Supporting Documentation · May 20, 2025
2924-25 Ordinance Amending and Supplementing Chapter 20 Sections 1.1 et seq.- Revised 04292025 (002).pdf
706d411f86079a09f2a820f1ada972d4276ca0e92c4c6216e018659c1d818dcaIndexed text
Township of West Orange, NJ 12 b. Conditions. Permittees shall be responsible to contact the Department of Engineering for Municipal Engineer to determine whether a street is scheduled to be rebuilt under a street reconstruction project. c. Application. 1. Permittees shall include on the application the justification for any street opening activities on protected streets. 2. The permittee shall attach the "Protected Street Opening Permit Application attachment" to the Street Opening permit application prior to obtaining the permit. d. No backfill of any opening or excavation on a protected street shall be performed unless the permittee notifies the Department of Engineering at least 48 hours prior to the scheduled start time for the backfill. In no case shall the permittee commence the backfill prior to the scheduled start time. For the HMA base and surface course, the permittee shall fax/email its daily paving schedule to the Department of Engineering prior to commencing work. In addition, during the backfill and compaction phase of the work, permittees must provide, on site, a certified compaction tester from an approved laboratory or a licensed certified tester to test that the compaction of the backfills is in accordance with the Department of Engineering’s rules and specifications. Upon completion of temporary restoration measures, a thirty-day settlement period shall be observed. Upon completion of the settlement period, final (permanent) restorations shall be completed within 10 working days, or as directed by the Department of Engineering should the final restoration period fall within the winter season. e. The Department of Engineering may inspect any phase of the work, including but not limited to initial excavation, backfill and compaction, performance of required cut backs, and final restoration. f. A certification issued by a New Jersey licensed professional engineer shall be provided to the Municipal Engineer within 30 days of completion of work on protected streets. The certification shall state that the type of work performed was as described in the permit application, and that all phases of the restoration were performed in accordance with the Township rules and specifications. g. Permittees shall be responsible for the proper repair of the street opening or excavation for a period of three years from the date of completion or for the
h the Township rules and specifications. g. Permittees shall be responsible for the proper repair of the street opening or excavation for a period of three years from the date of completion or for the duration of the protected street guarantee period, whichever is longer. h. Where street openings cannot be confined to within four feet of the curb line, including the required cut back, and/or within the sidewalk area, full curb to curb roadway restoration
Township of West Orange, NJ 13 shall be required where protected street status has been in effect for 48 months or less, unless otherwise directed by the Municipal Engineer. i. In the event a permanent restoration pavement installed in violation of the provisions of paragraph 1 of this paragraph d settles more than two inches below the surrounding existing surface during the life of such permanent restoration, this shall be deemed a failure of the backfill compaction, in which case, the permittee shall remove all of the failed backfill, down to the subsurface facility, and install new, properly compacted backfill and the final finish should be infrared for a smooth trench. j. In those circumstances where a non-emergency linear opening or excavation is performed on a street where protected streets status has been in effect for a period of ten years or less, then the permittee shall be required to perform full curb to curb roadway restoration on the protected street, plus curb-to-curb repaving of another street in the area, as designated by the Municipal Engineer with the consent of the Mayor and Council. The length of the repaving of the additional street shall be substantially equivalent (as determined by the Municipal Engineer) to the length of the restoration of the protected street that was opened/excavated within this ten -year period. § 20-1.9 Violations and Penalties Any person who shall violate any of the provisions of this ordinance, or take part in or assist in any violation, or who shall violate or fail to comply with any order or regulation made under the provisions of this ordinance, or shall make any excavation or store any material within the line of any municipally controlled road or street in the Township of West Orange, except as allowed by permit under the provisions of this ordinance, shall severally for each and every such violation or noncompliance, respectively, not otherwise provided for, be liable to the maximum penalty as per N.J.S.A. 40:49-5 as follows: The Township Council may prescribe penalties for the violation of ordinances it may have authority to pass, by one or more of the following: imprisonment in the county jail or in any place provided by the municipality for the detention of prisoners, for any term not exceeding 90 days; or by a fine not exceeding $2,000; or by a period of community service not exceeding 90 days.
y place provided by the municipality for the detention of prisoners, for any term not exceeding 90 days; or by a fine not exceeding $2,000; or by a period of community service not exceeding 90 days. The Township Council may prescribe that for the violation of any particular ordinance at least a minimum penalty shall be imposed which shall consist of a fine which may be fixed at an amount not exceeding $100. The Township Council may prescribe that for the violation of any particular ordinance at least a minimum penalty shall be imposed which shall consist of a fine which may be fixed at an amount not exceeding $100. Should any person, firm, or corporation in violating any of the provisions of this ordinance, after notice of such violation, continue such violation, each 24 hours that the same shall be continued shall be construed to constitute a separate and distinct violation. Any person, firm, or corporation who is convicted of violating the ordinance within one year of the date of a previous violation of this ordinance and who was fined for the previous violation, shall be
14 sentenced to an additional fine as a repeat offender. The additional fine as imposed upon a person, firm, or corporation for repeated offense shall not be less than the minimum or exceed the maximum fine imposed for a violation of the ordinance, but shall be calculated separately from the fine imposed for the initial conviction of violating the ordinance. Any person, firm, or corporation convicted of the violation of any provision of this ordinance may, in the discretion of the Court by which he was convicted, and in default of the payment of any fine imposed therefore, be imprisoned by the County jail or place of detention provided by the Township, for any term not exceeding 90 days, or be required to perform community service for a period not exceeding 90 days. III. REPEAL OF CONFLICTING ORDINANCES Any Ordinances of the Township which are in conflict with this Ordinance are hereby repealed to the extent of such conflict. IV. SEVERABILITY If any part of this Ordinance shall be deemed invalid, such parts shall be severed and the invalidity thereof shall not affect the remaining parts of this Ordinance. V. EFFECTIVE DATE This Ordinance shall take effect upon final passage and publication in accordance with the law. Karen J. Carnevale, R.M.C. Susan McCartney Municipal Clerk Mayor Joseph Krakoviak Council President Introduced: May 6, 2025 Adopted: May 20, 2025 2924-25
15 2924-25 LEGISLATIVE HISTORY This Ordinance amends and supplements Chapter 20 Streets and Sidewalks to supplement permit procedures and general specifications for contractors to excavate streets and sidewalks in the Township. It also outlines the requirement for applicants and contractors to provide a Public Works Contractor Registration Certificate issued by the New Jersey Department of Labor and Workforce Development at the time of applying for a road opening permit. Also, additional application procedures and requirements were added to Section 20.1C to supplement the ordinance.
File revisions (1)
- Sep 29, 2026
706d411f8607419,399 bytes