Minutes · Oct 1, 2014
October 1, 2014
982a34a8f43a3293fde528151d4c5dfa8e44cefaff65afc407503194192490f2Indexed text · page 6
Show all pagesthe unit from a potential car or truck impact; and the dumpster would be relocated to the area of the existing loading dock and would be screened, Mr. Grygiel asked if loading area had enough room for the dumpster; Mr. Faris said the loading dock had enough room for two trucks; it would be able to accommodate the relocated dumpster. The Public Advocate and the Public had no questions for Mr. Faris. William G. Lothian, P.E., Langan Engineering and Environmental Services, Inc. was sworn in, stated his credentials, and was accepted by the Board to be an expert in civil engineering. In response to inquiry from Mr. Geffner for the requested parking variance, Mr. Lothian said the generator installation would remove two parking spaces to reduce the total number of spaces from 394 to 392. He said the generator would be located in the lower parking area that was not usually occupied; there was ample on-site parking, the loss of two spaces would not be missed. In response to inquiry from Council President McCartney, Mr. Lothian said the building was currently fully occupied and had ample parking; there was no plan to increase the size of the building so there would not be a need for additional parking in the future. The Township professionals, Public Advocate and the Public had no questions for Mr. Lothian. The Board, Township professionals, Public Advocate and Public had no comments on the Application. Conditions: 1 The Applicant shall comply with all applicable Township, County, State and Federal laws, ordinances, regulations and directives, including without limitation, obtaining all applicable local, state and federal approvals and/or permits. Without limitation of the foregoing, prior to the signing of the approved site plans, and prior to the commencement of any land disturbance or construction, the Applicant shall submit to this Board, with a copy to the Board Engineer, proof that it has obtained all required governmental approvals. 2. If another governmental entity or agency grants a waiver or variance affecting the plans and/or exhibits submitted by the Applicant, this approval or the conditions attached to it, then the Applicant shall re-apply to this Board respecting the same and this Board shall have the right to view that issue as it relates to this approval and these conditions and modify and amend same, if appropriate. 3. In the event that any
oard respecting the same and this Board shall have the right to view that issue as it relates to this approval and these conditions and modify and amend same, if appropriate. 3. In the event that any other required regulatory approval conflicts with the terms and conditions hereof, or materially alters the same, or the terms and conditions hereof are materially altered by any change in applicable law or regulation other than those municipal regulations for which change is prohibited by the Municipal Land Use Law (MLUL), or in the event Applicant or its successors or assigns construct or attempt to construct any improvement in conflict with or in violation of the terms of this approval, the Board hereby reserves the right to withdraw, amend or supplant the instant approval. 4. All construction, use and development of the property shall be in conformance with the plans approved herein, all representations of the Applicant and its witnesses during the
File revisions (1)
- Sep 29, 2026
982a34a8f43a366,401 bytes