March 2022 New Jersey Department of Transportation Division of Local Aid and Economic Development Federal Aid Cost Reimbursement Agreement 5.2.6 If Subrecipient is not performing design work in-house, Subrecipient shall solicit proposals in accordance with Section 3.8 of this Agreement. Upon receipt of proposals from responsible design consultants, Subrecipient shall select professional services based upon qualifications and shall furnish the name of such consultant to the State for concurrence. Subrecipient agrees not to contract with any consultant to whom the State has made a reasonable and timely objection. 5.2.7 If the design consultant is to be retained for construction engineering purposes during the construction phase, contracts with design consultants shall include stipulations on retaining the designer for that purpose during which the negotiated cost of the construction engineering activity should be part of the construction contract. 5.2.8 Subrecipient or its consultant shall be required to submit a design schedule to the State which should include, at a minimum, the submission dates for Project plans and descriptions for NEPA determination, environmental screening, environmental permits/approvals, preliminary plans specifications, and estimate, and for the funding authorization request package. 5.2.9 Funds for design work shall be authorized by the State once the design authorization submission has been approved. Within ten years of the date of design authorization, the Project must be awarded to a construction contractor. Failure to comply with the requirements of this provision will result in the recovery of all funds previously expended. 5.2.10 Subrecipient agrees that all pedestrian facilities shall be designed to provide safe and easy accessibility for all users. These facilities shall comply with the Americans with Disabilities Act (ADA) of 1990, Section 504 of the Rehabilitation Act of 1973,28 C.F.R. § 35.151(e), and the current version of the NJDOT Roadway Design Manual in effect at the time this agreement is executed. 5.2.11 Subrecipient agrees that the monies requisitioned from the Project Fund will be used only to reimburse actual, eligible costs and for no other purpose. Subrecipient agrees that it shall provide to the State, upon demand and at no cost to the State, such documentation as will enable the State to determine
tual, eligible costs and for no other purpose. Subrecipient agrees that it shall provide to the State, upon demand and at no cost to the State, such documentation as will enable the State to determine that the proceeds of the Project Fund have been applied solely to Project Costs. 5.2.12 When the Subrecipient considers the design work to be finally complete, Subrecipient shall request that the State's representative make a final review of the plans, specifications and estimate. If it is determined, after such review, that the design work has been completed in accordance with all applicable laws and requirements, Subrecipient shall submit a final invoice to the State and the State shall disburse an amount equal to the approved final payment. Upon payment of the amount approved for final payment, the State shall be released from any further responsibility in connection with the Project Fund and the Project design work. 7
March 2022 5.3 New Jersey Department of Transportation Division of Local Aid and Economic Development Federal Aid Cost Reimbursement Agreement Construction Projects 5.3.1 Subrecipient shall complete or cause the completion of Project Work in accordance with the plans and specifications approved by the State. 5.3.2 Subrecipient covenants that Project Work will comply with all applicable laws and other requirements of federal, state and local governmental bodies. Subrecipient shall obtain all permits and licenses necessary to complete Project Work prior to federal authorization. 5.3.3 The Subrecipient shall not advertise the project until federal authorization for the Project is obtained and the State provides written authorization to proceed. 5.3.4 Subrecipient shall not proceed with any Project Work for which reimbursement shall be sought without the written authorization of the State. 5.3.5 Subrecipient shall solicit bids for the work in accordance with Section 3.8 of this Agreement. The Subrecipient shall advertise the project within sixty (60) days of the State’s authorization of funds and must award the project within six months of authorization of funds. Upon receipt of bids from responsible contractors, Subrecipient shall select the contractor submitting the lowest responsive bid. Within thirty (30) days of the award of the contract, the Subrecipient shall submit: 5.3.5.1 One copy of the summary of construction bids showing all bid quantities, unit prices, and amounts for the construction of pay items, and 5.3.5.2 A fully executed and sealed resolution awarding the contract to the lowest responsible bidder, which shall be subject to the approval of the State. 5.3.5.3 Once the State has received all of the information listed above, it shall notify Subrecipient in writing whether it has been approved. Subrecipient agrees not to contract with any contractor to whom the State has made a reasonable and timely objection. 5.3.6 Subrecipient shall submit to the State documentation of the consultant selection process or use of in-house forces and final negotiated consultant cost proposal. The use of in-house staff is permitted but is subject to the approval of the State. In order to use in-house staff for design work, Subrecipient must allow the State to review its project accounting systems and be cost-basis approved by the State. 5.3.7 If
he approval of the State. In order to use in-house staff for design work, Subrecipient must allow the State to review its project accounting systems and be cost-basis approved by the State. 5.3.7 If Subrecipient is not performing construction inspection work in-house, Subrecipient shall solicit proposals in accordance with section 3.8 of this Agreement. Upon receipt of proposals from responsible consultants, Subrecipient shall select professional services based upon qualifications and shall furnish the name of such consultant to the State for concurrence. Subrecipient agrees not to contract with any consultant to whom the State has made a reasonable and timely objection. 8
March 2022 New Jersey Department of Transportation Division of Local Aid and Economic Development Federal Aid Cost Reimbursement Agreement 5.3.8 Subrecipient agrees that the monies requisitioned from the Project Fund will be used only to reimburse actual, eligible Project Costs and for no other purpose. Subrecipient agrees that it shall provide to the State, upon demand and at no cost to the State, such documentation as will enable the State to determine that the proceeds of the Project Fund have been applied solely to Project Costs. 5.3.9 Upon written request of the State, the Subrecipient shall cause its contractor to provide payment and performance bonds in an amount equal to 100% of the cost of the Project Work. A surety company satisfactory to the State and qualified to do business in the State of New Jersey shall execute such bonds. Copies of all bonds shall be delivered to the State upon request. Only those sureties listed in the US Treasury Department Circular 570 and authorized to do business in the State shall furnish the surety bonds. Payment and performance bonds shall be part of the contract standard items. Performance and/or Payment bonds shall be billed to the State upon award of contract. 5.3.10 Subrecipient agrees that it will cause its contractor to comply with the FHWA’s Buy America policies that require a domestic manufacturing process for all steel or iron products that are permanently incorporated in a Federal-aid highway construction project pursuant to 23 U.S.C.A. § 313 and 23 C.F.R. § 635.410; comply with the current NJDOT Standard Roadway Specifications, and the current version of the NJDOT Construction Procedures Handbook. Buy America requirements apply to products installed permanently by utility companies for all contracts within the scope of the NEPA determination regardless of whether the contract uses FHWA funding. Subrecipient agrees that it shall cause its contractor to comply with Federal ADA requirements. All pedestrian facilities constructed or reconstructed shall provide safe and easy accessibility for all users. These facilities shall comply with the Americans with Disabilities Act (ADA) of 1990, Section 504 of the Rehabilitation Act of 1973 and 28 C.F.R. § 35.151(e) and the current version of the NJDOT Roadway Design Manual in effect at the time this agreement is executed. Failure to comply may result in the loss
habilitation Act of 1973 and 28 C.F.R. § 35.151(e) and the current version of the NJDOT Roadway Design Manual in effect at the time this agreement is executed. Failure to comply may result in the loss of projects funds. 5.3.11 The Subrecipient agrees that it will ensure its contractors are aware of and are in compliance with 31 U.S.C.A. § 1352 prior to execution of any agreement in order to remain eligible for Federal funds. 5.3.12 When Subrecipient considers the Project to be finally complete, Subrecipient shall request that the State's representative make a final inspection of the Project. If it is determined, after such inspection, that the Project has been completed in accordance with the plans and specifications, Subrecipient shall prepare and submit to the State a certification that the final inspection has been made and the cost of the Project has actually been incurred in accordance with the provisions of the Agreement. Upon receipt, the State shall disburse an amount equal to the approved final payment. Upon payment of the amount approved for final payment, the State shall be released from any further responsibility in connection with the Project Fund 9
March 2022 New Jersey Department of Transportation Division of Local Aid and Economic Development Federal Aid Cost Reimbursement Agreement and the Project. The State will monitor maintenance of completed Project by the Subrecipient. Failure to maintain Project will result in the withholding of funds payable to the Subrecipient on other State funded programs. 5.3.13 The Subrecipient must designate a person in Responsible Charge who is a full time employee of the agency as per 23 C.F.R. § 635.105. The person in "Responsible Charge" of LPA administered projects need not be an engineer. This requirement applies even when consultants are providing construction engineering services. This person may share duties, but is expected to be able to perform the following duties and functions: 5.3.13.1 Administers inherently governmental project activities, including those dealing with cost, time, adherence to contract requirements, construction quality and scope of Federal-aid projects; 5.3.13.2 Maintains familiarity of day to day project operations, including project safety issues; 5.3.13.3 Makes or participates in decisions about changed conditions or scope changes that require change orders or supplemental agreements; 5.3.13.4 Visits and reviews the Project on a frequency that is commensurate with the magnitude and complexity of the project; 5.3.13.5 Reviews financial processes, transactions and documentation to ensure that safeguards are in place to minimize fraud, waste, and abuse; and; 5.3.13.6 Directs Project staff, agency or consultant, to carry out Project Administration and Contract Oversight, including proper documentation. 5.3.13.7 Is aware of the qualifications, assignments and on-the-job performance of the agency and consultant staff at all stages of the Project. 5.3.14 In addition to adhering to the requirements specifically set forth in this Agreement, Subrecipient agrees that it will cause its contractor to comply with the United States Department of Transportation’s (USDOT)/FHWA’s official Disadvantaged Business Enterprises (DBE) Program Guidance, including that all contract bidders/offerors submit DBE subcontractor information and/or good faith efforts, either at the time of bid (responsiveness) or within 5 days of bid (responsibility). Guidance with regard to the DBE program can be found on the USDOT and FHWA Civil Rights’ websites. 10
March 2022 New Jersey Department of Transportation Division of Local Aid and Economic Development Federal Aid Cost Reimbursement Agreement 6. Insurance 6.1 Subrecipient shall maintain or cause to be maintained: 6.1.1 General Comprehensive Liability Insurance in the minimum amount of $1,000,000.00 combined single limit plus $1,000,000.00 in an umbrella policy. This insurance shall specifically provide for coverage of the State as an additional insured and shall provide for coverage at least as broad as the standard, basic unamended commercial general liability policy and shall be endorsed to include broad form contractual liability coverage, independent contractor’s coverage and completed operations coverage. 6.1.2 Automobile Liability Insurance in the minimum amount of $1,000,000.00. 6.1.3 Workers Compensation Insurance in the amount required by law. 6.2 A copy of each insurance policy shall be made available to the State upon request. 6.3 Subrecipient shall cause to be maintained Errors and Omissions, Professional Liability Insurance and/or Professional Malpractice Insurance sufficient to protect against liabilities arising out of professional obligations performed pursuant to the requirements of this Agreement. This insurance shall be in the minimum amount of $1,000,000.00 6.4 Subrecipient expressly understands and agrees that any insurance protection required by this Agreement shall in no way limit the obligations assumed by Subrecipient pursuant to this Agreement and shall not be construed to relieve Subrecipient of liability in excess of such coverage, nor shall it preclude the State from taking such other actions as are available to it under any other provision of this Agreement or otherwise in law. 7. Disbursement of Project Fund 7.1 It is agreed that any and all Project Costs incurred by the Subrecipient prior to the execution of this Agreement by all parties shall be non-participating by the State and FHWA. 7.2 The State shall disburse monies from the Project Fund to Subrecipient in order to reimburse actual, eligible costs associated with Project Work in accordance with the terms and conditions of this Agreement. Only those costs specifically enumerated in the Project Scope of Work and Cost Estimate. Nothing contained herein shall impose upon the State any obligation to ensure the proper application of the monies paid to
costs specifically enumerated in the Project Scope of Work and Cost Estimate. Nothing contained herein shall impose upon the State any obligation to ensure the proper application of the monies paid to Subrecipient from the Project Fund. Furthermore, nothing contained herein shall impose any obligation upon the State to pay to Subrecipient any monies in excess of the Project Fund. The Subrecipient shall reimburse its consultants/contractors for allowable expenses after the receipt of properly prepared payment vouchers as outlined in Section 7.5 of this Agreement. All monies shall be subject to appropriations and availability of funds. 7.3 The Agreement may be adjusted and/or modified unilaterally by the State to reflect the Project Costs in accordance with 23 C.F.R. § 630.106. 11
March 2022 New Jersey Department of Transportation Division of Local Aid and Economic Development Federal Aid Cost Reimbursement Agreement 7.4 The final eligible costs incurred by the Subrecipient during the Project may be reimbursed by the State, subject to prior written approval, the availability of funds, and at the State’s sole discretion. 7.5 Payment Vouchers 7.5.1 Subrecipient shall prepare and submit payment vouchers for payment for approval by the State within three (3) months of initial billing by the contractor or design consultant, or six (6) months from award, whichever is first. Payment vouchers may be submitted as frequently as every month at most but are required at least quarterly. 7.5.2 If Subrecipient does not comply with the aforementioned time periods for submitting payment vouchers, the State may determine that the Project is deemed “inactive” and, as a result, Project funds may be withdrawn by the State. The Project may also be determined inactive, at the discretion of the State, for the following reasons: failure to provide billing for eligible costs within 12 months from the initial authorization or a preceding bill, the failure to perform work properly, failure to complete the project as proposed, failure to properly submit or complete the close out documents, or any reason that the State may determine based upon the Project status and remaining work to be performed. The payment vouchers shall state, with proper documentation, the amounts due to the Subrecipient for actual, eligible costs incurred in connection with the Project. The Subrecipient shall maintain a complete set of time sheets, records and accounts to identify eligible salaries, fringe benefits, leave, and non-salary direct expenses incurred in support of the Project, as well as material records, certifications, and as-built quantities. 7.5.3 The parties agree that the State has sole discretion to modify the initial Agreement amount to reflect the actual, eligible costs for the Project work at the time of the award concurrence. 7.5.4 Progress Reports will accompany all payment vouchers and shall include: 7.5.4.1 A narrative description of work performed during the payment period and any difficulties or delays encountered; 7.5.4.2 A comparison of actual accomplishments to the goals established for the payment period; 7.5.4.3 A comparison, by tasks, of costs