Town CrierWest Orange, New Jersey
← Back to search

Minutes · Dec 3, 2014

December 3, 2014

Preserved file SHA-256078d3ddf554600f2ef9492e978c66b631ac3a75ac91e840984d500b5f4e1385f

Indexed text · page 2

Show all pages
Page 2

APPLICATION(S) PB-14-06/AutoZone Northeast, Inc. Store No. 4744 Block: 60; Lots: 1.01 and 2.01; Zone: B-1 7 Main Street Preliminary and final major site plan and minor subdivision with “c” variances. Carried from the July 2, 2014 regular meeting. DISCUSSION Francis J. DeVito, Esq., attorney for the Applicant, addressed the Board. He stated the Applicant wanted to build on the site but had encountered several design issues; additionally the property owner had some legitimate concerns with the project. The changes to the site plans the Board requested had been taken into consideration and discussed with AutoZone (Corporate). The entire project had to be re-budgeted. There was a problem with the discharge of storm water in to the City of Orange sewer system; an on-site infiltration system had to be designed. Mr. DeVito advised the Board that all revisions should be ready by the February 2015 meeting; he requested the Application be carried to the January 7, 2015 meeting; and then to the February 4, 2015 meeting for the Application to be heard. Vice Chairman opined that so much time had lapsed since the last hearing, that in the interest of the Public, the Applicant should re-publish Public Notice in the West Orange Chronicle; Mr. Dwyer concurred. The Township professionals and Public had no questions or comments. Mr. DeVito agreed to publish a Public Notice in the West Orange Chronicle indicating the Application would be carried to the February 4, 2015 regular meeting. Chairman Heller announced the Application would be carried to the January 7, 2015 regular meeting, and then to the February 4, 2015 regular meeting. PB-14-07/Communication Infrastructure Corporation Block: 84.01; Lot: 22; Zone: B-2 10 Marcella Avenue Amended Site Plan. EXHIBITS A-1: Sheet Z-1—Site Plan, prepared by Richard A. Boelter, PE, Powder River Development Services, LLC, last revised November 18, 2013. DISCUSSION James K. Pryor, Esq., attorney for the Applicant, advised the Board the Application involved amending a prior approval made by the Board on August 7, 2013 for the installation of two new antennas to an existing tower with ancillary cable equipment to be installed inside an existing building at 10 Marcella Avenue. However, once the equipment was in place it was determined that there was no room inside the existing building and the equipment had been installed

Page 2

d inside an existing building at 10 Marcella Avenue. However, once the equipment was in place it was determined that there was no room inside the existing building and the equipment had been installed inside a

File revisions (1)