Town CrierWest Orange, New Jersey
← Back to search

Minutes · Sep 5, 2012

September 5, 2012

Preserved file SHA-256892edf6d3f06625e4b2462f7e85a4543687e507ef5f0f54d80322cd90c384adf

Indexed text · page 3

Show all pages
Page 3

Mr. Williams gave a brief description of the Application that had been approved with conditions at the August 16, 2012 Technical Review Subcommittee meeting. Mr. Williams introduced Richard Adelsohn, P.E., the Applicant’s engineer. Mr. Adelsohn was sworn in and accepted to be an expert witness. The Board and Mr. Adelsohn discussed the proposed interior renovations for a Regal Bank at the site of the former Sweet Basil’s Restaurant. Chairman Bagoff called for a vote on the Resolution. The Board voted on the Resolution as follows: Motion: Chairman Bagoff Second: Ms. Carlucci Carlucei Dd Eben Y Ghebremicael Y Gurland Y Heller Y Klein ¥. Lester - McCartney ¥ Weston Y Wilkes - Bagoff Y APPLICATION(S) PB-12-09/Prism Green Urban Renewal Associates IV, LLC Block: 66; Lots: 1, 5 & 7: Zone: E-MU 175-177 Main Street Amended Preliminary and Final Major Site Plan. Carried from the August 1, 2012 meeting. EXHIBITS: A-1 — Disc, Power Point Presentation entitled “West Orange Redevelopment Project Phase I” A-2 - Material Board A-3 — Color Rendering (two panels) A-4— Color Rendering of Main and Charles Street facade A-5 — Site Plan — Drawing 20.01 A-6 — Traffic Impact Study dated July 10, 2007 A-7 — Parking Structure Design Guidelines DISCUSSION Francis X. Regan, Esq., DeCotiis, FitzPatrick & Cole, LLP, attorney for the Applicant appeared before the Board. Mr. Regan said the testimony for the Application was a continuance from the July and August meetings. Mr. Regan re-introduced the Applicant’s traffic expert, William G. Lothian, P.E., Langan Engineering & Environmental Services. Mr. Lothian was advised he was still under oath. Mr. Regan said Mr. Lothian would provide additional testimony regarding issues the Board did not deem sufficiently addressed at the August 1, 2012 Planning Board meeting; specifically the adequacy of the project’s proposed garage. NAPLANNING. BRD\WP\MINUTES\201219-5-2012 Minutes.doc

File revisions (1)