Minutes · Apr 2, 2014
April 2, 2014
2d8ab2553bae3ce68bea272405751edd726dae854da284fe3ceae67d9753a15dIndexed text · page 8
Show all pagesMr. Russo asked Mr. Levy for clarification regarding Comment #8 and Comment #10 (Omland memo dated March 19, 2014). Mr. Levy said no vine plantings were included; but columnar trees could be incorporated; planters would be hard to incorporate but more seasonal color could be added to the overall plan. There were no questions for Mr. Levy from the Public Advocate or Public. Barry J. Sutherland, PE, TRC Engineers, Inc., was sworn in, stated his credentials and was accepted by the Board to be an expert in civil engineering. Mr. Sullivan questioned Mr. Sutherland regarding satisfying the conditions of the preliminary approval; Mr. Sutherland said he had provided an updated lighting plan but would have to defer to the final landscaping plan before he could complete the lighting. Mr. Sutherland confirmed he would address Comment #14 (Omiand memo dated 3/19/14), to correct any conflicts between the fixtures and landscape stock. Referring to Exhibits A-2 and A-3, Mr. Sutherland detailed the grading and utility plans. Mr. Sullivan addressed the comments individually; he asked Mr. Sutherland to detail action taken to satisfy all issues. Council President McCartney asked about the DEP flood plan; Mr. Sutherland said the building was set one foot above the one hundred year flood plain. Mr. Eben asked for clarification that opening up the brook and adding landscaping would help the water flooding problem; Mr. Sutherland said it would help with (water) storage in the area; he described how the water would flow. Mr. Grygiel asked about garbage collection; Mr. Sullivan said that there would be public collection, but if it appeared the storage area could not handle the quantity, they would hire a private collector to supplement collection. Stephen L. Schoch, AIA, Kitchen & Associates, was sworn in, stated his credentials and was accepted by the Board to be an expert in architecture. Mr. Sullivan asked Mr. Schoch to confirm standpipes would be at each end of the building and at the building midpoint; he described the fire suppression system; he confirmed a Knox box would be installed; he described the sustainable building materials to be used and the energy efficient measures. Mr. Eben asked when construction would begin; Mr. Schoch estimated by the end of summer. Dr. Bagoff asked if there would be a light colored roof; Mr. Schoch answered in the affirmative. Council
res. Mr. Eben asked when construction would begin; Mr. Schoch estimated by the end of summer. Dr. Bagoff asked if there would be a light colored roof; Mr. Schoch answered in the affirmative. Council President McCartney asked if there would be any shade trees in the parking area. Mr. Schoch deferred to Mr. Levy. Mr. Levy said there was not enough room io plant trees in the area of the parking lot. Mr. Weston asked if the electrical equipment would be on pads because of the flood area; Mr. Schoch said elecirical panels would be as high as possible; all equipment would be on utility pads; pump equipment would be located on the floor. There were no questions for Mr. Schoch from the Public Advocate or Public. Dr. Bagoff inquired if property taxes had been paid; the Board Secretary confirmed that the Applicant had provided proof that taxes had been paid certified by the office of the Municipal Tax Collector. There were no comments from the Public Advocate or Public regarding the Application. NAPLANNING. BRD\IWPAMINUTES\2074\4-2-14 Minutes.doc 8
File revisions (1)
- Sep 29, 2026
2d8ab2553bae463,519 bytes