Town CrierWest Orange, New Jersey
← Back to search

Minutes · Jul 24, 2014

July 24, 2014

Preserved file SHA-2564c892eda88e7fda0d072a2bb9d306209bab10ba8b3c297f0ed610ed465b8ff2c

Indexed text · page 2

Show all pages
Page 2

APPLICATION 1. ZB-13-15/Quick Chek Corp. Carried from 4/24/14 Block: 168; Lot: 26, 28; Zone: B-2 555 Northfield Avenue Seeking multiple “D” and several “C” variances for site plan and subdivision Approvals for developing a Quick Chek food store with fuel sales. EXHIBITS A-14 — Reduced size version of Exhibit A-5 sheet 4 of 15 of the site plan dated 5/18/14 A-15 — Revised site plan rendering prepared by Bohler Engineering dated 7/22/14 A-16 — Reduces size version of Exhibit A-15 of the site plan dated 7/22/14 A-17 — Reduced size version of Exhibit A-8 of photo simulation prepared by Michael Beradesco Studio A-18 — Revised photo simulation prepared by Michael Beradesco Studio (not dated) A-19 — Reduces size version of Exhibit A-18 (not dated) A-20 — WBSO Truck turing Exhibit prepared by Bohler Engineering dated — revision date of 6/23/14 A-2{ — SU Truck turning Exhibit, prepared by Bohler Engineering — revision date of 6/23/14 A-22 — Revised photo simulation prepared by Michael Berardesco Studio (not dated) A-23 — Revised color rendered building elevations prepared by gkt+a Architects dated 6/20/14 A-24 — Hotel side wall 2D elevation Exhibit, prepared by gi-ta Architects dated 7/23/14 Chairman Buechler stated that he read the transcripts from the special mecting for the Quick Chek application that was held on 4/24/14 and signed and returned the form that was provided to him by the Board Secretary stating such. Jennifer M. Porter, Esq., attorney for the applicant, approached the podium. Ms. Porter stated that the application was last heard at a special meeting held on 4/24/14. She said that testimony at that meeting was provided by Jeff Albanese who is in charge of operations and other aspects of the site for Quick Chek. Ms. Porter stated that testimony was also provided by Grayson Murray, the site engineer for Bohler Engineering, at the last meeting. Ms. Porter stated that the application before this Board is in six parts and detailed them. She said that the first aspect of this application is the preliminary and final subdivision approval. Ms. Porter said that the applicant is proposing to move the existing {ot line in order to create a new lot. She said that the lot line adjustment is classified as a major subdivision. Ms. Porter stated that the second aspect of this application is the preliminary and final site plan approval for the

Page 2

w lot. She said that the lot line adjustment is classified as a major subdivision. Ms. Porter stated that the second aspect of this application is the preliminary and final site plan approval for the development of a convenience store and gas filling station that would include six gas pump islands. Ms. Porter stated that the third aspect of this application is the conditional variance relief for the gas filling station. She said that a convenience store is allowed in the B-2 zone but the gas station requires conditional use approval.

File revisions (1)