Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · May 6, 2025

131-25 Invoice-RIGGI_TownshipofWestOrange_BolandPark.pdf

Preserved file SHA-25612dd3b890f5556930c94cb40eafbc91a4d7a3a02e3d68de2712b00fa845528fa

Indexed text

Page 1

FRANK RIGGI JR. ◆ 21 THIRD STREET RIDGEFIELD PARK, NJ 07660 ◆ FAX: (201) 944 – 4465 RIGGIPAVINGINC@GMAIL.COM ◆ WWW.RIGGIPAVING.COM PLEASE SEND PAYMENT TO: 21 Third Street Ridgefield Park, NJ 07660 Thank you, we appreciate your business! BILL TO: Township of West Orange 25 Lakeside Ave. West Orange, NJ 07052 Attn: Jim Williams DESCRIPTION AMOUNT 1. Asphalt Pave Paver Block Area: A. Approximately 7,000 sq. ft. (Jim William’s measurements). B. Remove and dispose of existing paver block. C. Fine grade area and compact. D. Install 4” stabilize base asphalt to entire area (19.5 m64). E. Install 2” compacted 9.5 m64 surface coarse asphalt to entire area. 2. Asphalt Pave Walkway behind Curb: A. Approximately 1,095 sq. ft. and re-route part of path. B. Remove and dispose of existing walkway. C. Re-route part of path due to handicap space added. D. Install additional stone base to entire area and compact. E. Install 2” compacted I-5 surface coarse asphalt to entire area. 3. Reconfigure Handicap Area: A. Dig out soil and grade on site. B. Install 6” compacted stone base to area. C. Install 4” compacted 19m64 base asphalt to area. D. Install 2” compacted 9.5 m64 surface coarse asphalt to area. 4. Stripe Area as Shown. $68,975.00 $7,500.00 $2,900.00 $2,400.00 JOB LOCATION: Boland Park DATE: 4/7/25 INVOICE #: 14018 TOTAL: $81,775.00 DEPOSIT: $0.00 PAYMENT TERMS: upon receipt A finance charge of 1.5% per month will be added on all accounts overdue 30 days. BALANCE DUE: $81,775.00 NJ Sales Tax (6.625%) $0.00

File revisions (1)