Supporting Documentation · Feb 13, 2024
64-24 Leaf reimbursement Llewellyn Park Table 2024.pdf
a677cdfcfdf27be145ae1d593de2c4b9b9eab417a2f37e8b1bbcea60d261c71eIndexed text
AN EQUAL OPPORTUNITY EMPLOYER www.westorange.org 2023 LEAF COLLECTION AND OBSTRUCTION REMOVAL REIMBURSEMENT TO LLEWELLYN PARK LEAF COLLECTION PRIVATE COMMUNITY ROAD LENGTH L.F. MILES PERCENTAGE OF TOWNSHIP ENHANCEMENT FACTOR AMOUNT TO REIMBURSED LLEWELLYN PARK 47,520 9.0 9.52380% 2.0 $81,928.54 TOTAL TOWNSHIP MILES 94.5 TOWNSHIP LEAF COLLECTION COST FOR 2023 = $430,125.22 NOTES: Amounts to be reimbursed = % of Township Roads x Township Leaf Collection Cost (or obstruction removal cost) x Enhancement TOWNSHIP OF WEST ORANGE 25 LAKESIDE AVENUE, WEST ORANGE, N.J. 07052 DEPARTMENT OF ENGINEERING SUSAN McCARTNEY Tel: (973) 325-4160 Mayor Fax: (973) 669-9588 ZAYIBETH CARBALLO Municipal Engineer Email: Engineering@westorange.org64-24
File revisions (1)
- Sep 29, 2026
a677cdfcfdf2922,492 bytes