Show all pagesto Exhibit A-8, (Site Suitability Assessment prepared by Seidel Planning & Design dated August 24, 2012), he described the property site. Additionally, Mr. Seidel said he had prepared the photographic simulations reflecting the current antenna configuration dated August 24, 2012, (Exhibit A-9); he proceeded to describe the photo simulations, Mr. Seidel said the proposed antennas would measure four-foot (4”) and eight-foot (8”) in diameter and be installed at an elevation of seventy-feet (70°) and one-hundred-feet (100°). Mr. Seidel said the antennas would be low on the tower; the visual impact would be very limited; the original proposal was to install antennas at 220 feet; the lower placement would result in additional screening by the existing trees. Mr, Seidel said and there would be no clustering, Mr. Seidel also said the tower would be structurally capable to handle the antennas. The Board inquired as to the existing conditions of the site. There was concern regarding whether the existing trees would provide adequate screening. Mr. Grygiel asked Mr. Seidel to confirm the correct current height of the tower; Mr. Seidel advised the height was 295 feet. Mr. Keller said he questioned the structural capabilities of the structure. Mr. Lemanowicz said the current analysis indicated that once modified, the tower could accommodate the proposed antennas. Mr. Lemanowicz said that structural work was being done on the tower. The Board advised that a condition of approval would be that antenna dishes would not be installed unless modifications had been completed. Chairman Bagoff' requested Mr. Keller and Mr. Grygiel review the Application checklist for completeness. Mr. Keller advised the Applicant to provide a copy of the property survey. Mr. Dwyer confirmed with Mr. Lemanowicz that documentation had been provided indicating all equipment was FCC compliant. Conditions: 1, The Applicant shall comply with all applicable Township, County, State and Federal laws, ordinances, regulations and directives, including without limitation, obtaining all applicable local, state and federal approvals and/or permits, Without limitation of the foregoing, prior to the signing of the approved site plans, and prior to the commencement of any land disturbance or construction, the Applicant shall submit to this Board, with a copy to the Board Engineer, proof that it has
igning of the approved site plans, and prior to the commencement of any land disturbance or construction, the Applicant shall submit to this Board, with a copy to the Board Engineer, proof that it has obtained all required governmental approvals. 2. If another governmental entity or agency grants a waiver or variance affecting the plans and/or exhibits submitted by the Applicant, this approval or the conditions attached to it, then the Applicant shall re-apply to this Board respecting the same and this Board shall have the right to view that issue as it relates to this approval and these conditions and modify and amend same, if appropriate. 3. In the event that any other required regulatory approval conflicts with the terms and conditions hereof, or materially alters the same, or the terms and conditions hereof are materially altered by any change in applicable law or regulation other than those municipal regulations for which change is prohibited by the Municipal Land Use Law (MLUL), or in the event Applicant or its successors or assigns construct or attempt to construct any NAPLANNING.BRIWAMINUTES\2012110-24-2012 Special Meeting Minutes.doc 7
File revisions (1)
- Sep 29, 2026
8c4a0a2a4a9d441,953 bytes