c Conditions A. We will, at no additional cost, revise and resubmit documents where an error on our behalf has been identified during the approval process. However, French & Parrello Associates, P.A., will not be held responsible for work that may result from comments, reviews, and requirements imposed by any regulatory agency. B. The above proposal does not include within the quoted prices the following items are specifically excluded: 1. Project Design and Plans. 2. NJDEP permitting, not specifically stated herein. 3. Surveying 4. There is no guarantee that FPA will meet the 2026 deadlines. However, FPA will work with NJDEP and the town to address MS4 Tier A mapping deadlines. 5. Any work not specifically stated herein. Township of West Orange October 30, 2025 | Page 7

Page 279

HB Section 2 Cost Proposal FPA

Page 280

MS4 Mapping Section 2 | Cost Proposal Task 1: MS4 Infrastructure Mapping – Completion of MS4 Stormwater Inventory .........................$134,100.00 Task 2: Establishment of a Township GIS System ...............................................................................$27,220.00 Task 3: Watershed Improvement Plan(Phase I – Phase III) ...............................................................$137,130.00 Watershed Inventory Reports (Phase I) ..........................................................................$42,790.00 Watershed Assessment Report (Phase II)........................................................................$44,070.00 Watershed Assessment Report (Phase III).......................................................................$50,270.00 Task 4: Routine Inlet and Outfall Inspections.......................................................................................$40,210.00 Total Lump Sum ..........................................................................................................................$338,660.00 Township of West Orange October 30, 2025 | Page 1

Page 281

BH Section 3 Project Experience FPA

Page 282

Project Profile Allamuchy Township MS4 Mapping Allamuchy Township, New Jersey In accordance with the New Jersey Department of Environmental Protection (NJDEP) New Jersey Pollution Discharge Elimination System (NJPDES) MS4 Tier A permit requirements, the maintenance and upkeep of stormwater management features is required. In order to comply with the MS4 permit requirements, an inventory of municipal stormwater systems must be completed. French & Parrello Associates (FPA) was retained and tasked with completing the inventory in compliance with NJDEP requirements which includes the locating and mapping of outfalls, ground water discharge points, interconnections, inlets, stormwater manholes, stormwater conveyance systems, pump stations, and other stormwater facilities. Utilizing ArcGIS Field maps in conjunction with web mapping applications deployed in ArcGIS Enterprise, 2.29 miles of conveyance, 135 inlets, 1 outfalls, 7 manholes, 26 groundwater discharge points, 5 stormwater basins, and 29 culverts were mapped for Allamuchy Township. Client Allamuchy Township Reference Rosemary Tuohy Mayor 201.424.2329 mayor@allamuchynj.org Services NJDEP MS4 Compliant Mapping GPS Data Collection Field Data Collection Inspection Services Web Mapping Application Development Asset Management

Page 283

Project Profile Carteret MS4 Mapping Carteret, New Jersey French & Parrello Associates (FPA) was retained by the Borough of Carteret to help meet the New Jersey Department of Environmental Protection (NJDEP) New Jersey Pollution Discharge Elimination System (NJPDES) MS4 Tier A permit requirements. To ensure compliance, the MS4 permit mandates a comprehensive asset inventory of the municipal stormwater system. FPA was tasked with creating this inventory, covering the location and mapping of critical stormwater infrastructure such as outfalls, groundwater discharge points, interconnections, inlets, stormwater manholes, conveyance systems, pump stations, and other facilities. Client Working with an existing stormwater inventory provided by the Borough, FPA employed ArcGIS Field Maps alongside web mapping applications deployed within ArcGIS Enterprise. Through this technology, FPA mapped 39 miles of conveyance, 1,413 inlets, 20 outfalls, 16 groundwater discharge points, 7 stormwater basins, 8 culverts, and 608 manholes. This detailed mapping effort is a vital step towards the Borough of Carteret’s compliance with the MS4 permit requirements. Services Borough of Carteret Reference John P. DuPont, PE, CME, PP Director of Municipal Engineering 732.541.3847 dupontj@carteret.net NJDEP MS4 Compliant Mapping GPS Data Collection Field Data Collection Inspection Services Web Mapping Application Development Asset Management

Page 284

Project Profile Chester Township MS4 Mapping Chester Townsip, New Jersey In accordance with the New Jersey Department of Environmental Protection (NJDEP) New Jersey Pollution Discharge Elimination System (NJPDES) MS4 Tier A permit requirements, the maintenance and upkeep of stormwater management features is required. In order to comply with the MS4 permit requirements, an inventory of municipal stormwater systems must be completed. French & Parrello Associates (FPA) was retained and tasked with completing the inventory in compliance with NJDEP requirements which includes the locating and mapping of outfalls, ground water discharge points, interconnections, inlets, stormwater manholes, stormwater conveyance systems, pump stations, and other stormwater facilities. Utilizing ArcGIS Field maps in conjunction with web mapping applications deployed in ArcGIS Enterprise, 32.94 miles of conveyance, 1,491 inlets, 28 outfalls, 42 manholes, 210 groundwater discharge points, 5 stormwater basins, and 76 culverts were mapped for Chester Township. Client Chester Township Reference Robin Collins Clerk/Administrator 908.879.5100 ext 810 Services NJDEP MS4 Compliant Mapping GPS Data Collection Field Data Collection Inspection Services Web Mapping Application Development Asset Management

Page 285

Project Profile Hardwick Township MS4 Mapping Hardwick Township, New Jersey In accordance with the New Jersey Department of Environmental Protection (NJDEP) New Jersey Pollution Discharge Elimination System (NJPDES) MS4 Tier A permit requirements, the maintenance and upkeep of stormwater management features is required. In order to comply with the MS4 permit requirements, an inventory of municipal stormwater systems must be completed. French & Parrello (FPA) was retained and tasked with completing the inventory in compliance with NJDEP requirements which includes the locating and mapping of outfalls, ground water discharge points, interconnections, inlets, stormwater manholes, stormwater conveyance systems, pump stations, and other stormwater facilities. Utilizing ArcGIS Field maps in conjunction with web mapping applications deployed in ArcGIS Enterprise, 4.87 miles of conveyance, 197 inlets, 19 outfalls, 3 manholes, 107 groundwater discharge points, 1 stormwater basin, and 163 culverts were mapped for Hardwick Township. Client Hardwick Township Reference Kristin Shipps MC Municipal Clerk Hardwick & Blairstown 908.362.6528 Services NJDEP MS4 Compliant Mapping GPS Data Collection Field Data Collection Inspection Services Web Mapping Application Development Asset Management

Page 286

Project Profile Hope Township – Tier A Stormwater Compliance Hope Township, Warren County, New Jersey French & Parrello Associates (FPA) was retained by Hope Township to advance their stormwater management from a Tier B to the Tier A stormwater permit requirements. Our services included: • • • • • • • • • Updating the Town’s Stormwater Pollution Prevention Plan Inspection & Maintenance Mapping Annual Employee Training Mapping of Recorded Private Storm Facilities Stormwater Ordinance Guidance Local Public Outreach Material Updating the Municipal Stormwater Management Plan Stormwater System Mapping Watershed Improvement Plan (Phase 1) FPA has successfully GIS mapped the town’s stormwater system, ensuring all components are in place for the Watershed Improvement Plan. Utilizing NJDEP’s latest template, we have updated the Town’s SPPP to meet all Tier A requirements. FPA provided a tailored employee training to DPW operations and requirements for stormwater system, ensuring that they received all relevant information to their town. FPA created several maps including, Inspection and Maintenance scheduling maps for inlets and outfalls, and a street sweeping map showing the frequency of how often the roads should be swept per the minimum requirements of Tier A. Additionally, FPA has provided local public outreach material to assist with reaching Public Outreach Education requirements. Client Township of Hope Reference Don Whitmore Director of DPW 908.459.4303 Services Stormwater Management GIS Mapping Municipal Engineering

Page 287

Project Profile Knowlton Township MS4 Mapping Knowlton Township, New Jersey In accordance with the New Jersey Department of Environmental Protection (NJDEP) New Jersey Pollution Discharge Elimination System (NJPDES) MS4 Tier A permit requirements, the maintenance and upkeep of stormwater management features is required. In order to comply with the MS4 permit requirements, an inventory of municipal stormwater systems must be completed. French & Parrello Associates (FPA) was retained and tasked with completing the inventory in compliance with NJDEP requirements which includes the locating and mapping of outfalls, ground water discharge points, interconnections, inlets, stormwater manholes, stormwater conveyance systems, pump stations, and other stormwater facilities. Utilizing ArcGIS Field maps in conjunction with web mapping applications deployed in ArcGIS Enterprise, 7.43 miles of conveyance, 386 inlets, 16 outfalls, 4 manholes, 172 groundwater discharge points, 5 stormwater basins, and 147 culverts were mapped for Knowlton Township. Client Knowlton Township Reference Brian J. Peck Public Works Manager/CPWM 908.496.4265 Services NJDEP MS4 Compliant Mapping GPS Data Collection Field Data Collection Inspection Services Web Mapping Application Development Asset Management