Minutes · Mar 21, 2013
March 21, 2013
60cc9bb507318a9c1ab3ad166dd3b58c71f282062d81cbf2ee13e2d8845d8881Indexed text · page 4
Show all pagesMr. Bullock asked Mr. Lieblich which header is missing; Mr. Lieblich said the header between the kitchen and family room. Ms. Gabry asked. Mr. Lieblich if the house is safe for occupancy; Mr. Lieblich said that it should be corrected right away. Chairman Neuer asked Mr. Leiblich to estimate the time frame for the corrections to be made; he replied that they should be made within a week or two weeks. Mr. Buechler asked Mr. Lieblich if he saw any concerns with the sitting area in the front of the house; Mr. Lieblich said that the floor bounces too much. Mr. Buechler asked Mr. Leiblich to explain what that means; he said that it must be fixed. Ms. Gabry asked Mr. Lieblich what is above the kitchen area; Mr. Lieblich replied there is nothing above that area. He said that the second floor extends to where the oven is in the kitchen and from that point to the rear of the house is one story. Mr. Quentzel noted that the windows were removed between the living room and the sitting area and asked Mr. Leiblich if that created any structural issues; he replied no. Chairman Neuer asked if there were any further questions for Mr. Licblich by Members of the Board or its professionals; seeing none. Chairman Neuer asked if any members of the public had any questions for Mr. Lieblich; seeing none the witness was excused. Chairman Neuer asked Mr, Singh if he did the work in his house; he replied yes. Chairman Neuer asked Mr. Singh what kind of work he does; Mr. Singh said he is a Network Engineer. Chairman Neuer asked Mr. Singh what kind of experience he has in the construction of homes; Mr. Singh said when he was younger he was a carpenter’s helper and does side jobs. Chairman Neuer asked Mr. Singh who designed this project; Mr. Singh said him and his father. Chairman Never told Mr. Singh that the Board’s concern is for the safety of his family. He said that they are going to have to open up the walls so that the electrical and plumbing can be inspected and that there is still more work to be done. Mr. Singh said that he will not be doing the work himself this time. Chairman Neuer asked if there were any questions for Mr. Singh by Members of the Board or its professionals; secing none. Chairman Neuer asked if any members of the public had any questions for Mr. Singh; seeing none. The Chairman closed the record for this hearing and opened the floor for discussion.
File revisions (1)
- Sep 29, 2026
60cc9bb50731350,006 bytes