Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Mar 26, 2024

99-24 Exhibit to Temporary Extension Agreement.pdf

Preserved file SHA-25600d0dba76ba6d3d1d7a63a33656ba8a40ca72823740f177df05bad83d7b1ada0

Indexed text

Page 70

AREA OF DISTURBANCE of Jenne IMMEDIATELY THE GRAPHIC SCALE ROE CONSTRUCTION. PROPOSED CONTRI. AREA OF DISTURBANCE

Page 70

RI. AREA OF DISTURBANCE LATEX EMULSION 12.5:1 FINE SPRAY 235 4. 4. SEDIMENT FENCES SEDIMENT FENCES ARE

Page 70

SEDIMENT FENCES ARE ARE TO BE PROPERLY TO BE PROPERLY TRENCHED AND MAINTAINED

Page 70

TRENCHED AND MAINTAINED UNTIL UNTIL PERMANENT

Page 70

PERMANENT VEGETATIVE VEGETATIVE —_—_—m

Page 70

—_—_—m COVER ESTABLISHED COVER ISIS ESTABLISHED 5. CONSTRUCTION MUST BE PERFORMED

Page 70

PERFORMED IN AD ACCORDANCE WITH ALL ALL FEDERAL, FEDERAL, Authorization of

Page 70

Authorization of bl bl bl bl bl 100° 50 0 100 200 5. TATE AND LOCALMUST CONSTRUCTION

Page 70

RULED,BE AU ALONG IN RECIRE ENT ACCORDANCE WITH TOTAL - 560.200 SF ( | 2 98 ACRES) RESIN IN WATER 4:1 FINE SPRAY 300

Page 70

4:1 FINE SPRAY 300 5. ALL STORM STORM DRAINAGE

File revisions (1)