Supporting Documentation · Nov 25, 2024
320-24 Grabowski INVOICE.pdf
9c6bae69304d7d3f60c122ca8fa3c10226e11858d41a92092e8cb4a9ea52ee99Indexed text
GRABOWSKI CONSTRUCTION, INC 770 Northfield Ave West Orange NJ 07052 Ph: 973-731-0111 Fax: 973-731-6709 Email - Grabowskiconst@gmail.com INVOICE Attention: Job Name: Location: Storm Manhole Repair Plan Date: Township of West Orange 25 Lakeside Avenue West Orange NJ Labor Plans By: Job #: Revised: Prepared By: J. Lanza Geotech Report By: Report Date: Tax Exempt: Sheets: Date: Index Date: Fuel Index: Asphalt Index: All pricing based on the current NJDOT fuel & asphalt indexs listed below. All pricing is subject to change and will be reevalutated at the time the work is performed. Any additional costs due to index escalation is excluded and will be passed on to the owner ********************************************************* All pricing listed in this estimate are based on labor, equipment & material costs at the time of the original estimate submission. Due to volatility of material costs and overal escalation,Grabowski Construction can only guaruntee pricing for 15 days Please see the note below the grand total price related to material cost escalation. Additionaly, unit prices may subject to change due to the following: -Changes in quantities -Changes to the overal scope of work -Phasing/Sequence of work changed ********************************************************* 11/4/2024 01. Storm Manhole Repair Description UOM U/P Ext. PriceQty Saw cut pavement Removal & Disposal of pavement around Manhole Repair/Restore Deteriorated Manhole Replace Bricks & Re-grout Joints Patch Asphalt Subtotal - $7,200.00 $7,200.00Grand Total - Notes: Storm Manhole Repair Job #: Wellington Ave Yes Open Shop 2024-1011 **Work done on a saturday**
File revisions (1)
- Sep 29, 2026
9c6bae69304d347,511 bytes