Minutes · Apr 17, 2014
April 17, 2014
ae20df5a1c750c4d2fad7a059fd80c34eef364da5f0f784d56aa26a207442d02Indexed text · page 4
Show all pagessaid that the applicant was required to provide additional information before the Board would vote on the application. Mr. Pryor said that he did provide certification from the Zoning Manager of the property that authorized Communication Infrastructure to proceed with this application but said he was not able to get some of the other documentation for this meeting. He said that it will be up to the Board to vote tonight subject to the Engineer’s data still being required. Mr. Neuer asked Mr. Pryor if he wanted the Board to take a vote at this meeting because there are only five voting members present and he needs three affirmative votes. Mr. Pryor consulted with his client and asked the Board if they could come back at the special Zoning Board meeting on April 24" after having a chance to speak to the Engineer. Chairwoman Gabry stated that she disagreed with Mr. Pryor coming back at the special meeting on April 24" because it would not be fair to the applicant that is paying for the meeting. Mr. Neuer suggested that they could allow Mr. Pryor’s client thirty minutes of that meeting after the break. Chairwoman Gabry reiterated how she felt about this applicant coming to the special meeting and said that she feels that is not the right thing to do. Mr. Pryor said that he would ask the attorney who is representing the applicant who scheduled the special meeting on April 24" if he could have thirty minutes of the meeting. He then asked the Board to have this application carried over to the special hearing date on April 24" or, if there was a problem, carried over to the next regular Zoning Board meeting on May 15". Mr. Neuer asked Mr. Pryor to state the name of the applicant; he replied Communication Infrastructure. Mr. Neuer asked Mr. Pryor if Communication Infrastructure is licensed to operate the system; he said that they have an FCC license which allows them to operate between certain frequency bands. Mr. Neuer stated for the record that Communication Infrastructure will be carried to the April 24" special Zoning Board meeting or that the attorney should check with the Board Secretary if there is a change. He said that no further notice will be necessary. Mr. Neuer stepped down and Ms. Gabry resumed her place as Chairperson. 2. ZB-13-13/Alvarez Carried from 3/20/14 Block: 170; Lot: 15; Zone: R-2 608 Mt. Pleasant Avenue Bulk variances for building a
y. Mr. Neuer stepped down and Ms. Gabry resumed her place as Chairperson. 2. ZB-13-13/Alvarez Carried from 3/20/14 Block: 170; Lot: 15; Zone: R-2 608 Mt. Pleasant Avenue Bulk variances for building a single family house EXHIBITS A-\ — Site plan, page C-1, with a revision date of 1/30/14 A-2 — First and second floor plans ~— 2 sheets.
File revisions (1)
- Sep 29, 2026
ae20df5a1c75551,421 bytes