Supporting Documentation · Mar 26, 2024
99-24 Exhibit to Temporary Extension Agreement.pdf
00d0dba76ba6d3d1d7a63a33656ba8a40ca72823740f177df05bad83d7b1ada0Indexed text · page 70
Show all pagesMATERIALS MAY MAY BEBE USED USED IFIF APPROVED
APPROVED BYBY THE THE SOIL
SOIL CONSERVATION
CONSERVATION DISTRICT. DISTRICT. TILLAGE — TO ROUGHEN SURFACE AND BRING CLODS TO THE SURFACE. THIS IS A TEMPORARY EMERGENCY MEASURE WHICH SHOULD
TILLAGE — TO ROUGHEN SURFACE AND BRING CLODS TO THE SURFACE. THIS IS A TEMPORARY EMERGENCY MEASURE WHICH SHOULD the written BE USED BEFORE SOIL BLOWING STARTS. BEGIN PLOWING ON WINDWARD SIDE OF TEH SITE CHISEL-TYPE PLOWS SPACE ABOUT 12 7. 7. ALL EROSION
7. ALL EROSION ALL EROSION CONTROL CONTROL DEVICES
DEVICES SHALL SHALL BE
BE PERIODICALLY PERIODICALLY INSPECTED,
INSPECTED, MAINTAINED MAINTAINED AND AND
AND CORRECTED CORRECTED BY BY THE
File revisions (1)
- Sep 29, 2026
00d0dba76ba67,781,144 bytes