Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Apr 28, 2026

129-26 (Exhibit A) STV-consultant-ageement_2026-01-05.pdf

Preserved file SHA-256ce3dc33c6f7d7241bcc0d9482fc70d2af2d8fb3d09f3e8b98b1345a9e5414c8d

Indexed text

Page 6

Project No. ______________ 6.5 Survival of Provisions. Termination of this Agreement for any reason whatsoever will not affect any right or obligation of any party which is accrued or vested prior to such termination, and any provision of this Agreement relating to any such right or obligation will be deemed to survive the termination of this Agreement. The indemnity, limitation of liability, representations, warranties, covenants, guarantees, confidentiality obligations, insurance requirements, and intellectual property rights provisions set forth herein will survive termination or expiration of this Agreement, in addition to any other provisions which by their nature should, or by their express terms do, survive or extend beyond termination or expiration of this Agreement. 6.6 Third Parties. Nothing contained in this Agreement creates a contractual relationship with, or a cause of action in favor of, a third party against either STV or Client. STV’s Services under this Agreement are being performed on behalf of and solely for the benefit and exclusive use of Client for the limited purposes of this Agreement, and no person or other entity will have any claim against STV because of this Agreement. In addition, nothing herein will be construed as creating a contractual relationship between Client and any STV employee, representative, or consultant. Client agrees that in the event of a dispute regarding this Agreement or the Services rendered by STV, Client will only seek recourse against STV and hereby expressly waives any and all right to pursue a claim against STV’s individual officers, directors, or employees. 6.7 Assignment. This Agreement will bind the partners, heirs, executors, administrators, successors, permitted assigns, and legal representatives of the Parties. Client will not sell, assign, sublet, or otherwise transfer any rights under or interest in this Agreement without the prior written consent of STV. STV reserves the right to assign this Agreement to its affiliates, subsidiaries, or successors as necessary in order to effectively carry out and complete the Services specified by this Agreement. 6.8 Severability. If any provision of this Agreement is held to be illegal, invalid, or unenforceable under present or future laws, such provision will be revised to give it the maximum effect allowed by law, or, if a revision is

Page 6

ision of this Agreement is held to be illegal, invalid, or unenforceable under present or future laws, such provision will be revised to give it the maximum effect allowed by law, or, if a revision is not possible, will be fully severable, and this Agreement will be construed and enforced as if such illegal, invalid, or unenforceable provision is not a part hereof, and the remaining provisions hereof will remain in full force and effect. 6.9 Headings and Construction. All section headings herein are for convenience of reference only and are not part of this Agreement, and no construction or inference will be derived therefrom. Each party and, if it so chooses, its counsel have reviewed and revised this Agreement and that the normal rule of construction to the effect that any ambiguities are to be resolved against the drafting party will not be employed in the interpretation of this Agreement or any amendments or exhibits. 6.10 No Waiver. No waiver of satisfaction of a condition or nonperformance of an obligation under this Agreement will be effective unless it is in writing and signed by the party granting the waiver. 6.11 Counterparts. This Agreement may be executed in counter-part originals and/or by electronic means, with each Party cooperating to provide the other with an original executed version. 6.12 Entire Agreement. The exhibit(s) to this Agreement are incorporated by reference into, attached to, and made a part of this Agreement. This Agreement, together with all exhibits attached, constitutes the entire Agreement between the Parties relating to the transaction described herein and 06 – Professional Services Agreement Page 6 of 10 Rev. 4/2025

Page 7

Project No. ______________ supersedes any and all prior oral or written understandings. No amendment or modification to this Agreement will be effective unless it is in writing and signed by authorized representatives of both Parties. ----- Signature Page Follows ----- 06 – Professional Services Agreement Page 7 of 10 Rev. 4/2025

Page 8

Project No. ______________ SIGNATURE PAGE IN WITNESS WHEREOF, the parties have made and executed this Agreement that is effective as of the date first above written. STV Incorporated Township of West Orange 997 Lenox Drive, Suite 102 25 Lakeside Avenue Lawrenceville, NJ 08648-2317 West Orange, NJ 07052 Attention: Iris Giboyeaux Attention: Zayibeth Carballo Email: Iris.Giboyeaux@stvinc.com Email: zcarballo@westorange.org By: By: Name: Name: Title: Title: 06 – Professional Services Agreement Page 8 of 10 Rev. 4/2025

Page 9

Project No. ______________ EXHIBIT A SCOPE OF SERVICES [to be inserted] 06 – Professional Services Agreement (Exhibit A) Page 9 of 10 Rev. 12/2024

Page 10

Gregory Avenue and Lowell Avenue Safe Routes to School TOWNSHIP OF WEST ORANGE ESSEX COUNTY, NJ Technical and Price Proposal Prepared For: Township of West Orange 66 Main Street West Orange, New Jersey 07052 Prepared By: STV Incorporated 997 Lenox Drive, Suite 102 Lawrenceville, NJ 08648 October 2025

Page 11

TECHNICAL PROPOSAL Table of Page Contents Contents I. Project Description........................................................................................................................... 1 Scope of Services ................................................................................................................................... 2 A. PRELIMINARY ENGINEERING PROJECT MANAGEMENT & CONTROLS........... 2 1. PROJECT MANAGEMENT ............................................................................................................ 2 2. EXECUTE PE PUBLIC INVOLVEMENT ACTION PLAN (PIAP) (3874) ................................... 2 3. QUALITY ASSURANCE / QUALITY CONTROL ........................................................................ 3 4. INITIATE PRELIMINARY ENGINEERING (3005) ...................................................................... 3 B. PRELIMINARY ENGINEERING ......................................................................................... 3 1. SURVEY ........................................................................................................................................... 3 2. GEOMETRICS AND ROADWAY .................................................................................................. 4 3. TRAFFIC ........................................................................................................................................... 5 4. DRAINAGE / H&H / SWM .............................................................................................................. 5 5. STRUCTURES.................................................................................................................................. 6 6. GEOTECHNICAL ENGINEERING ................................................................................................ 6 7. RIGHT OF WAY (ROW) AND EASEMENTS ............................................................................... 7 8. ACCESS

Page 11

.................................................... 6 7. RIGHT OF WAY (ROW) AND EASEMENTS ............................................................................... 7 8. ACCESS ............................................................................................................................................ 8 9. UTILITIES ........................................................................................................................................ 8 10. PRE-CONSTRUCTION .................................................................................................................. 10 11. ENVIRONMENTAL....................................................................................................................... 10 C. FINAL DESIGN PROJECT MANAGEMENT & CONTROLS ....................................... 11 1. PROJECT MANAGEMENT .......................................................................................................... 11 2. EXECUTE FD PUBLIC INVOLVEMENT ACTION PLAN (PIAP) (4795) ................................ 11 3. QUALITY ASSURANCE / QUALITY CONTROL ...................................................................... 11 4. INITIATE FINAL DESIGN (4010) ................................................................................................ 12 D. FINAL DESIGN ..................................................................................................................... 12 1. GEOMETRICS AND ROADWAY ................................................................................................ 12 2. TRAFFIC ......................................................................................................................................... 13 3. DRAINAGE / HYDROLOGY & HYDRAULICS / STORMWATER MANAGEMENT ............ 13 4. STRUCTURES................................................................................................................................ 13 5. GEOTECHNICAL ENGINEERING .............................................................................................. 13 6. RIGHT OF WAY AND EASEMENTS .......................................................................................... 15 7. ACCESS

Page 11

............................................. 13 6. RIGHT OF WAY AND EASEMENTS .......................................................................................... 15 7. ACCESS .......................................................................................................................................... 15 8. UTILITIES ...................................................................................................................................... 15 9. PRE-CONSTRUCTION .................................................................................................................. 16 10. ENVIRONMENTAL....................................................................................................................... 16 11. Landscape ........................................................................................................................................ 17 12. REPORTS AND SUBMISSIONS................................................................................................... 17

Page 12

E. CONSTRUCTION ENGINEERING SERVICES PROJECT MANAGEMENT ............ 18 1. PROJECT MANAGEMENT .......................................................................................................... 18 F. CONSTRUCTION SUPPORT SERVICES......................................................................... 18 1. ADVERTISEMENT AND BIDS .................................................................................................... 18 2. CONTRACT AWARD.................................................................................................................... 18 3. CONSTRUCTION .......................................................................................................................... 19 4. CLOSE OUT ................................................................................................................................... 20 III. Price Proposal IV. Subconsultant Scopes of Work and Cost Proposals

File revisions (1)