Supporting Documentation · Mar 26, 2024
99-24 Exhibit to Temporary Extension Agreement.pdf
00d0dba76ba6d3d1d7a63a33656ba8a40ca72823740f177df05bad83d7b1ada0Indexed text
AREA OF DISTURBANCE of Jenne IMMEDIATELY THE GRAPHIC SCALE ROE CONSTRUCTION. PROPOSED CONTRI. AREA OF DISTURBANCE
RI. AREA OF DISTURBANCE LATEX EMULSION 12.5:1 FINE SPRAY 235 4. 4. SEDIMENT FENCES SEDIMENT FENCES ARE
SEDIMENT FENCES ARE ARE TO BE PROPERLY TO BE PROPERLY TRENCHED AND MAINTAINED
TRENCHED AND MAINTAINED UNTIL UNTIL PERMANENT
PERMANENT VEGETATIVE VEGETATIVE —_—_—m
—_—_—m COVER ESTABLISHED COVER ISIS ESTABLISHED 5. CONSTRUCTION MUST BE PERFORMED
PERFORMED IN AD ACCORDANCE WITH ALL ALL FEDERAL, FEDERAL, Authorization of
Authorization of bl bl bl bl bl 100° 50 0 100 200 5. TATE AND LOCALMUST CONSTRUCTION
RULED,BE AU ALONG IN RECIRE ENT ACCORDANCE WITH TOTAL - 560.200 SF ( | 2 98 ACRES) RESIN IN WATER 4:1 FINE SPRAY 300
4:1 FINE SPRAY 300 5. ALL STORM STORM DRAINAGE
File revisions (1)
- Sep 29, 2026
00d0dba76ba67,781,144 bytes