Supporting Documentation · Mar 26, 2024
99-24 Exhibit to Temporary Extension Agreement.pdf
00d0dba76ba6d3d1d7a63a33656ba8a40ca72823740f177df05bad83d7b1ada0Indexed text
OF 50 AND MINIMUM FEET AND
2'-0" MIN. =z SILT ACCUMULATION ©O\ Ss = 6”. ALL DRIVEWAYS MUST BE PROVIDED WITH CRUSHED STONE
= 6”. ALL DRIVEWAYS MUST BE PROVIDED WITH CRUSHED STONE UNTIL PAVING IS COMPLETE. BN* 5 GRADE 9 X CRADE aN 4. STEEP
14. STEEP SLOPES SLOPES INCURRING
INCURRING DISTURBANCE DISTURBANCE MAYMAY REQUIRE
REQUIRE ADDITIONAL ADDITIONAL STABILIZATION STABILIZATION MEASURES.
STABILIZATION MEASURES. MEASURES. THESE THESE for
THESE for the “22777 “SPECIAL” MEASURES MEASURES SHALL
SHALL BE BE DESIGNED
DESIGNED BY BY THE
File revisions (1)
- Sep 29, 2026
00d0dba76ba67,781,144 bytes