Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Aug 12, 2025

188-25 Resolution Awarding a Contract for the Performance of Preliminary Engineering Services to Greenman Pedersen Inc.pdf

Preserved file SHA-256940d4ac8921a95420409d6c3b471f98af426a23ff5de21d3c6ab4b98a7428ff6

Indexed text

Page 1

188-25 August 12, 2025 R E S O L U T I O N- AWARDING A CONTRACT FOR THE PERFORMANCE OF PRELIMINARY ENGINEERING (PE) SERVICES TO GREENMAN – PEDERSEN, INC FOR THE WASHINGTON STREET CORRIDOR IMPROVEMENT PROJECT PHASE 2 WHEREAS, the Township of West Orange wishes to perform improvements to the Washington Street corridor from Liberty Street to the City of East Orange limits; and WHEREAS, the Township has been awarded NJDOT Local Aid and Economic Development Transportation Alternatives Program (TAP) grant funding in the amount of $707,000.00 for this project; and WHEREAS, the Township requires the services of a professional engineering firm and land surveying firm to oversee the Preliminary Engineering (PE) phase of this project; and WHEREAS, one of the distinctive features of this TAP grant is additional funding is provided via a Design Assistance Program to cover the consultant’s cost if one of the five NJDOT prequalified consultants is selected to oversee this project, so as not to impact the $707,000.00 grant total; and WHEREAS, NJDOT conducted a TAP Set-Aside Assistance Consultant Selection by evaluating, rating, and ranking consultants and Greenman – Pedersen, Inc. (GPI) was one of the four consultants qualified through this process to perform these services; and WHEREAS, the Township needs to endorse GPI contract (Exhibit A) that serves as the Notice to Proceed, so that Preliminary Engineering (PE) commence for this project; and WHEREAS, GPI has submitted a proposal as part of the Executed Federal Aid Agreement (Exhibit B) approved on July 17, 2025 for completing the Preliminary Engineering (PE) Phase of this project at a total cost of $155,437.29; and WHEREAS, Greenman – Pedersen, Inc., have performed similar work for the Township on several projects and their work quality is very good; and

Page 2

WHEREAS, the Municipal Engineer recommends the professional services contract be awarded to Greenman – Pedersen, Inc., 301 Gibraltar Drive, Suite 2A, Morris Plains, NJ 07950 for the Preliminary Engineering (PE) Phase of this project; and WHEREAS, Greenman – Pedersen, Inc., responded to the Township’s Request for Qualifications for Professional Services for 2025; and WHEREAS, sufficient funds exist for the services outlined in the proposal of Greenman – Pedersen, Inc.; and WHEREAS, the Township Council concurs in the foregoing. NOW THEREFORE BE IT RESOLVED by the Township Council of the Township of West Orange, New Jersey that a professional services contract be awarded to Greenman – Pedersen, Inc., to provide professional engineering and land surveying services for the 2023 Transportation Alternatives Program (TAP) Grant Project for the WASHINGTON STREET CORRIDOR IMPROVEMENT PROJECT PHASE 2 in an amount not to exceed $155,437.29. BE IT FURTHER RESOLVED that a copy of this Resolution be published in the West Orange Chronicle within ten (10) days of its approval as required by State Statute. _____________________________________ _______________________________________ Karen Carnevale, R.M.C. Joe Krakoviak Municipal Clerk Council President Adopted: August 12, 2025 I hereby certify funds are available from: ACCOUNT NO. $155,437.29 _____________________________________ John Ditinyak, Chief Financial Officer

File revisions (1)