Town CrierWest Orange, New Jersey
← Back to search

Packet · Aug 12, 2025

Township Council Meeting — Packet

Preserved file SHA-256ab06171459d2cd160ed919fd4dd626e257a99dc08cc34aa6ee41212bb73ddee7

Indexed text

Page 427

of negligence or willful misconduct in connection with the services and such negligence or willful misconduct was the sole cause of the damages, claims and liabilities. Client agrees to indemnify and hold harmless Engineer from and against all claims, damages, losses and expenses, direct or indirect, and consequential damages, including but not limited to fees and charges of attorneys and court and arbitration costs, brought by any person or entity, or claims against Engineer which arise out of, are related to, or are based upon, the actual or threatened dispersal, discharge, escape, release or saturation or smoke, vapors, soot, fumes, acids, alkalis, toxic chemical, radioactive materials, liquids, gases or any other material, upon, in or into the surface or subsurface soil; water or watercourse; objects; or any tangible or intangible matter. To the fullest extent permitted by law, such indemnification shall apply regardless of the fault, negligence, breach of warranty or contract or strict liability of Engineer. This indemnification shall not apply to claims, damages, losses or expenses which are determined by a court of competent jurisdiction to be the sole result of negligence or willful misconduct by the Engineer of obligations under this Agreement. Limitations of Liability - CME's total liability to Client for any and all injuries, claims, losses, expenses or damages whatsoever arising out of, or in any way related to, this Agreement from any cause or causes, including but not limited to CME's negligence, errors, omissions, strict liability, breach of contract or breach of warranty, shall not exceed the total contract amount for the services provided by CME or $50,000, whichever is less. In no event shall CME be liable for consequential damages, including, without limitation, loss of use or loss of profits, incurred by Client or their subsidiaries or successors, regardless of whether such claim is based upon alleged breach of contract, willful misconduct, or negligent act or omission. Professional services rendered for a Client shall be provided for that Client. The Client is responsible for the proper operation and use of the subject facilities and/or report and nothing herein shall provide any rights to any third party. The Client, in authorizing CME to proceed, acknowledges that the professional responsibility is limited. Termination - This

Page 427

nd/or report and nothing herein shall provide any rights to any third party. The Client, in authorizing CME to proceed, acknowledges that the professional responsibility is limited. Termination - This Agreement may be terminated by either party upon fourteen (14) days written notice in the event of substantial failure by the other party to perform in accordance with the terms hereof. Such termination shall not be effective if that substantial failure has been remedied before expiration of the period specified in the written notice. In the event of termination, CME shall be paid for services performed to the termination notice date plus reasonable termination expenses. In the event of termination, or suspension for more than three (3) months, prior to completion of all work contemplated by this Agreement, CME may complete such analyses and records as are necessary to complete its files and may also complete a report on the services performed to the date of notice of termination or suspension. The expenses of termination or suspension shall include all direct costs of CME in completing such analyses, records and reports. Assigns - The Client may not delegate, assign, sublet or transfer his duties or interests in this Agreement without the written consent of CME. This agreement shall not create any rights or benefits to parties other than the Client and CME, except such other rights as may be specifically called for herein. MU25N.doc

Page 428

Barnegat • Berlin • Camden • Howell • Medford • Monmouth Junction • Parlin WWW.CMEUSA1.COM

Page 429

EXHIBIT B

Page 430

MUNICIPAL ENGINEERING SERVICES GENERAL CONDITIONS AND HOURLY RATE SCHEDULE TO JANUARY 1, 2026 Program Manager........................................................................................................ $214.00 Per Hour Project Manager .......................................................................................................... $213.00 Per Hour Senior Professional Engineer/Project Leader.............................................................. $212.00 Per Hour Professional Engineer, Environmental ........................................................................ $209.00 Per Hour Assoc. Professional Engineer, Environmental............................................................. $208.00 Per Hour Professional Engineer ................................................................................................. $209.00 Per Hour Project Engineer, Environmental ................................................................................. $207.00 Per Hour Associate Professional Engineer ................................................................................. $208.00 Per Hour Project Engineer/Senior Designer II ............................................................................ $207.00 Per Hour Engineer/Senior Designer ........................................................................................... $200.00 Per Hour Associate Engineer/Designer ...................................................................................... $195.00 Per Hour Engineer, Environmental ............................................................................................. $200.00 Per Hour Associate Engineer, Environmental............................................................................. $195.00 Per Hour Senior Scientist............................................................................................................ $215.00 Per Hour Lead Scientist/Senior Geologist .................................................................................. $203.00 Per Hour Scientist/Project Geologist........................................................................................... $180.00 Per Hour Associate Scientist/Staff Geologist .............................................................................. $165.00 Per Hour Environmental Technician

Page 430

.......................... $180.00 Per Hour Associate Scientist/Staff Geologist .............................................................................. $165.00 Per Hour Environmental Technician ........................................................................................... $147.00 Per Hour Professional Surveyor ................................................................................................. $203.00 Per Hour Survey Manager .......................................................................................................... $183.00 Per Hour Party Chief ................................................................................................................... $163.00 Per Hour Robotic Total Station ................................................................................................... $ 84.00 Per Hour Survey Technician ....................................................................................................... $143.00 Per Hour Chief Construction Manager ........................................................................................ $207.00 Per Hour Construction Manager ................................................................................................. $181.00 Per Hour Senior Construction Technician................................................................................... $180.00 Per Hour Construction Technician .............................................................................................. $150.00 Per Hour Associate Construction Technician ............................................................................. $143.00 Per Hour Support Staff................................................................................................................ $117.00 Per Hour Drone Pilot ................................................................................................................... $159.00 Per Hour Drone Technician ........................................................................................................ $ 86.00 Per Hour CAD Technician........................................................................................................... $166.00 Per Hour Senior Landscape Architect......................................................................................... $205.00 Per Hour Landscape Architect

Page 430

.............................. $166.00 Per Hour Senior Landscape Architect......................................................................................... $205.00 Per Hour Landscape Architect .................................................................................................... $185.00 Per Hour Certified Tree Expert ................................................................................................... $167.00 Per Hour Associate Landscape Designer ................................................................................... $149.00 Per Hour Principal Planner ......................................................................................................... $212.00 Per Hour Professional Planner ................................................................................................... $211.00 Per Hour Senior Planner ............................................................................................................. $192.00 Per Hour Planner ........................................................................................................................ $188.00 Per Hour Senior Leadership ....................................................................................................... $214.00 Per Hour Executive Leadership .................................................................................................. $225.00 Per Hour Executive Leadership, Environmental ......................................................................... $229.00 Per Hour Managing Partner ........................................................................................................ $242.00 Per Hour MU25N.doc

Page 431

2932-25 AN ORDINANCE AMENDING AND SUPPLEMENTING CHAPTER 7, TRAFFIC, SUBSECTION 7-7.3, TEMPORARY PARKING PROHIBITION FOR SNOW PLOWING AND REMOVAL, SUBSECTION 7-12, PARKING PROHIBITED FOR STREET CLEANING AND MAINTENANCE, SUBSECTION 7-14.1c, NIGHT PARKING RESTRICTED, AND SUBSECTION 7-14.7 ALTERNATE SIDE PARKING, OF THE REVISED GENERAL ORDINANCES OF THE TOWNSHIP OF WEST ORANGE BE IT ORDAINED, by the Township Council of the Township of West Orange, in the County of Essex, State of New Jersey as follows: Section 1. Subsection 7-7.3, Temporary Parking Prohibition For Snow Plowing and Removal, of the Township of West Orange is hereby supplemented and amended as follows: (italic type denotes deletion, bold type denotes addition): Name of Street Sides Days Longview Street West All From Randolph Place to a point 35 feet south of the southerly curb line of Lindsley Avenue extended. Longview Street West All Entire Length Lindsley Avenue South All From Longview Street to Brennan Drive. Section 2. Location Subsection 7-12, Parking Prohibited for Street Cleaning and Maintenance, of the Township of West Orange is hereby supplemented and amended as follows: (italic type denotes deletion, bold type denotes addition): Name of Street Side Hours and Days Location Longview Street East Thursday 9 AM to 12 Noon From Randolph Place to a point 35 feet south of the southerly curb line of Lindsley Avenue. Longview Street West Tuesday 9 AM to 12 Noon From Randolph Place to a point 125 feet south of the southerly curb line of Lindsley Avenue extended. Longview Street East Thursday 9 AM to 12 Noon Entire Length. Longview Street West Tuesday 9 AM to 12 Noon Entire Length. Lindsley Avenue South Thursday 9 AM to 12 Noon Entire Length.

Page 432

Lindsley Avenue North Tuesday 9 AM to 12 Noon Entire Length. Section 3. Subsection 7-14.1c, Night Parking Restricted, of the Township of West Orange is hereby supplemented and amended as follows: (italic type denotes deletion, bold type denotes addition): Exceptions: Name of Street Sides Longview Street Both From Randolph Place to a point 35 feet south of the southerly curb line of Lindsley Avenue. Longview Street Both Entire Length Lindsley Avenue Both From Longview Street to Brennan Drive. Section 4. Location Subsection 7-14.7 Alternate Side Parking, of the Revised General Ordinances of the Township of West Orange is hereby supplemented and amended as follows (italic type denotes deletion, bold type denotes addition): Name of Street Column A Column B Longview Street North South From Randolph Place to a point 35 feet south of the southerly curb line of Lindsley Avenue. Lindsley Avenue North South From Longview Street to Brennan Drive Section 5. Location If any provisions of this Ordinance or application thereof, under any circumstances, is held invalid, the invalidity shall not affect any of the provisions or applications of this Ordinance that can be given effect without the valid provision(s) or application and to this end, the provisions of this Ordinance are severable. Section 6. All other Ordinances or parts of Ordinances inconsistent with this Ordinance are hereby repealed. Section 7. accordance with law. This Ordinance shall take effect upon final passage and publication in

Page 433

SUSAN MCCARTNEY, MAYOR JOE KRAKOVIAK, COUNCIL PRESIDENT KAREN J. CARNEVALE, R.M.C. TOWNSHIP CLERK INTRODUCED: July 22, 2025 ADOPTED: August 12, 2025

File revisions (1)