250.00 9 |PM time 2.Shrs @ $150 per hr Has $ 375.00 10 rte Contractor Subtotal $ 3,125.40 H &5-Overhead & Profit 15% of Contractor Cost_§ Contractors Total § 3,594.21 SubTotal _$ 6,744.21 H&S Bond Cost $ 202.33 Total _$ 6,946.54 The contract time will be increased by: 2day

File revisions (1)