Town CrierWest Orange, New Jersey
← Back to search

Minutes · Oct 23, 2014

October 23, 2014

Preserved file SHA-256d8341e5b3c128bed2965218ecfee7e61ac812a3953302ecf897da7302b9b2738

Indexed text · page 9

Show all pages
Page 9

Chairman Buechler instructed Mr. Franco to also tell the Board Secretary the name of the person who built the deck. He told Mr. Franco that if he did not do this then he has no credibility. Chairman Buechler stated that there is a lot more extensive work done on the property and asked Mtr. Grygiel to visit the site to see what was done. Ms. Gabry said that the Board is going to need a full disclosure from the Franco’s. Mr. Franco said that they built the retaining wall and then leveled the back yard. He said then they put a fence on top of the wall and after they leveled it, they built the swimming pool deck. Mr. Franco said that he will move the swimming pool deck. Chairman Buechler instructed Mr. Franco not to do any work until after they come back for the next Zoning Board hearing. Mr. Neuer told Mr. Franco to bring an estimate to the next meeting for moving the swimming pool deck and the swimming pool. Chairman Buechler stated that, according to the survey, the retaining wall is .4/10 over the property line. He said told Mr. Franco that he has to either move the wall over or come to a financial agreement with Dr, Blank and file an casement so that a sub division is not needed. The meeting was adjourned by Chairman Buechler at 9:40 pm. Adopted: December 11, 2014 /p, A, f tif Rose DeSena Zoning Board Secretary

File revisions (1)