Supporting Documentation · Mar 26, 2024
99-24 Exhibit to Temporary Extension Agreement.pdf
00d0dba76ba6d3d1d7a63a33656ba8a40ca72823740f177df05bad83d7b1ada0Indexed text
(95% MAX. DENSITY) DRY DENSITY) MATERIALS a NOTE EQUIPMENT
a NOTE EQUIPMENT NO EQUIPMENT NOTE -- NO BEYOND EDGE
BEYOND EDGE BEYOND EDGE OF DISTURBED EXISTING DISTURBED
EXISTING DISTURBED EXISTING OF —t
—t ASPHALT PAVEMENT ASPHALT PAVEMENT DETAIL DETAIL
DETAIL MO U AREA (REACH WITH AREA (REACH WITH l= 6" THICK STONE
REACH WITH l= 6" THICK STONE 3 NOT TO NOT SCALE TO SCALE
ONLY TO BUCKET ONLY CLEAR | I of Jenne BUCKET TO CLEAR
BUCKET TO CLEAR EXISTING SOIL EXISTING SOIL ANY SEDIMENT
ANY MATERIAL SEDIMENT MATERIAL FROFOSED NEW ASFEHALT TRAVEL WAY | DOWN THE
File revisions (1)
- Sep 29, 2026
00d0dba76ba67,781,144 bytes