Supporting Documentation · Jan 10, 2023
16-23 Attachment - Change Order 11.pdf
bd1c2de09876748cdc7a259dffcdfa27f9719b64a5b015217b5a3f6a5f5c552fIndexed text
WATA Document G701°- 2017 Change Order PROJECT: (Name and address) West Orange Public Library 10 Rooney Circle West Orange, NJ 07052 OWNER: (Name and address) Township of West Orange 66 Main Street West Orange, NJ 07052 CONTRACT INFORMATION: Contract For: General Construction Date: ARCHITECT: (Name and address) Arcari + Iovino Architects, P.C. One Katherine Street Little Ferry, NJ.07643 CHANGE ORDER INFORMATION: Change Order Number: 011 Date: January 4, 2023 CONTRACTOR: (Name and address) H&S Construction and Mechanical, Inc. 721 Bayway Avenue Elizabeth, NJ.07202 THE CONTRACT IS CHANGED AS FOLLOWS: (nsert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) Breaker size change (COR #20). Add $2,388.09 The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be increased by this Change Order in the amount of ‘The new Contract Sum including this Change Order will be The Contract Time will be unchanged by Zero (0) days. __5,075,000.00 105,405.29 $ $ $ _5.180,405.29 $ $ The new date of Substantial Completion will be NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Own YOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. id Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. Arcari + logino Architects, P.C. H&S Construction and Mechanical, Inc. Township of West Orange irn® name) CONTRACTOR (Firm name) OWNER (Firm name) SIGNATURE SIGNATURE SIGNATURE Anthony Tovino, President Daniel Hernandez, President PRINTED NAME AND TITLE PRINTED NAME AND TITLE PRINTED NAME AND TITLE V4 from DA’ DATE DATE AIA Document G701™ — 2017. Copyright © 1979, 1987, 2000 , 2001 and 2017 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 12:41:44 ET on 01/04/2023 under Order
“AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 12:41:44 ET on 01/04/2023 under Order No.2114292317 which expires on 02/22/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA3D) 1
S & HConstruction & M echanical, Inc. G e n e ra l C o n tra c to r s · S p rin k le r · P lu m b in g · H e a tin g · D e s ig n CHANGE ORDER REQUEST Owner: Township of West Orange Construction Mngr: Date: 12/22/2022 Architect: Arcari & Iovino Contractor: H&S Construction Project: West Orange Public Library Field: COR #: 20 To Contractor: Initiation date: H&S Construction & Mechanical Inc. Project No: 22-044 721 Bayway Ave Contract For: Completion Contract Elizabeth NJ 07202 Contract Date: The Contract is changed as follows: Costs associated with changes made on electrical drawing in RFI #14 breaker size response Item Description Company Totals 1 Additional electrical work - See attached Lowder $ 2,043.84 2 $ - 3
$ - 3 $ - 4 $ - Sub-Contractor Subtotal $ 2,043.84 H&S - Overhead & Profit Of Sub Cost $ 102.19 Sub Contractors Total $ 2,146.03 Item Description Company Totals 5 PM time 1hr H&S $ 150.00 6 H&S 7 8 9 10 11 Contractor Subtotal $ 150.00 H & S - Overhead & Profit 15% of Contractor Cost $ 22.50 Contractors Total $ 172.50 Sub Total$ 2,318.53 H&S Bond Cost $ 69.56 Total $ 2,388.09
56 Total $ 2,388.09 The contract time will be increased by: 2 days
Lowder Electric and Construction Corp Estimate 250 Hallock Ave. Unit B Middlesex, NJ 08846 US (732) 764-6000 info@lowder.biz ADDRESS SHIP TO H & S Construction West Orange Library 721 Bayway Ave. 10 Rooney Circle Elizabeth, NJ 07202 West Orange, NJ ESTIMATE # DATE 2660 12/21/2022 WORK ORDER # CO / RFI #14 DATE DESCRIPTION QTY RATE AMOUNT AC- 1S upgrade wiring from #10 to #8 wire as per new E-405 4 399.36 1,597.44 AC-1E upgrade wiring from #10 to #8 wire as per new E-405 AC- 1N upgrade wiring from #10 to #8 wire as per new E-405 DOAS-CU upgrade wiring from #10 to #8 wire as per new E-405 AC-1S upgrade circuit breaker from 40a to 50a 3 148.80 446.40 AC-1N upgrade breaker from 25a to 30a AC-1S upgrade breaker from 45a to 50a AC-1E breaker will use AC-1S 40A breaker no change SUBTOTAL 2,043.84 TAX 0.00 TOTAL $2,043.84 Accepted By Accepted Date Lowder Electric & Construction Corp. Lic# 17955