Packet · Jan 20, 2026

Township Council Meeting — Packet

Preserved file SHA-25648d99827ac0e6a228dfef9b1f62e97e50b4a30f08e31a6ff07fcb4dd04e6e746

Indexed text

Page 15

s because of language in New Jersey's Annual Appropriations Act, refusal to disclose campaign contributions otherwise required by N.J.S.A. 19:44A-20.3 et seq. and N.J.S.A 19:44A20.25 et seq., will not adversely affect your consideration for award." 4. Plans and Specifications 4.1 Subrecipient shall prepare, or have prepared, if required by the State, environmental documents, engineering documents, plans, specifications and estimates for the Project and shall submit them to the State for review. A Professional Engineer licensed to practice in New Jersey must prepare the plans and specifications. The State shall review the engineering documents, plans and specifications for conformance to program requirements and design standards. All design work shall conform to the applicable American Association of State Highway and Transportation Officials (AASHTO) design criteria, the current Manual on Uniform Traffic Control Devices (MUTCD), and the NJDOT Bicycle Compatible Roadway and Bikeways Planning and Design Guideline. However, the design 4

Page 16

October 2024 New Jersey Department of Transportation Division of Local Aid and Economic Development Federal Aid Cost Reimbursement Agreement of traffic barriers and drainage systems shall conform to the NJDOT and the current version of the NJDOT Roadway Design Manual in effect at the time this Agreement is executed. All workmanship and materials shall conform to the Standard Specifications. If there is a deviation from these standards, the Subrecipient shall notify the State in writing of any deviation from the standards and shall accept any and all responsibility for any injury and damage by such deviation to any person or property and shall indemnify the State as outlined in this Agreement. A Design Exception shall be executed when it can be documented to the State’s satisfaction that a lesser design value is the best practical alternative. The factors to be considered when determining if a lesser design value should be elected shall include social economic and environmental impacts together with safe and efficient traffic operations. 4.2 Approval for the Design Exception shall be based upon Division of Local Aid and Economic Development Policy Number 005.00 as follows: 4.2.1 All Design Exceptions for Local Aid projects on non-National Highways System (non-NHS) roadways must be prepared by a licensed professional engineer in the State of New Jersey and approved by the sponsor via a design exception certification. 4.2.2 Projects that are on NHS roads must follow the procedure outlined in the NJDOT Design Exception manual including approval by the Director of Design Services and the FHWA. 4.2.3 The above applies regardless of funding source. The State shall notify Subrecipient when the Project is acceptable for bidding. 4.3 For reimbursement of allowable costs, Project limits cannot be exceeded, plans and specifications altered, construction change orders issued, or items added or deleted from Project without prior written approval of the State. 5. Projects Eligible for Funding Under this Agreement 5.1 Right of Way Acquisition Projects 5.1.1 Subrecipient shall acquire Right of Way parcels in accordance with applicable federal and state requirements, including, but not limited to, 49 C.F.R. Part 24, 23 C.F.R. § 710.203, N.J.S.A. 20:4-1 to -22, the NJDOT Right of Way Acquisition Manual and the Standard Specifications. 5.1.2 Subrecipient shall

Page 16

ts, including, but not limited to, 49 C.F.R. Part 24, 23 C.F.R. § 710.203, N.J.S.A. 20:4-1 to -22, the NJDOT Right of Way Acquisition Manual and the Standard Specifications. 5.1.2 Subrecipient shall be responsible for preparing all maps and other documents required by the NJDOT Right of Way Acquisition Manual and Right of Way Engineering Manual. 5.1.3 Eligible costs for Right of Way acquisition projects shall include: 5

Page 17

New Jersey Department of Transportation Division of Local Aid and Economic Development Federal Aid Cost Reimbursement Agreement October 2024 5.1.3.1 Cost of real property which shall be based on the actual purchase price of the parcel or easement, after negotiating a purchase agreement, or the just compensation amount as determined by a court, and 5.1.3.2 Associated direct costs of acquisition pursuant to 23 C.F.R. § 710.203, including appraisal fees, cost estimates, Right of Way plan preparation, title work, cost to acquire real property, cost of administrative settlements, relocations, and damages. 5.1.4 5.2 Any amount paid to the Subrecipient under this Agreement for a parcel or easement that is later declared to be in excess and sold, may be recovered by the State. Design Projects 5.2.1 Subrecipient warrants that the engineering services shall be performed or approved by an engineer licensed by the State of New Jersey Board of Professional Engineers and Land Surveyors to practice in the State of New Jersey. 5.2.2 Subrecipient covenants that design work will comply with all applicable laws and other requirements of federal, state and local governmental bodies including applicable American Association of State Highway and Transportation Officials (AASHTO) design criteria, the current Manual on Uniform Traffic Control Devices (MUTCD), and the NJDOT Bicycle Compatible Roadway and Bikeways Planning and Design Guideline. 5.2.2.1 Certain projects shall require the pre-approval of the State, prior to the design phase, as to the applicable standards that apply, as follows: 5.2.2.1.1 Transportation projects other than roads and bridges, 5.2.2.1.2 Projects that intersect State highways, 5.2.2.1.3 Projects with railroad crossings within the project limits or 1000 feet outside the project limits, or 5.2.2.1.4 Projects with railroad crossings outside the project limits where the project could impact traffic flow across the railroad crossing. 5.2.3 Subrecipient shall prepare, or have prepared any necessary environmental documents, engineering documents, plans, specifications and estimates for the Project as required by Section 5.2 of this Agreement. 5.2.4 The Subrecipient shall not proceed with any design work for which reimbursement shall be sought without the specific written authorization of the State. It is agreed that any and all Project Costs incurred

Page 17

ubrecipient shall not proceed with any design work for which reimbursement shall be sought without the specific written authorization of the State. It is agreed that any and all Project Costs incurred by the Subrecipient prior to the execution of this Agreement by all parties shall be non-participating by the State and FHWA. 6

Page 18

October 2024 New Jersey Department of Transportation Division of Local Aid and Economic Development Federal Aid Cost Reimbursement Agreement 5.2.5 Subrecipient shall submit to the State documentation of the consultant selection process or use of in-house forces and final negotiated consultant cost proposal. In order to use in-house staff for design work, Subrecipient must allow the State to review its project accounting systems and be cost-basis approved by the State. 5.2.6 If Subrecipient is not performing design work in-house, Subrecipient shall solicit proposals in accordance with Section 3.8 of this Agreement. Upon receipt of proposals from responsible design consultants, Subrecipient shall select professional services based upon qualifications and shall furnish the name of such consultant to the State for concurrence. Subrecipient agrees not to contract with any consultant to whom the State has made a reasonable and timely objection. 5.2.7 If the design consultant is to be retained for construction engineering purposes during the construction phase, contracts with design consultants shall include stipulations on retaining the designer for that purpose during which the negotiated cost of the construction engineering activity should be part of the construction contract. 5.2.8 Subrecipient or its consultant shall be required to submit a design schedule to the State which should include, at a minimum, the submission dates for Project plans and descriptions for NEPA determination, environmental screening, environmental permits/approvals, preliminary plans specifications, and estimate, and for the funding authorization request package. 5.2.9 Funds for design work shall be authorized by the State once the design authorization submission has been approved. 5.2.10 Subrecipient agrees that all pedestrian facilities shall be designed to provide safe and easy accessibility for all users. These facilities shall comply with the Americans with Disabilities Act (ADA) of 1990, Section 504 of the Rehabilitation Act of 1973, 49 C.F.R. Part 27 , and the current version of the NJDOT Roadway Design Manual in effect at the time this Agreement is executed. 5.2.11 Subrecipient agrees that the monies requisitioned from the Project Fund will be used only to reimburse actual, eligible costs and for no other purpose. Subrecipient agrees that it shall provide to the

Page 18

Subrecipient agrees that the monies requisitioned from the Project Fund will be used only to reimburse actual, eligible costs and for no other purpose. Subrecipient agrees that it shall provide to the State, upon demand and at no cost to the State, such documentation as will enable the State to determine that the proceeds of the Project Fund have been applied solely to Project Costs. 5.2.12 When the Subrecipient considers the design work to be finally complete, Subrecipient shall request that the State's representative make a final review of the plans, specifications and estimate. If it is determined, after such review, that the design work has been completed in accordance with all applicable laws and requirements, Subrecipient shall submit a final invoice to the State and the State shall disburse an amount equal to the approved final payment. Upon payment of the amount approved for final payment, the State shall be released from any further responsibility in connection with the Project Fund and the Project design work. 7

Page 19

October 2024 5.3 New Jersey Department of Transportation Division of Local Aid and Economic Development Federal Aid Cost Reimbursement Agreement Construction Projects 5.3.1 Subrecipient shall complete or cause the completion of Project Work in accordance with the plans and specifications approved by the State. 5.3.2 Subrecipient covenants that Project Work will comply with all applicable laws and other requirements of federal, state and local governmental bodies. Subrecipient shall obtain all permits and licenses necessary to complete Project Work prior to federal authorization. 5.3.3 The Subrecipient shall not advertise the project until federal authorization for the Project is obtained and the State provides written authorization to proceed. 5.3.4 Subrecipient shall not proceed with any Project Work for which reimbursement shall be sought without the written authorization of the State. 5.3.5 Subrecipient shall solicit bids for Project Work in accordance with Section 3.8 of this Agreement. The Subrecipient shall advertise the project within sixty (60) days of the State’s authorization of funds and must award the project within six months of authorization of funds. The Subrecipient shall comply with, and cause all bidders to comply with, the applicable Civil Rights and bidding provisions of the Standard Specifications, including, but not limited to, Sections 102.13.01 and 105.02.05. Upon receipt of bids from responsible contractors, Subrecipient shall select the contractor submitting the lowest responsive bid. Within thirty (30) days of the award of the contract, the Subrecipient shall submit: 5.3.5.1 One copy of the summary of construction bids showing all bid quantities, unit prices, and amounts for the construction of pay items, and 5.3.5.2 A fully executed and sealed resolution awarding the contract to the lowest responsible bidder, which shall be subject to the approval of the State. 5.3.5.3 Once the State has received all of the information listed above, it shall notify Subrecipient in writing whether it has been approved. Subrecipient agrees not to contract with any contractor to whom the State has made a reasonable and timely objection. 5.3.6 Subrecipient shall submit to the State documentation of the consultant selection process or use of in-house forces and final negotiated consultant cost proposal. The use of in-house staff is

Page 19

. 5.3.6 Subrecipient shall submit to the State documentation of the consultant selection process or use of in-house forces and final negotiated consultant cost proposal. The use of in-house staff is permitted but is subject to the approval of the State. In order to use in-house staff for design work, Subrecipient must allow the State to review its project accounting systems and be cost-basis approved by the State. 5.3.7 If Subrecipient is not performing construction inspection work in-house, Subrecipient shall solicit proposals in accordance with Section 3.8 of this Agreement. Upon receipt of proposals from responsible consultants, Subrecipient shall select professional services based upon qualifications and shall furnish the 8

Page 20

October 2024 New Jersey Department of Transportation Division of Local Aid and Economic Development Federal Aid Cost Reimbursement Agreement name of such consultant to the State for concurrence. Subrecipient agrees not to contract with any consultant to whom the State has made a reasonable and timely objection. 5.3.8 Subrecipient agrees that the monies requisitioned from the Project Fund will be used only to reimburse actual, eligible Project Costs and for no other purpose. Subrecipient agrees that it shall provide to the State, upon demand and at no cost to the State, such documentation as will enable the State to determine that the proceeds of the Project Fund have been applied solely to Project Costs. 5.3.9 Upon written request of the State, the Subrecipient shall cause its contractor to provide payment and performance bonds in an amount equal to 100% of the cost of the Project Work. A surety company satisfactory to the State and qualified to do business in the State of New Jersey shall execute such bonds. Copies of all bonds shall be delivered to the State upon request. Only those sureties listed in the US Treasury Department Circular 570 and authorized to do business in the State shall furnish the surety bonds. Payment and performance bonds shall be part of the contract standard items. Performance and/or Payment bonds shall be billed to the State upon award of contract. 5.3.10 Foreign Materials And Equipment. Subrecipient agrees that it will comply and cause its contractor to comply with the Infrastructure Investment and Jobs Act (“IIJA”), Pub. L. No. 117-58, which includes the Build America, Buy America Act (“Buy America”), Pub. L. No. 117-58, §§ 70901-52 and implementing regulations, and § 106.03.2 of the current version the NJDOT Standard Specifications, which sets forth the federal requirements for the use of foreign materials and equipment on Federal-aid projects. 5.3.11 Subrecipient agrees that it shall cause its contractor to comply with Federal ADA requirements. All pedestrian facilities constructed or reconstructed shall provide safe and easy accessibility for all users. These facilities shall comply with the Americans with Disabilities Act (ADA) of 1990, Section 504 of the Rehabilitation Act of 1973 and 49 C.F.R. Part 27 and the current version of the NJDOT Roadway Design Manual in effect at the time this Agreement is executed. Failure