Minutes · Apr 2, 2014

April 2, 2014

Preserved file SHA-2562d8ab2553bae3ce68bea272405751edd726dae854da284fe3ceae67d9753a15d

Indexed text · page 7

Show all pages
Page 7

EXHIBITS A-1: Colored rendering of Landscaping Plan prepared by Scoit Alan Design Incorporated (undated); A-2: Grading Plan (Drawing No. C-200), signed by Barry J. Sutherland, P.E., TRC Engineers, Inc., dated 7/11/13, 4" revision dated 4/1/14; A-3: — Utility Plan (Drawing No. C-300), signed by Barry J. Sutherland, P.E., TRC Engineers, Inc. dated 7/11/13; 4" revision dated 4/1/14. DISCUSSION William C. Sullivan, Jr., Esq., Scarinci & Hollenbeck, LLC, attorney for Applicant, advised the Board the Application was for final site plan approval for 100 residential units that had been granted preliminary site plan approval by Board Resolution in September 2013. The preliminary approval included several conditions; the final plan would show the conditions had been satisfied; the final plan included a detailed landscaping plan and other revisions based on subsequent comments and recommendations made by Township professionals. Mr. Sullivan explained that at the March 13, 2013 Technical Review Subcommittee meeting, Fire Official Captain Longo stated there had to be a 20 ft. wide access on the river side of the building; the requirement would have wiped out all landscaping recommendations made by the Board. Subsequently, Mr. Sullivan had spoken with Captain Longo who clarified that the Fire Department needed 20 ft. access for fire and emergency vehicles and equipment; not a 20 ft. wide zone void of all landscaping; Captain Longo indicated that with one exception, the canopy tree, the proposed landscaping plan did provide adequate access. Captain Longo requested there be an 8 ft. wide area open so there would not be overhanging branches to obstruct fire truck access. Scott A. Levy, LLA, Scott Alan Design Incorporated, was sworn in, stated his credentials, and accepted by the Board to be an expert in landscape architecture. Mr. Levy said he had prepared the landscaping plan dated October 9, 2013 and Exhibit A-1, which was based on the comments made at the Tech Review meeting and the Omland memorandum dated March 19, 2014. Exhibit A-1 depicted the area of planting along the walkway in the area of Mitchell Street and Central Avenue. Mr. Levy described the landscaping plan, which included street trees, hedgerows, planting beds of ground cover and shrubs. The walkway would be stamped colorized concrete paving 8 ft. in width; there would be an 8 ft width strip between

Page 7

lan, which included street trees, hedgerows, planting beds of ground cover and shrubs. The walkway would be stamped colorized concrete paving 8 ft. in width; there would be an 8 ft width strip between the building and the walkway. In the area near the stream, there would be a series of benches; the area would include under-plantings and seed mix along the streambed slope to help stabilize soil erosion. Mr. Klein inquired if the design took in to account the shade and sun of the area; Mr. Levy confirmed the microclimate of the area had been considered. Mr. Eben inquired if a maintenance manual for the landscaping would be provided to the owner. Mr. Levy answered in the affirmative. Referring to the Omland memo dated March 19, 2014 Council President McCartney inquired if the recommendations regarding a detailed landscaping plan had been satisfied; she opined that Exhibit A-1 did not reflect same. Mr. Sullivan indicated that the rendering included the 20 ft. wide access for fire equipment that would be revised. Council President McCariney inquired if the Applicant would be retaining ownership and maintenance. Mr. Sullivan confirmed the Applicant would be retaining ownership and maintenance. NAPLANNING.BRDO\WP\MINUTES(2014\4-2-14 Minutes.doc 7

File revisions (1)