Supporting Documentation · Nov 22, 2022
289-22 Attachment.pdf
a5daf43b70e4097143b7b0e139bb7ead68f8d989060a3a8128565f603a8b2e79Indexed text
— ® Document G701 - 2017 Change Order PROJECT: (Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: West Orange Public Library Contract For: General Construction Change Order Number: 006 10 Rooney Circle Date: Date: October 13, 2022 West Orange, NJ 07052 OWNER: (Name and address) ARCHITECT: (Name and address) CONTRACTOR: (Name and address) Township of West Orange Arcari + Tovino Acchitects, P.C. H&S Construction and Mechanical, Inc. 66 Main Street One Katherine Street 721 Bayway Avenue West Orange, NJ 07052 Little Ferry, NJ_07643 Elizabeth, NJ 07202 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and. if applicable, attach or reference specific exhibits, Also include agreed ypon adjustments attributable to executed Construction Change Directives.) Metal panel infills at exterior louvers (COR #3R). Add $13,933.89 ‘The original Contract Sum was The net change by previously authorized Change Orders ‘The Contract Sum prior to this Change Order was The Contract Sum wil] be increased by this Change Order in the amount of The new Contract Sum including this Change Order will be 5,075,000.00 63,372.20 5,138,372.20 13,933.89 5,152,306.09 wanes The Contract Time will be unchanged by Zero (0) days. The new date of Substantial Completion will be NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NO; ID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. reari + Ipvino Architects, P.C. H&S Construction and Mechanical, Inc. Township of West Orange RCHITEGT (Firm name) CONTRACTOR (Finn name) OWNER (Firm name) SIGNATURE SIGNATURE SIGNATURE Anthony lovino, President Daniel Hernandez. President PRINTED NAME AND TITLE PRINTED NAME AND TITLE PRINTED NAME AND TITLE Jo fiz pa ree DATE DATE DATE AIA Document G701™ - 2017. Copyright © 1979, 1987, 2000 , 2001 and 2017 by The American Institute of Architects. All rights reserved. The Amencan Institute of Architects,” “AIA.” the AIA Lago, and “AIA Contract Documents’ are registered trademarks and may no! be used without parmission This document was produced by AIA
hts reserved. The Amencan Institute of Architects,” “AIA.” the AIA Lago, and “AIA Contract Documents’ are registered trademarks and may no! be used without parmission This document was produced by AIA software at 09:31:23 ET on 10/13/2022 under Order No.21 14292317 which expires on 02/22/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Dacuments® Terms of Service. To report copyright violations, e-mail copyright@ala.ora. User Notes: (3B9ADA3E) 1
Construction & Mechanical, Inc ‘General Contractors - Sprinkler ~ Plumbing Heating - Design CHANGE ORDER REQUEST Own: Construction Mngr: ‘ownship of West Orange Architect: Arcari & lovino Contractor: H&S Construction Project: West Orange Public Library Field: Cor # To Contractor: Initiation date: H&S Construction & Mechanical Inc. ‘ Project No: 22-044 721 Bayway Ave Contract For: Completion Contract Elizabeth NJ 07202 Contract Date: ‘The Contract is changed as follows: Item] Description Company Totals 1 | Install panel infills. (See proposal attached) Rusco Window Co. Ine. $ 12,391.00 2 3 4 Sub-Contractor Subtotal § 12,391.00 HAS - Overhead & Profit OF Sub Cost 619.55 Sub Contractors Total _§ 13,010.55 item Description Company Totals 5 |pMtime 3 hrs Has 8 480.00 6 Has 7 Has 8 Has 9 Has 20 n Contractor Subtotal $ 450.00 H&S Overhead & Profit 15% of Contractor Cost _$ 67.50 Contractors Total $ 517.50 Sub Total § 13,528.05 H&S Bond cost _$ 405.84 Total $ 13,933.89 The contract time will be increased by: 3 days
Rusco Window Co. Inc. P.O. Box 874 Bound Brook, NJ 08805 TELEPHONE: (908) 610-8879 Garyrusso1954@yahoo.com Aluninun & steel windows. Monumental & grid curtain wall. Aluninun extruded walkway covers Architectural acrylic aggregate panels. Storefront. Entrances. Glass. Glazing REVISED DATE: October 4, 2022 TO: H & S Construction & Mechanical Inc. 721 Bayway Ave Elizabeth, NJ 07207 RE: West Orange Public Library 10 Rooney Circle, West Orange, NJ 07052 PCO #1 — Replacement of existing 1” THK Insulated Panels. ATTN: Pat As requested, please see the below pricing to replace (15) 45 2 x 16” existing spandrel glass panels with 1” THK insulated panels with aluminum skins EXT & INT. Is as follows: Material $ 5,984.00 Labor — 2 men @ $110 Per hr $ 5,280.00 Per day @ 3 days TOTAL $11,264.00 Mark up 10% $ 1,127.00 TOTAL $12,391.00 Thank You, Gary Russo