Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Mar 26, 2024

99-24 Exhibit to Temporary Extension Agreement.pdf

Preserved file SHA-25600d0dba76ba6d3d1d7a63a33656ba8a40ca72823740f177df05bad83d7b1ada0

Indexed text · page 126

Show all pages
Page 126

In addition In addition to the Proposed to the Proposed Lease Payment to Lease Payment the Township to the Township and and toto improve community improve community relations, relations, the the Reliable Reliable Proposal Proposal isis that that processing processing atat the the Site Site will will be limited to be limited to extraordinary extraordinary events events as described as described above.above. Absent Absent those those events, all material events, all material received received atat the Site will the Site will be removed and be removed and not not more more than 7,500 cubic than 7,500 yards of cubic yards brush, and of brush, not more and not than 5,000 more than

Page 126

of brush, not more and not than 5,000 more than yards of cubic yards 5,000 cubic of leaves will remain leaves will remain on the on the Site Site atat any any time. Those amounts time. Those amounts are are below below thethe permitted permitted capacity capacity for for the Site and the Site and are are consistent consistent with historic permitted with historic permitted levels. Removal of levels. Removal of the the unprocessed material is unprocessed material is possible possible because because other facilities operated other facilities operated by by Reliable Reliable areare available available to to receive receive the West Orange

Page 126

e available available to to receive receive the West Orange the West Orange material. Material material. Material will continue will continue to to be be accepted accepted at at no no charge charge as as provided provided in Technical Information in Technical Information SectionsSections 2.9.1 2.9.1 through through 2.9.4.2.9.4. Additionally, Additionally, processed processed material material willwill continue continue to to be be available available at at no no charge charge asas provided provided in Sections 2.12.1 in Sections 2.12.3. Reliable through 2.12.3. 2.12.1 through Reliable will continue to will continue charge users

Page 126

ue to will continue charge users to charge users of the Site of the not Site not otherwise exempt. otherwise However, regardless exempt However, regardless of who deposited of who deposited the material, it the material, it will will be removed from be removed from Site as the Site the as described herein above. described herein above. Finished, fully processed Finished, fully processed material will be material will returned to be returned to the Site the Site and stored neatly in new bunkers reflected on the Site Improvement Plan included in the Reliable and stored neatly in new bunkers reflected on the Site Improvement Plan included in the Reliable Proposal. ItIt is Proposal. anticipated that is anticipated $60,000 will approximately $60,000 that approximately be allocated

Page 126

approximately $60,000 that approximately be allocated will be allocated for Improvement. Site Improvement. for Site The benefit The benefit of the new of the new proposed method of proposed method of operation operation isis that that the the potential potential for for noise, dust, noise, dust, odor, fire, odor, overcapacity, and fire, overcapacity, likelihood of the likelihood and the of complaints complaints will reduced substantially be reduced will be substantially or even or even eliminated. As eliminated. As aa result, result, Reliable Reliable believes the number believes the number andand frequency frequency of of inspections inspections byby the

Page 126

frequency of of inspections inspections byby the the Enviro1U11ental Compliance Township Environmental Township Compliance Officer can be Officer can be reduced far fewer reduced toto far than provided fewer than provided inin the the Request for Request Proposal. Likewise, for Proposal. with reduced Likewise, with storage of reduced storage unprocessed material, of unprocessed material, the for the need for the need the odor neutralizing odor neutralizing system will be system will reduced. However, be reduced. Reliable will However, Reliable the existing maintain the will maintain system in existing system in the event the conditions favorable that conditions event that the development favorable toto the development of of odor occur.

Page 126

that the development favorable toto the development of of odor occur. odor occur. As been the has been As has case several the case times in several times in the recent past, the recent weather related past, weather Acts of related Acts of God have God have caused an caused an unanticipated excess of unanticipated excess material brought of material brought toto the Site by the Site by the Township that the Township far in is far that is excess in excess of normal of normal historic levels which historic levels which excess the operator excess the operator has has no to control ability to no ability control oror limit. Those events, limit. Those events, and possibly and others, result possibly others, result in increased cost

Page 126

limit. Those events, and possibly and others, result possibly others, result in increased cost in increased the operator cost toto the operator of of the Site, whether the Site, Reliable or whether itit isis Reliable or some other some other operator. Accordingly, material operator. Accordingly, deposited by material deposited the Township by the Township atat the Site because the Site because of such of such event will event be subject will be charge per to aa charge subject to cubic yard per cubic yard forfor each cubic yard each cubic yard ofof brush, brush, logs, stumps, wood logs, stumps, wood chips, and chips, leaves based and leaves upon aa mutually based upon acceptable cap mutually acceptable cap of received in material received of material excess of in excess

Page 126

of material excess of in excess average of average annual levels received historic levels annual historic received from the Township from the Township at at the Site. the Site. The Reliable The Proposal anticipates Reliable Proposal anticipates that operation of that operation the Convenience of the Center will Recycling Center Convenience Recycling will be be unchanged. Reliable will unchanged. Reliable continue toto bear will continue bear the the annual a1U1ual operating operating cost of more cost of more than than $120,000 $120,000 associated with that associated with and when operation and that operation combined with when combined the cost with the of the cost of and the Class BB and

Page 126

cost of and the Class BB and the Class Class CC the Class operations amount to operations amount more than to more than $750,000 $750,000 annually. annually. We hope We hope this this explanation explanation of our Proposal of our Proposal has has been helpful. We been helpful. We understand that the understand that the Proposal may Reliable Proposal Reliable result inin questions. may result Accordingly, we questions. Accordingly, request aa meeting we request meeting as soon as as soon as convenient convenient withwith representatives representatives of of the the Township Township to to answer answer anyany questions, questions, toto provide provide any any additional information that additional information that may may bebe requested,

File revisions (1)