Minutes · Aug 21, 2014
August 21, 2014
9e3f967bf74a8e6b2cd7c31cf95f61beee2f80735879b035a4da8386162a35e4Indexed text · page 6
Show all pagesMr. Bullock asked Mr. Meola to point out the curb cut on the plans. Chairman Buechler asked Mr. Keller if the Engineer addressed items #1-6 on his report dated 8/20/14; he replied yes. He said that item #5 will be addressed by their architect. Mr. Keller referred to item #6 regarding the storm pipe that runs under the building having no easement. He said that the engineer said that the applicant has agreed to provide an easement for the portions of the property where there is no building. Mr. Keller said that no one can get to that pipe to clean it out and maintain it and that he is assuming that this is the Township’s storm water sewer. Mr, Neuer asked Mr. Keller if the property ties into that sewer line; he said he did not know. Mr. Neuer stated that someone failed to document the existing pipe that runs under the building. He said that the easement will run from one end of the property and then from the other end of the property. Chairman Buechler stated that Mr. Sullivan’s client will accept the easement with that language, Mr. Meola addressed item #8 stating that the parking layout on Dogwood Road has been revised. Mr. Meola addressed item #9 and stated that they have provided a pedestrian connection to the sidewalk from the rear to the front of the building. Mr. Meola stated that the architect will address item #10. Mr. Meola stated that items #1 1-14 have been addressed. Mr. Meola addressed item #15 stating that the existing inlet within the southerly parking area has been inspected. He said that the roof leaders in the back of the building go into a new 12” PVC pipe as shown on the plans. Mr. Meola stated that they will conform to the cleaning of the drains Mr. Neuer asked Mr. Keller if he would need the calculations before they are cleaned; he said that they can provide the calculations after. Mr. Meola stated that they will comply with item #16 regarding connecting the proposed inlet to an existing inlet. Mr. Meola stated that item #17 has been addressed. Mr. Meola addressed item #18 and stated that the freestanding fixture on Northfield Avenue will yemain as shown on the plans. He said that this was discussed at the last meeting. Mr. Meola addressed item #19 regarding the hours of operation for the building’s mixed uses. He stated that the beauty salon closes at 9 pm and the parking lot lights will be closed at 10 pm.
File revisions (1)
- Sep 29, 2026
9e3f967bf74a449,916 bytes