Supporting Documentation · Mar 26, 2024
99-24 Exhibit to Temporary Extension Agreement.pdf
00d0dba76ba6d3d1d7a63a33656ba8a40ca72823740f177df05bad83d7b1ada0Indexed text · page 70
Show all pages3. THIS DRAWING REFLECTS THIS DRAWING CONDITIONS AS REFLECTS CONDITIONS OF THE AS OF DRAWING DATE THE DRAWING OF THE
THE DRAWING OF THE DATE OF THE 2” OR GREATER CLEAN/INSPECT ALL STORMWATER DISCHARGE POINTS, SPRAY—ON ADHESIVES — ON MINERAL SOILS (NOT EFFECTIVE ON MUCK SOILS) KEEP TRAFFIC OFF THESE AREAS 2. 2. ALL SOIL TO
ALL SOIL TO BE EXPOSED OR BE EXPOSED STOCKPILED FOR
OR STOCKPILED PERIOD OF FOR AA PERIOD THAN 14
GREATER THAN OF GREATER DAYS, AND 14 DAYS, UNDER
14 DAYS, UNDER NOT UNDER AND NOT
AND NOT ABOVE REFERENCED ABOVE SURVEYS. REFERENCED SURVEYS. RAINFALL AND REPAIRING AS NECESSARY. ACTIVE CONSTRUCTION, WILL
ACTIVE CONSTRUCTION, BE TEMPORARILY WILL BE TEMPORARILY SEEDED AND HAY
SEEDED AND MULCHED OR HAY MULCHED OR OTHERWISE WITH
PROVIDED WITH OTHERWISE PROVIDED [#2] Lo TO BEOSED CABION SEDIMENT BARRIER AND THEN TROT
File revisions (1)
- Sep 29, 2026
00d0dba76ba67,781,144 bytes