Supporting Documentation · Mar 26, 2024
99-24 Exhibit to Temporary Extension Agreement.pdf
00d0dba76ba6d3d1d7a63a33656ba8a40ca72823740f177df05bad83d7b1ada0Indexed text
MATERIALS MATERIALS TIME TASK nor by oO \ I.
1. SILT FENCE SILT FENCE CLOTH: CLOTH: FILTER
FILTER X, POLY-FILTER X, X, POLY-FILTER MIRIFI 100X, X, MIRIFI 1
X, MIRIFI 1 OOX, LAUREL LAUREL 77 SEDIMENT CONTROL CLOTH,
EROSION CONTROL BIDIM OR CLOTH, BIDIM APPROVED EQUAL OR APPROVED (SUN
EQUAL (SUN a Rae Tre 72 HOURS PRIOR TO ANY SOIL RESISTANT)
EROSION project, nor ® BARRIER (SEE RESISTANT) other project, DETAIL) ~~ 2.
2. POST: 2" POST: OR "T" HARDWOOD OR
HARDWOOD OR 2" HARDWOOD OF "D" "T" OF STEEL (WEIGHING
TYPE STEEL "D" TYPE LESS NOT LESS
File revisions (1)
- Sep 29, 2026
00d0dba76ba67,781,144 bytes