Page 298

811.04 MEASUREMENT AND PAYMENT THE FOLLOWING ITEMS ARE ADDED: Pay Item Pay Unit SMALL DECIDUOUS TREE, 2.0-2.5 CAL., B&B UNIT THE LAST PARAGRAPH IS REPLACED WITH THE FOLLOWING: The Township will make no payment for plants rendered unacceptable until replaced with healthy specimen of similar species and size. Tree plantings shall include the root control system, drip bag watering system, and water. The Township will make no payment for wood chip mulching associated with planting. All costs shall be included in the price bid for the plant material. The limits for wood chip mulch associated with planting will extend from the center of the plant out to the drip line or edge of the plant pit/bed, whichever is greater. HELEN AVE., LAWRENCE AVE., FLORENCE PL., AND LOWELL AVE., IMPROVEMENTS PROJECT Page 68 of 76

Page 299

DIVISION 900 – MATERIALS SECTION 902 – ASPHALT 902.01.01 Asphalt Binder THE FIRST TWO PARAGRAPHS ARE CHANGED TO: Use an asphalt binder that is storage-stable and conforms to AASHTO M 332. Include compliance with the elastic response requirement in Figure 1 of AASHTO R 92, if applicable. 902.02.01 Mix Designations PART (4) IS CHANGED TO: 4. “E” The fourth field in the Item description designates the high temperature designation of the performance- graded binder. Options are “64” for PG 64S-22 and “E” for PG 64E-22. 902.02.03 Mix Design THE FOLLOWING IS ADDED TO THE FIRST PARAGRAPH: Unless otherwise approved by the engineer, only one source of supply for hot mix asphalt surface course may be used on the project. 902.02.04 Sampling and Testing A General Acceptance Requirements. THE SECOND PARAGRAPH OF SECTION (A) IS CHANGED TO: For PG 64S-22, ensure that the temperature of the mixture at discharge from the plant or surge and storage bins is at least 290 °F when the ambient temperature is less than 50 °F or is at least 275 °F when the ambient temperature is greater than or equal to 50 °F. For PG 64E-22, ensure that the temperature of the mixture at discharge from the plant or surge and storage bins is at least 10 °F above the manufacturer’s recommended laydown temperature. For mixes produced using a WMA additive or process, ensure that the temperature of the mixture at discharge from the plant or surge and storage bins is at least 10 °F above the WMA manufacturer’s recommended laydown temperature. D. Acceptance Testing and Requirements. PART D IS CHANGED TO: The ME will determine volumetric properties at Ndes for acceptance from samples taken, compacted, and tested at the HMA plant. The ME will compact HMA to the number of design gyrations (N des) specified in Table 902.02.03-2, using equipment according to AASHTO T 312. The ME will determine bulk specific gravity of the compacted sample according to AASHTO T 166. The ME will use the most current QC maximum specific gravity test result in calculating the volumetric properties of the HMA. The ME will determine the dust-to-binder ratio from the composition results as tested by the QC technician. Ensure that the HMA mixture conforms to the requirements specified in Table

Page 299

e HMA. The ME will determine the dust-to-binder ratio from the composition results as tested by the QC technician. Ensure that the HMA mixture conforms to the requirements specified in Table 902.02.04-1, and to the gradation requirements in Table 902.02.03-1. If the test results are outside of the gradation or volumetric requirements specified in Table 902.02.03-1 or Table 902.02.04-1 for an acceptance sample, immediately run a quality control sample. If the quality control sample is also outside of the requirements specified in Table 902.02.03-1 or Table 902.02.04-1, determine if a plant adjustment is needed and take corrective action to bring the mix into compliance. Take an additional quality control sample immediately after completing the corrective action to ensure that the mix is within the requirements. If the mix is within the requirements based on the quality control sample results, then the ME will HELEN AVE., LAWRENCE AVE., FLORENCE PL., AND LOWELL AVE., IMPROVEMENTS PROJECT Page 69 of 76

Page 300

immediately take an acceptance sample to test and verify that the composition meet gradation and volumetric requirements specified in Table 902.02.03-1 and Table 902.02.04-1. If 2 consecutive acceptance or quality control samples are outside the gradation or volumetric requirements specified in Table 902.02.03-1 or Table 902.02.04-1, immediately stop production and shipping. After a production stop, obtain ME approval of a plant correction plan before resuming production. Upon restarting production, do not transport mixture to the Project Limits before the results of a quality control sample from the mixture indicate that the mixture meets gradation and volumetric requirements specified in Table 902.02.03-1 and Table 902.02.04-1 and ME approval. The ME will reject mixture produced at initial restarting that does not meet gradation and volumetric requirements specified in Table 902.02.03-1 and Table 902.02.04-1. The ME will test a minimum of 1 sample per 3,500 tons for moisture, basing moisture determinations on the weight loss of an approximately 1,600 gram sample of mixture heated for 1 hour in an oven at 280 ± 5 °F. Ensure that the moisture content of the mixture at discharge from the plant does not exceed 1.0 percent. Table 902.02.04-1 Hot Mix Asphalt Requirements for Control Required Density Voids in Mineral Aggregate (VMA), (% of Theoretical Max. % (minimum) Compaction Dust-to-Binder Levels Specific Gravity) Nominal Max. Aggregate Size, mm Ratio @Ndes1 37.5 25.0 19.0 12.5 9.5 4.75 L, M 95.0 – 97.0 11.0 12.0 13.0 14.0 15.0 16.0 0.6 – 1.3 1. As determined from the values for the maximum specific gravity of the mix and the bulk specific gravity of the compacted mixture. Maximum specific gravity of the mix is determined according to AASHTO T 209.

Page 300

m the values for the maximum specific gravity of the mix and the bulk specific gravity of the compacted mixture. Maximum specific gravity of the mix is determined according to AASHTO T 209. Bulk specific gravity of the compacted mixture is determined according to AASHTO T 166. 902.02.04 Sampling and Testing THE FOLLOWING SUBSECTION IS ADDED: E. Acceptance of HMA. The Department may accept the HMA as specified in 902.02.04.A through 902.02.04.E by employing staff or an independent testing agency at the HMA plant during production. The inspector who performs the quality assurance sampling shall be certified by the Society of Asphalt Technologists of New Jersey as an Asphalt Plant Technologist, Level 2. Form “DS-8 HMA Testing Summary Report – State Aid” provided on the Local Aid Website must be utilized by the Laboratory to report their findings to the RE. Alternatively, the Department may accept the HMA by Certification of Compliance according to 106.07. SECTION 903 – CONCRETE 903.01 CEMENT THE ENTIRE SUBSECTION TEXT IS CHANGED TO: Use cement, listed on the QPL, that is either portland cement or blended hydraulic cement and conforms to the following: Portland Cement, Type I, II, and Type III ................................................................................................ ASTM C 150 Blended Hydraulic Cement, Type IS, IP, and IL ..................................................................................... ASTM C 595 Only use Type III portland cement for Class V concrete, prestressed Items, and precast Items. Use portland cement pre-blended with a maximum of 25 percent fly ash, by weight, or a maximum of 5 percent silica fume by weight, or with a maximum of 50 percent slag by weight for blended hydraulic cement Type IS or IP. Use portland cement pre-blended with a minimum of 5 percent limestone content and a maximum of 15 percent limestone content by HELEN AVE., LAWRENCE AVE., FLORENCE PL., AND LOWELL AVE., IMPROVEMENTS PROJECT Page 70 of 76

Page 301

weight for blended hydraulic cement Type IL. Ensure that a scaling test according to ASTM C 672 is completed on the mix design if more than 30 percent slag is used and that the concrete has a visual rating less than 3 after 50 cycles. Do not add additional mineral admixtures to blended hydraulic cements Type IS or IP at the concrete plant unless approved by the ME. The use of additional mineral admixtures in blended hydraulic cement Type IL at the concrete plant is permitted if the mineral admixture is listed on the QPL Do not mix different brands of cement, the same brand of cement from different mills, or different types of cement. Provide suitable means for storing and protecting the cement against dampness. The ME will reject cement that has become partially set or that contains lumps of caked cement. Ensure that the temperature of the cement at the time of delivery to the mixer does not exceed 160 °F. SECTION 911 – SIGNS, SIGN SUPPORTS, AND DELINEATORS 911.01.01 Materials B. Retroreflective Sheeting. TABLE 911.01.01-2 IS CHANGED TO: THE SECOND SIGN TYPE IN TABLE 911.01.01-2 IS CHANGED TO: Table 911.01.01-2 Allowable Sign Sheeting Types Sign Type Test Method Type Type III, Type VIII, Regulatory and Warning Signs ASTM D 4956 Type IX or Type XI1 Type III, Type VIII, Guide Signs Mounted on Steel “U” or Square Tube Posts ASTM D 4956 Type IX or Type XI Guide Signs Mounted on Overhead Sign Structures, Breakaway Sign Type VIII, Type IX or ASTM D 4956 Supports, or Non-breakaway Sign Supports

Page 301

ASTM D 4956 Supports, or Non-breakaway Sign Supports Type XI2 1. Ground-mounted signs with white background shall be ASTM Type IX. 2. Do not use ASTM Type XI sheeting with any existing sign lighting improvement or signs that are lit. 911.01.02 Fabrication A. Sign Panels. THE SECOND PARAGRAPH IN PART A IS CHANGED TO: Fabricate flat sheet signs from a single piece of sheet aluminum without joints, using the thicknesses specified in Table 911.01.02-1. Drill or punch 3/8 inch diameter holes in the sign blank for attachment to sign supports. Locate holes according to the 2004 Edition of Standard Highway Signs and Markings Book. If the panel is larger than 5 feet in any dimension, reinforce the panel with z-bars. THE THIRD PARAGRAPH OF PART A IS CHANGED TO: For multiple panel signs, use 1 foot wide extruded sections bolted together. Join sign panel sections together at the flanges with 3/8 inch bolts. Attach the sign panels to vertical supports, ensuring that the span between vertical supports is a maximum of 18 feet. Do not use extruded sign panels with steel “U” or square tube post sign supports. Use the same material and color for trim molding that is used for the sign face. C. Legends and Borders. THE FIRST PARAGRAPH IN PART C IS CHANGED TO: The legend for each sign consists of letters, numerals, shields, and other symbols. Use Series E Modified 2000 lettering that conforms to the 2004 Edition of Standard Highway Signs and Markings Book. Ensure that the lettering HELEN AVE., LAWRENCE AVE., FLORENCE PL., AND LOWELL AVE., IMPROVEMENTS PROJECT Page 71 of 76

Page 302

is aligned, spaced, and sized according to 2004 Edition of Standard Highway Signs and Markings Book, its 2012 Supplement, and the working drawings. Apply the legend and borders using the following methods: 911.01.04 Acceptance Inspection THE FIRST PARAGRAPH IS CHANGED TO: Notify the ME at least 3 days before shipping to the Project so that arrangements for inspection can be made. The ME will reject signs not fabricated according to the 2004 Edition of Standard Highway Signs and Markings Book, its 2012 Supplement, and the Plans. The ME will ensure that finished signs are clear and legible without smudging, blisters, delamination, loose edges, or other blemishes. The ME will also ensure that the colors have a consistent chromaticity across all signs of the same color. 911.02 SIGN SUPPORTS 911.02.01 Steel “U” Post Sign Supports THE SUBPART IS RENAMED TO: 911.02.01 Steel “U”and Square Tube Post Sign Supports THE FOLLOWING IS ADDED AT THE END: Use steel “U” post sign supports conforming to ASTM A 499, Grade 50 or 60, with the length of post and minimum pounds per foot as shown on the Plans. Provide 18-8 stainless steel 5/16 × 18 UNC hexagonal headed bolts and nuts conforming to ASTM A 320, Grade B8, Class 1, for securing the signs to the steel “U” post. Provide sign mounting bolts that are sized to extend beyond the end of each nut by no more than 3/4 inches when fully tightened. Submit a certification of compliance, as specified in 106.07, for “U” posts. Use square steel tube post sign supports conforming to ASTM A 1011, Grade 50, with the length of post and minimum pounds per foot as shown on the Plans. Provide 18-8 stainless steel 5/16 × 18 UNC hexagonal headed bolts and nuts conforming to ASTM A 320, Grade B8, Class 1, for securing the signs to the square steel tube post. Provide sign mounting bolts that are sized to extend beyond the end of each nut by no more than 3/4 inches when fully tightened. Submit a certification of compliance, as specified in 106.07, for square steel tube posts. SECTION 912 – PAINTS, COATINGS, TRAFFIC STRIPES, AND TRAFFIC MARKINGS 912.01.04 Concrete Stain THE SUBSECTION IS CHANGED TO: Provide a penetrating stain that is a single component, water-based acrylic coating, alkali resistant, and water repellant. Primer is required for application on smooth concrete. Provide a primer that is a penetrating, water based, water

Page 302

single component, water-based acrylic coating, alkali resistant, and water repellant. Primer is required for application on smooth concrete. Provide a primer that is a penetrating, water based, water repellent concrete sealer. Ensure that the stain conforms to the requirements in Table 912.01.04-1. Table 912.01.04-1 Requirements for Concrete Stain Property Value ASTM Test Method Dry – to – Touch Time Max. 1 hour D 1640 Dry – to – Recoat Time Max. 4 hour D 1640 Weight per Gallon 11.0 + 0.5 lbs. D 1475 Weight Solids 52 + 2% D 2369 Adhesion, Tape Test Min. 4A D 3359 Gloss Flat D 523 Weathering <3.0 dE @ 3,000 hrs. G 154 / D 4587 VOC <100 g/L D 2369 HELEN AVE., LAWRENCE AVE., FLORENCE PL., AND LOWELL AVE., IMPROVEMENTS PROJECT Page 72 of 76

Page 303

912.04.02 Removable Pavement Marking Tape A. Temporary Pavement Tape. THE FOURTH PARAGRAPH IN PART A IS CHANGED TO: Provide a certification of compliance, as specified in 106.07, for temporary pavement tape. B. Removable Black Line Masking Tape. THE THIRD PARAGRAPH IN PART B IS CHANGED TO: Provide a certification of compliance, as specified in 106.07, for removable black masking tape. SECTION 917 – LANDSCAPING MATERIALS 917.07 SOD 917.08 PLANT MATERIALS H. Inspection. Notify the RE at least 48 hours in advance of delivery to the Project Limits for installation. HELEN AVE., LAWRENCE AVE., FLORENCE PL., AND LOWELL AVE., IMPROVEMENTS PROJECT Page 73 of 76