Supporting Documentation · Nov 22, 2022
293-22 Exhibit A.pdf
c2847bad2f18f74ad97b7b6a3518ad5e59b57c96356056f9099764d4c8711163Indexed text
HOURS PRIOR TO ANY SOIL DISTURBING ACTIVITIES. FAX - (973) 364-0784 OR EMAIL - INFORMATION@HEPSCD.ORG 9. THE APPLICANT MUST OBTAIN A DISTRICT ISSUED REPORT-OF-COMPLIANCE PRIOR TO APPLYING FOR THE
CERTIFICATE OF OCCUPANCY OR TEMPORARY CERTIFICATE OF OCCUPANCY FROM THE RESPECTIVE MUNICIPALITY, NJ - DCA OR ANY OTHER CONTROLLING AGENCY. CONTACT THE DISTRICT AT 973-364-0786 TO REQUEST A FINAL INSPECTION, GIVING ADVANCED NOTICE UPON COMPLETION OF THE RESTABILIZATION MEASURES. A
MEASURES. A PERFORMANCE DEPOSIT MAY BE POSTED WITH THE DISTRICT WHEN WINTER WEATHER OR SNOW COVER PROHIBITS THE PROPER APPLICATION OF SEED, MULCH, FERTILIZER OR HYDRO-SEED. 10. PAVED ROADWAYS MUST BE KEPT CLEAN AT ALL TIMES. DO NOT UTILIZE A FIRE OR GARDEN HOSE TO CLEAN ROADS UNLESS THE RUNOFF IS
CLEAN ROADS UNLESS THE RUNOFF IS DIRECTED TO A PROPERLY DESIGNED AND FUNCTIONING SEDIMENT BASIN. WATER PUMPED OUT OF THE EXCAVATED AREAS CONTAINS SEDIMENTS THAT MUST BE REMOVED PRIOR TO DISCHARGING TO RECEIVING BODIES OF WATER USING REMOVABLE PUMPING STATIONS, SUMP DRAW STRING RUNNING SILT FENCE FABRIC, SECURE TO PITS, PORTABLE SEDIMENTATION TANKS AND/OR SILT
DRAW STRING RUNNING SILT FENCE FABRIC, SECURE TO PITS, PORTABLE SEDIMENTATION TANKS AND/OR SILT CONTROL BAGS. FENCE POSTS THROUGH FABRIC ALONG POSTS WITH METAL FASTERNERS THE TOP OF FENCE AND REINFORCEMENT BETWEEN 11. ALL SURFACES HAVING LAWN OR LANDSCAPING AS FINAL COVER ARE TO BE PROVIDED TOPSOIL PRIOR TO (MAX. 8'-0" O.C.) RE-SEEDING, SODDING OR PLANTING. A DEPTH OF 5 INCHES (UNSETTLED) IS RECOMMENDED.
G, SODDING OR PLANTING. A DEPTH OF 5 INCHES (UNSETTLED) IS RECOMMENDED. FASTENER AND FABRIC SILT FENCE FABRIC 12. ALL PLAN REVISIONS MUST BE SUBMITTED TO THE DISTRICT FOR PROPER REVIEW AND APPROVAL.
13. A CRUSHED STONE WHEEL CLEANING TRACKING-PAD IS TO BE INSTALLED AT ALL SITE EXITS USING 2 2'-0" MIN. SILT ACCUMULATION ANGULAR STONE (ASTM 2 OR 3) TO A MINIMUM LENGTH OF 50 FEET AND MINIMUM DEPTH OF 2'-0" MIN.
2'-0" MIN. GRADE 14. STEEP SLOPES INCURRING DISTURBANCE MAY REQUIRE ADDITIONAL STABILIZATION MEASURES. THESE MEASURES SHALL BE DESIGNED BY THE APPLICANT'S ENGINEER AND BE APPROVED BY THE SOIL
CONSERVATION DISTRICT. 2'-0" MIN. 15. THE HUDSON-ESSEX-PASSAIC SOIL CONSERVATION DISTRICT SHALL BE NOTIFIED, IN WRITING, FOR THE
SALE OF ANY PORTION OF THE PROJECT OR FOR THE SALE OF INDIVIDUAL LOTS. NEW OWNERS' FENCE POST INFORMATION SHALL BE PROVIDED. ADDITIONAL MEASURES DEEMED NECESSARY BY DISTRICT OFFICIALS 6" MIN. EMBEDMENT OF SHALL BE IMPLEMENTED AS CONDITIONS
File revisions (1)
- Sep 29, 2026
c2847bad2f187,047,338 bytes