the Department pursuant to N.J.A.C. 7:8E-5B. Compaction shall mean the increase in soil bulk density. Core shall mean a pedestrian-oriented area of commercial and civic uses serving the surrounding municipality, generally including housing and access to public transportation. County review agency shall mean an agency designated by the County Board of Chosen Freeholders to review municipal stormwater management plans and implementing ordinance(s). The County review agency may either be: A County planning agency; or A County water resource association created under N.J.S.A. 58:16A-55.5, if the ordinance or resolution delegates authority to approve, conditionally approve, or disapprove municipal stormwater management plans and implementing ordinances. Department shall mean the New Jersey Department of Environmental Protection. Designated Center shall mean a State Development and Redevelopment Plan Center as designated by the State Planning Commission such as urban, regional, town, village, or hamlet. Design engineer shall mean a person professionally qualified and duly licensed in New Jersey to perform engineering services that may include, but not necessarily be limited to, development of project requirements, creation and development of project design and preparation of drawings and specifications. 158
DRAFT PROPOSED REVISIONS – OCTOBER 2011 Development shall mean the division of a parcel of land into two (2) or more parcels, the construction, reconstruction, conversion, structural alteration, relocation or enlargement of any building or structure, any mining excavation or landfill, and any use or change in the use of any building or other structure, or land or extension of use of land, for which permission is required under the Municipal Land Use Law, N.J.S.A. 40:55D-1 et seq. In the case of development of agricultural lands, development means: any activity that requires a State permit; any activity reviewed by the County Agricultural Board (CAB) and the State Agricultural Development Committee (SADC), and municipal review of any activity not exempted by, the Right to Farm Act, N.J.S.A. 4:1C-1 et seq. Drainage area shall mean a geographic area within which stormwater, sediments, or dissolved materials drain to a particular receiving waterbody or to a particular point along a receiving waterbody. Environmentally constrained area shall mean the following areas where the physical alteration of the land is in some way restricted, either through regulation, easement, deed restriction or ownership such as: wetlands, floodplains, threatened and endangered species sites or designated habitats, and parks and preserves. Habitats of endangered or threatened species are identified using the Department's Landscape Project as approved by the Department's Endangered and Nongame Species Program. Environmentally critical areas shall mean an area or feature which is of significant environmental value, including, but not limited to: stream corridors; natural heritage priority sites; habitat of endangered or threatened species; large areas of contiguous open space or upland forest; steep slopes; and well head protection and groundwater recharge areas. Habitats of endangered or threatened species are identified using the Department's Landscape Project as approved by the Department's Endangered and Nongame Species Program. Empowerment Neighborhood shall mean a neighborhood designated by the Urban Coordinating Council "in consultation and conjunction with" the New Jersey Redevelopment Authority pursuant to N.J.S.A. 55:19-69. Erosion shall mean the detachment and movement of soil or rock fragments by water, wind, ice or gravity. Impervious surface shall mean a surface that has
pment Authority pursuant to N.J.S.A. 55:19-69. Erosion shall mean the detachment and movement of soil or rock fragments by water, wind, ice or gravity. Impervious surface shall mean a surface that has been covered with a layer of material so that it is highly resistant to infiltration by water. Infiltration shall mean the process by which water seeps into the soil from precipitation. Major development shall mean any development that provides for ultimately disturbing one (1) or more acres of land or increasing impervious surface by one-quarter (1/4) acre or more. Disturbance for the purpose of this rule is the placement of impervious surface or exposure and/or movement of soil or bedrock or clearing, cutting, or removing of vegetation. Projects undertaken by any government agency which otherwise meet the definition of "major development" but which do not require approval under the Municipal Land Use Law, N.J.S.A. 40:55D-1 et seq. are also considered "major development." Municipality shall mean any city, borough, town, township, or village. Node shall mean an area designated by the State Planning Commission concentrating facilities and activities which are not organized in a compact form. Nutrient shall mean a chemical element or compound, such as nitrogen or phosphorus, which is essential to and promotes the development of organisms. Person shall mean any individual, corporation, company, partnership, firm, association, or political subdivision of this State and any State, interstate or Federal agency. 159
DRAFT PROPOSED REVISIONS – OCTOBER 2011 Pollutant shall mean any dredged spoil, solid waste, incinerator residue, filter backwash, sewage, garbage, refuse, oil, grease, sewage sludge, munitions, chemical wastes, biological materials, medical wastes, radioactive substance (except those regulated under the Atomic Energy Act of 1954, as amended (42 U.S.C. 2011 et seq.)), thermal waste, wrecked or discarded equipment, rock, sand, cellar dirt, industrial, municipal, agricultural, and construction waste or runoff, or other residue discharged directly or indirectly to the land, groundwaters or surface waters of the State, or to a domestic treatment works. Pollutant shall mean and include both hazardous and nonhazardous pollutants. Recharge shall mean the amount of water from precipitation that infiltrates into the ground and is not evapotranspired. Sediment shall mean solid material, mineral or organic, that is in suspension, is being transported, or has been moved from its site of origin by air, water or gravity as a product of erosion. Site shall mean the lot or lots upon which a major development is to occur or has occurred. Soil shall mean all unconsolidated mineral and organic material of any origin. State Development and Redevelopment Plan Metropolitan Planning Area (PA1) shall mean an area delineated on the State Plan Policy Map and adopted by the State Planning Commission that is intended to be the focus for much of the State's future redevelopment and revitalization efforts. State Plan Policy Map is defined as the geographic application of the State Development and Redevelopment Plan's goals and statewide policies, and the official map of these goals and policies. Stormwater shall mean water resulting from precipitation (including rain and snow) that runs off the land's surface, is transmitted to the subsurface, or is captured by separate storm sewers or other sewage or drainage facilities. Stormwater runoff shall mean water flow on the surface of the ground or in storm sewers, resulting from precipitation. Stormwater management basin shall mean an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management basin may either be normally dry (that is, a detention basin or infiltration basin), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed
asin may either be normally dry (that is, a detention basin or infiltration basin), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands). Stormwater management measure shall mean any structural or nonstructural strategy, practice, technology, process, program, or other method intended to control or reduce stormwater runoff and associated pollutants, or to induce or control the infiltration or groundwater recharge of stormwater or to eliminate illicit or illegal non-stormwater discharges into stormwater conveyances. Tidal Flood Hazard Area shall mean a flood hazard area, which may be influenced by stormwater runoff from inland areas, but which is primarily caused by the Atlantic Ocean. Urban Coordinating Council Empowerment Neighborhood shall mean a neighborhood given priority access to State resources through the New Jersey Redevelopment Authority. Urban Enterprise Zones shall mean a zone designated by the New Jersey Enterprise Zone Authority pursuant to the New Jersey Urban Enterprise Zones Act, N.J.S.A. 52:27H-60 et seq. Urban Redevelopment Area is defined as previously developed portions of areas: 160
DRAFT PROPOSED REVISIONS – OCTOBER 2011 1. Delineated on the State Plan Policy Map (SPPM) as the Metropolitan Planning Area (PA1), Designated Centers, Cores or Nodes; 2. Designated as CAFRA Centers, Cores or Nodes; 3. Designated as Urban Enterprise Zones; and 4. Designated as Urban Coordinating Council Empowerment Neighborhoods. Waters of the State shall mean the ocean and its estuaries, all springs, streams, wetlands, and bodies of surface or groundwater, whether natural or artificial, within the boundaries of the State of New Jersey or subject to its jurisdiction. Wetlands or wetland shall mean an area that is inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support, and that under normal circumstances does support, a prevalence of vegetation typically adapted for life in saturated soil conditions, commonly known as hydrophytic vegetation. (Ord. No. 2063-06 § 2) 25-29.3 General Standards. a. Design and Performance Standards for Stormwater Management Measures. 1. Stormwater management measures for major development shall be developed to meet the erosion control, groundwater recharge, stormwater runoff quantity, and stormwater runoff quality standards in this section. To the maximum extent feasible, these standards shall be met by incorporating nonstructural stormwater management strategies into the design. If these strategies alone are not sufficient to meet these standards, structural stormwater management measures necessary to meet these standards shall be incorporated into the design. 2. The standards in this ordinance apply only to new major development and are intended to minimize the impact of stormwater runoff on water quality and water quantity in receiving water bodies and maintain groundwater recharge. The standards do not apply to new major development to the extent that alternative design and performance standards are applicable under a regional stormwater management plan or Water Quality Management Plan adopted in accordance with Department rules. Such alternative standards shall provide at least as much protection from stormwater-related
lan or Water Quality Management Plan adopted in accordance with Department rules. Such alternative standards shall provide at least as much protection from stormwater-related loss of groundwater recharge, stormwater quantity and water quality impacts of major development projects as would be provided under the standards in this section. 3. For site improvements regulated under the Residential Site Improvement Standards (RSIS) at N.J.A.C. 5:21, the RSIS shall apply in addition to this section except to the extent the RSIS are superseded by this section or alternative standards applicable under a regional stormwater management plan or Water Quality Management Plan adopted in accordance with Department rules. (Ord. No. 2063-06 § 3) 25-29.4 Stormwater Management Requirements for Major Development. a. The development shall incorporate a maintenance plan for the stormwater management measures incorporated into the design of a major development. b. Stormwater management measures shall avoid adverse impacts of concentrated flow on habitat for threatened and endangered species as documented in the Department's Landscape Project or Natural Heritage Database established under N.J.S.A. 13:1B-15.147 through 15.150, particularly Helonias bullata (swamp pink) and/or Clemmys muhlnebergi (bog turtle). 161
DRAFT PROPOSED REVISIONS – OCTOBER 2011 c. The following linear development projects are exempt from the groundwater recharge, stormwater runoff quantity, and stormwater runoff quality requirements at subsection 25- 29.4f. and g.: 1. The construction of an underground utility line provided that the disturbed areas are revegetated upon completion; 2. The construction of an aboveground utility line provided that the existing conditions are maintained to the maximum extent practicable; and 3. The construction of a public pedestrian access, such as a sidewalk or trail with a maximum width of fourteen (14) feet, provided that the access is made of permeable material. d. A waiver from strict compliance from the groundwater recharge, stormwater runoff quantity, and stormwater runoff quality requirements at subsection 25-29.4f. and g. may be obtained for the enlargement of an existing public roadway or railroad; or the construction or enlargement of a public pedestrian access, provided that the following conditions are met: 1. The applicant demonstrates that there is a public need for the project that cannot be accomplished by any other means; 2. The applicant demonstrates through an alternatives analysis, that through the use of nonstructural and structural stormwater management strategies and measures, the option selected complies with the requirements of subsections 25-29.4f. and g. to the maximum extent practicable; 3. The applicant demonstrates that, in order to meet the requirements at subsection 25- 29.4f. and g., existing structures currently in use, such as homes and buildings would need to be condemned; and 4. The applicant demonstrates that it does not own or have other rights to areas, including the potential to obtain through condemnation lands not falling under paragraph d,3. above within the upstream drainage area of the receiving stream, that would provide additional opportunities to mitigate for requirements of subsection 25-29.4f. and g. that were not achievable on-site. e. Nonstructural Stormwater Management Strategies. 1. To the maximum extent practicable, the standards in subsections 25-29.4f. and g. shall be
were not achievable on-site. e. Nonstructural Stormwater Management Strategies. 1. To the maximum extent practicable, the standards in subsections 25-29.4f. and g. shall be met by incorporating nonstructural stormwater management strategies at subsection 25-29.4e. into the design. The applicant shall identify the nonstructural measures incorporated into the design of the project. If the applicant contends that it is not feasible for engineering, environmental, or safety reasons to incorporate any nonstructural stormwater management measures identified in subsection 25-29.4e,2. below into the design of a particular project, the applicant shall identify the strategy considered and provide a basis for the contention. 2. Nonstructural stormwater management measures incorporated into site design shall: (a) Protect areas that provide water quality benefits or areas particularly susceptible to erosion and sediment loss; (b) Minimize impervious surfaces and break up or disconnect the flow of runoff over impervious surfaces; (c) Maximize the protection of natural drainage features and vegetation; (d) Minimize the decrease in the "time of concentration" from preconstruction to post- construction. "Time of concentration" is defined as the time it takes for runoff to 162
DRAFT PROPOSED REVISIONS – OCTOBER 2011 travel from the hydraulically most distant point of the watershed to the point of interest within a watershed; (e) Minimize land disturbance including clearing and grading; (f) Minimize soil compaction; (g) Provide low-maintenance landscaping that encourages retention and planting of native vegetation and minimizes the use of lawns, fertilizers and pesticides; (h) Provide vegetated open-channel conveyance systems discharging into and through stable vegetated areas; (i) Provide other source controls to prevent or minimize the use or exposure of pollutants at the site in order to prevent or minimize the release of those pollutants into stormwater runoff. These source controls include, but are not limited to: (1) Site design features that help to prevent accumulation of trash and debris in drainage systems; (2) Site design features that help to prevent discharge of trash and debris from drainage systems; (3) Site design features that help to prevent and/or contain spills or other harmful accumulations of pollutants at industrial or commercial developments; and (4) When establishing vegetation after land disturbance, applying fertilizer in accordance with the requirements established under the Soil Erosion and Sediment Control Act, N.J.S.A. 4:24-39 et seq., and implementing rules. 3. Any land area used as a nonstructural stormwater management measure to meet the performance standards in subsection 25-29.4f. and g. shall be dedicated to a government agency, subjected to a conservation restriction filed with the appropriate County Clerk's office, or subject to an approved equivalent restriction that ensures that measure or an equivalent stormwater management measure approved by the reviewing agency is maintained in perpetuity. 4. Guidance for nonstructural stormwater management measures is available in the New Jersey Stormwater Best Management Practices Manual. The manual is available on the