Town CrierWest Orange, New Jersey
← Back to search

Minutes · Oct 27, 2011

October 27, 2011

Preserved file SHA-256c286ba7b7a8c8be068900e05b725041330276e26451dc1e71aea0231f44c5d8f

Indexed text · page 2

Show all pages
Page 2

SWEARING IN Township Professionals, Planning Director Susan Borg and Township Consulting Engineer Eric Keller were sworn under oath. 2012 MEETING SCHEDULE The Zoning Board of Adjustment 2012 meeting schedule was presented to the Board for adoption. Chairman Neuer moved to change the June 21, 2012 meeting date to June 14, 2012. Ms. Gabry made a motion to adopt the 2012 Zoning Board of Adjustment meeting schedule, and Mr. Buechler seconded. All were in favor. RESOLUTIONS 1. ZB-11-05/Carp, Gerald and Ellen Approved 9/22/11 Block: 82.02; Lot: 13.05; Zone: R-1 63 Ridge Road. Seeking “C” variances for the height of an existing fence and setbacks of an existing tennis court Ms. Beirne stated that, after speaking to Mr. Lorber, she had incorporated some changes to this resolution that was submitted to the Board. Mr. Buechler stated that he also incorporated changes to this resolution. Mr. Bullock made a motion to adopt as per amendments; Mr. Buechler seconded. All were in favor. 2. ZB-11-09/Slomack Approved 9/22/11 Block: 112.01; Lot: 20; Zone: R-i 1 Long Branch Way, Llewellyn Park “D” variance for height on newly constructed house Mr. Buechler made a motion to adopt as per amendments; Ms, Gabry seconded. All were in favor. APPLICATIONS 1. ZB-11-15/GigaBeam Carried to 11/17/11 Block: 84.01; Lot: 22; Zone: B-2 “D” variance for use to place two (2) six foot dish antennas on an existing tower and necessary equipment to be cabinet mounted on H-frame at ground level. Chairman Neuer announced that this application will not be heard tonight. The applicant requested being carried over to the 11/17/11 meeting.

File revisions (1)