Packet · Nov 24, 2025
Township Council Meeting — Packet
61a270d401e5ebef2ab5c8bf5571d44088d531804eb623be28d533fabba3a6d4Indexed text
with this Chapter. TREE REMOVAL AND REPLACEMENT APPLICATION- A form completed by the Applicant provided by the Township which shall be submitted to the Township Forester in accordance with Chapter XXX,§ 5. 5
5/22/24-Accepting Changes from 5/7/24 Meeting and Incorporating Amendments from 5/21/24 Council Meeting TREE REMOVAL AND REPLACEMENT PERMIT-A permit issued by the Township Forester to an Applicant who complies with all tree removal and replacement procedures set forth in this Chapter. TREE REPLACEMENT FUND-A dedicated fund established pursuant to this chapter. The purpose of the fund is to permit t applicant who removes any tree and demonstrates lack of feasibility in replanting replacement trees on-site the ability to contribute to the Fund. The amount of the fee that the applicant shall contribute must be made in accordance with the provisions of this chapter; specifically, Chapter 28§ 8. VIABLE TREE- a “viable tree” is implicitly a living tree that is in fair or better condition and has a reasonable anticipated life span of ten (10) years or more. VOLCANO MULCHING-Piling mulch against the trunk of a tree in the shape of a volcano causing tree roots to circle the trunk and subsequently weaken the tree. Thus, the tree root flare, which is the connection with the trunk root and the surface of the ground, shall remain visible at all times. §28-4: Tree Removal and Replacement Permits a. No person shall be granted permission to remove more than two (2) v i a b l e trees within a twenty-four (24) month period, however, if a person desires to improve their property by removing more than two (2) viable trees within twenty-four (24) months, the applicant shall provide an application to the appropriate department along with a tree removal and replacement application. No person shall cut, remove, or engage in activities that encroach upon the health of a tree or remove a tree with a DBH of four two-and-a-half (4) inches or greater without first having been issued a Tree Removal and Replacement Permit from the Township. To obtain a permit, the Applicant must comply with the procedures set forth in Chapter 28, § 5 and any replacement procedures in§ 8. Deleted: pennit Commented [PS9]: REPLACE WITH: THE Commented [PS10]: REPLACE WITH: ANY Deleted: pennit Deleted: any Deleted: anya viable tree Commented [PS11]: REPLACE WITH: CONTRIBUTE Deleted: pay a fee Deleted: specifically Deleted: Replacement Permits Commented [PS12]: ADD: VIABLE Deleted: pennission Commented [PS13]: ADD: VIABLE Deleted: depatiment Commented [PS14]: REPLACE WITH: OF FOUR-INCHES Deleted: " Deleted:
lly Deleted: Replacement Permits Commented [PS12]: ADD: VIABLE Deleted: pennission Commented [PS13]: ADD: VIABLE Deleted: depatiment Commented [PS14]: REPLACE WITH: OF FOUR-INCHES Deleted: " Deleted: Penn.it 1. If any tree(s) sought to be taken down that are delineated by the Township Forester as viable or non-viable, the person seeking removal or who has removed tree(s) must comply with the tree replacement provisions set forth in Chapter 28§ 8 and the Chart at Table "A;" unless the tree(s) removed are replanted on the Lot where the tree removal occurred. 2. All Tree Removal and Replacement Permits issued for viable trees shall be posted on the tree(s) to be removed and, if no structure exists, in the property owner's front door/window, so the tree removal permit is visible to any member of the public not less than seven (7) business days prior to removal. Permits for non-viable trees must be posted in a front-facing window or door for a period of 7 days but are not required to be placed prior to removal. 3. For non-development applications, the Township Forester shall decide to grant Commented [PS15]: FOR VIABLE TREES Commented [PS16]: ADD: IF NO STRUCTURE EXISTS, Deleted: Commented [PS17]: ADD: PERMITS FOR NON-VIABLE TREES MUST BE POSTED IN A FRONT-FACING WINDOW OR DOOR FOR A PERIOD OF 7 DAYS BUT ARE NOT REQUIRED TO BE PLACED PRIOR TO REMOVAL.
or deny a Tree Removal and Replacement Permit Application within 30 days of submission and shall notify the applicant and any objectors who have contacted the Township Forester. Application(s) made in connection with a development 6
11-24-2025 Ordinance on First Reading Deleted: 5/22/24-Accepting Changes from 5/7/24 Meeting and Incorporating Amendments from¶ 5/21/24 Council Meeting… application shall comply with the procedures set forth in Chapter 28 § 4(e) and shall be adjudicated by the Land Use Board. If the application is granted, the permit shall be issued by the Township Forester. Formatted: Font: Not Bold 4. Permits granted under this section shall run with the land and shall remain in force and effect for 12 months from the date of issuance. Any permit not acted upon within a period of 12 months after issuance shall become null and void. Deleted: pennit Formatted: Centered, Indent: Left: 0.06", Right: 0.33", Space Before: 2.9 pt b. Prohibitions. Notwithstanding Subsection (a) above, no person shall do any of the following: 1. Cut down or remove any viable tree within wetlands, flood hazard areas, riparian zones, or other areas protected by state or federal law or applicable EPA or NJDEP regulations; 2. Cut down or remove any viable tree within a conservation easement; 3. Engage in activities which could cause a tree to die, including but not limited to topping, grade cut or fill, soil compaction within the drip line, chemical contamination, excessive alterations to established drainage patters or mechanical damage. 4. Cut down or remove any viable tree on a slope with a grade of 10% or greater on a slope where vegetation is presently stabilizing soils. 5. Cut down or remove any viable tree unless it is performed by a tree contractor that is Qualified Tree Expert and who shall be registered with the Township of West Orange pursuant to § 527.1 et seq. Commented [PS18]: TREE CONTRACTOR THAT IS 6. Perform street, curb and sidewalk construction or repairs unless utilizing methods that protect the roots and trunk of a tree, such as manual excavation, reducing the curb, curving sidewalks around a tree, and modifying driveway aprons to accommodate trees as directed by the Township Forester or Township Engineer. 7. Remove viable trees within one hundred (100) feet of a ridgeline. 8. Remove viable trees which will impair the growth and development of the remaining trees on the applicant's Lot or on adjacent Lots. Commented [PS19]: ADD: VIABLE 9. Remove v i ab l e trees if tree removal will negatively alter existing drainage patterns and stormwater runoff. Commented [PS20]:
plicant's Lot or on adjacent Lots. Commented [PS19]: ADD: VIABLE 9. Remove v i ab l e trees if tree removal will negatively alter existing drainage patterns and stormwater runoff. Commented [PS20]: ADD: VIABLE 10. Remove viable trees if it will result in soil erosion. Commented [PS21]: ADD: ANY Deleted: tree
11-24-2025 Ordinance on First Reading 11. Remove trees if it would increase the amount of stormwater runoff and/or negatively affect stormwater runoff patterns on any Lot(s), whether contiguous or not. Deleted: 5/22/24-Accepting Changes from 5/7/24 Meeting and Incorporating Amendments from¶ 5/21124 Council Meeting… Formatted: Font: Not Bold Formatted: Space Before: 3.65 pt 12. Remove viable trees if it would constitute a significant change in the screening between existing or proposed structures on roads and/or adjacent Lots. Commented [PS22]: VIABLE TREES 13. Remove trees where it would alter topography of the area where such tree(s) are located and will create conditions which may be injurious to the trees or other trees located nearby. Deleted: topography of 14. Remove trees where it will impair suitable habitats and migratory zones for endangered or threatened species animals. 15. Engage in activities that cause harm to the health of the tree, including but not limited to, volcano mulching, cutting off light, water, or air, and/or fail to treat or remove invasive vines or the invasive Tree of Heaven which harbors Japanese Spotted Lantern Flies which cause harm to native species of trees. 16. Prior to the removal of any viable and/or non-viable tree within an environmentally sensitive area such as cliffsides, wetlands, steep slopes and not limited to those described in 1-15 above, Applicant is required to conduct the studies to determine the risks and mitigation measures for potential erosion at its own expense. These studies must be conducted by a New Jersey Licensed Professional Engineer to guide the Township and/or its representative in making informed and sound decisions. The Applicant will be required to set up an escrow account which fee will be set by resolution for the Township’s Professionals to review. The type of studies required are: 1. Ecological Survey-to assess threatened or endangered species, habitats and overall biodiversity in environmentally sensitive areas. 2. Geotechnical Report-to assess the stability and surface and subsurface properties of the ground to determine the consequences associated with the removal of trees in environmentally sensitive areas. 3. Hydrological Report-to assess the movement and management of water associated with the impact of removing trees in environmentally sensitive areas. 17. If a permit is
vironmentally sensitive areas. 3. Hydrological Report-to assess the movement and management of water associated with the impact of removing trees in environmentally sensitive areas. 17. If a permit is approved pursuant to Subsection 16 above, prior to the issuance of a permit, Applicant must provide a plan from the New Jersey Licensed Professional Engineer for the short- and long-term monitoring of environmentally sensitive areas such as cliffsides and steep slopes for stability. Where tree removal is required on slopes greater than ten (10) percent, a plan for short- and long-term monitoring must be prepared by a New Jersey Licensed Professional Engineer pursuant to the Township’s Steep Slope and Natural Features Ordinance at Chapter 25 § 28 et seq. Commented [PS23]: TREAT OR REMOVE PER Township Forester’s recommendation, Commented [PS24]: ADD: 16. Prior to the removal of any viable and/or non-viable tree within an environmentally sensitive area such as cliffsides, wetlands, steep slopes and not limited to those described in 1-15 above, Applicant is required to conduct the studies to determine the risks and mitigation measures for potential erosion at their own expense. These studies must be conducted by a N.J. Licensed Professional Engineer to guide the Township and/or its representative in making informed and sound and safe decisions. The Applicant will be required to set up an escrow account which fee will be set by resolution for the Township’s Professionals to review. The type of studies required are: 1.Ecological Survey- to assess threatened or endangered species, habitats and overall biodiversity in environmentally sensitive areas. 2.Geotechnical Report- to assess the stability and surface and subsurface properties of the ground to determine the consequences associated with the removal of trees in environmentally sensitive areas. 3.Hydrological Report- to assess the movement and management water associated with the impact of removing of trees in environmental sensitive areas. 17. If a permit is approved based on No. 16 above, prior to the issuance of a permit, applicant must provide a plan for a N.J. Licensed Professional Engineer for the short and longterm monitoring of environmentally sensitive areas such as cliffsides and steep slopes stability. The Applicant will be required to set up an escrow account for the Township’s Professionals to
and longterm monitoring of environmentally sensitive areas such as cliffsides and steep slopes stability. The Applicant will be required to set up an escrow account for the Township’s Professionals to review. c. Specific prohibitions related to construction activities: 1. In connection with any construction, prior to the issuance of a building permit or Deleted: connection with
start of construction, tree protection or other protective barriers, including a stormwater management barrier (Silt fencing around the limited line of disturbance (LOD)) shall be placed around trees that are not to be removed. The protective barriers shall be placed at the outermost edge beyond the drip line or tree canopy. All protective barriers shall remain in place until all construction activity is terminated. No equipment, chemicals, soil deposits or construction materials shall be placed within any area so protected by barriers. Any landscaping activities performed subsequent to the removal of the barriers shall be accomplished by hand labor and only using light machinery where necessary. 2. Storing and placing building material or debris or placing construction equipment within the drip line. d. Exemptions. The following are exempt from the permit requirement of Subsection (a) above: 1. Property owners may remove hazardous or non-viable trees under Emergency Conditions prior to obtaining a Tree Removal and Replacement Permit. However, following the emergency removal of the tree or trees, the property owner or agent thereof shall complete the Emergency Tree Removal and Replacement Form within seven (7) days of the removal. The person seeking emergency removal shall provide photographic and written proof of the Emergency Conditions by the Licensed Tree Expert to the Township Forester and 8 Commented [PS25]: Replace with “tree protection” Deleted: snow fencing Deleted: outennost Deleted: Deleted: Deleted: Deleted: Deleted: tenninated Deleted: Deleted: perfonned Deleted: by Deleted: Deleted: Qualified
File revisions (1)
- Sep 29, 2026
61a270d401e520,766,830 bytes