Supporting Documentation · Nov 10, 2026
303-26 Summary of AB Qty-OSPAC Site Improv. Signed.pdf
Preserved file SHA-256
a1e918220630e05c871456591568639421d84444b501d413e1159d8d6ba1b728Indexed text
SUMMARY OF AS-BUILT QUANTITIES SITE IMPROVEMENTS AT OSKAR SCHINDLER PERFORMING ARTS CENTER TOWNSHIP OF WEST ORANGE, ESSEX COUNTY DATE: 10/27/2028, wm — aval Satine cing, || wae | amma | aa | Hos a ee 22 locLuDes MOUNTED PREMIUM STADIUM CHALRS, 26° WIDE) is $58,000.00 ‘$58,000.00 ‘$88,000.00 SCALE EREEREEa 20 [ster cotta wieeTm W/ PUSH BUTTON ad 2 sismoi_| _£7-800.90 “ 50.00 Se ae a ee ee ee Prepared By: Zaybeth Carballo FE, PLS. “Tie: Dractertunpal Engnest
File revisions (1)
- Nov 7, 2026
a1e918220630424,399 bytes